114 Matching Results

Results open in a new window/tab.

Regional Highlights from Global Climate Change Impacts in the United States (open access)

Regional Highlights from Global Climate Change Impacts in the United States

This fact sheet draws information from the Global Climate Change Impacts in the United States report that describes how climate change affects coastal areas in the United States.
Date: June 2009
Creator: U.S. Global Change Research Program
Object Type: Text
System: The UNT Digital Library
Regional Highlights from Global Climate Change Impacts in the United States (open access)

Regional Highlights from Global Climate Change Impacts in the United States

This fact sheet describes climate change scenarios in the Great Plains region of the United States.
Date: 2009
Creator: U.S. Global Change Research Program
Object Type: Text
System: The UNT Digital Library
Habitat Evaluation Procedures Report: Carl Property - Yakama Nation. (open access)

Habitat Evaluation Procedures Report: Carl Property - Yakama Nation.

A baseline habitat evaluation procedures (HEP) analysis was conducted on the Carl property (160 acres) in June 2007 to determine the number of habitat units to credit Bonneville Power Administration (BPA) for providing funds to acquire the property as partial mitigation for habitat losses associated with construction of McNary Dam. HEP surveys also helped assess the general ecological condition of the property. The Carl property appeared damaged from livestock grazing and exhibited a high percentage of invasive forbs. Exotic grasses, while present, did not comprise a large percentage of the available cover in most areas. Cover types were primarily grassland/shrubsteppe with a limited emergent vegetation component. Baseline HEP surveys generated 356.11 HUs or 2.2 HUs per acre. Habitat units were associated with the following HEP models: California quail (47.69 HUs), western meadowlark (114.78 HUs), mallard (131.93 HUs), Canada goose (60.34 HUs), and mink (1.38 HUs).
Date: February 2008
Creator: Ashley, Paul R. & Muse, Anthony
Object Type: Report
System: The UNT Digital Library
Habitat Evaluation Procedures Report: Graves Property - Yakama Nation (open access)

Habitat Evaluation Procedures Report: Graves Property - Yakama Nation

A habitat evaluation procedures (HEP) analysis was conducted on the Graves property (140 acres) in June 2007 to determine the number of habitat units to credit Bonneville Power Administration (BPA) for providing funds to acquire the property as partial mitigation for habitat losses associated with construction of McNary Dam. HEP surveys also documented the general ecological condition of the property. The Graves property was significantly damaged from past/present livestock grazing practices. Baseline HEP surveys generated 284.28 habitat units (HUs) or 2.03 HUs per acre. Of these, 275.50 HUs were associated with the shrubsteppe/grassland cover type while 8.78 HUs were tied to the riparian shrub cover type.
Date: February 2008
Creator: Ashley, Paul & Muse, Anthony
Object Type: Report
System: The UNT Digital Library
[News Clip: Alzheimer's] captions transcript

[News Clip: Alzheimer's]

Video footage from the KXAS-TV/NBC station in Fort Worth, Texas, to accompany a news story about the importance of fruit juices to prevent Alzheimer's from an early age.
Date: August 31, 2006
Creator: KXAS-TV (Television station : Fort Worth, Tex.)
Object Type: Video
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - AFRC Everett, WA (open access)

2005 BRAC Commission Final COBRA Run - AFRC Everett, WA

2005 BRAC Commission Final COBRA Run - AFRC Everett, WA - 46 - RC Transformation in Washington\Everett
Date: March 29, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - USA-0232v3 RC Transformation in WA AFRC Fairchild WA wAF (open access)

2005 BRAC Commission Final COBRA Run - USA-0232v3 RC Transformation in WA AFRC Fairchild WA wAF

2005 BRAC Commission Final COBRA Run - USA-0232v3 RC Transformation in WA AFRC Fairchild WA wAF - 46 - RC Transformation in Washington\Fairchild
Date: March 29, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - USA-0232v3 RC Transformation in WA AFRC Yakima WA (open access)

2005 BRAC Commission Final COBRA Run - USA-0232v3 RC Transformation in WA AFRC Yakima WA

2005 BRAC Commission Final COBRA Run - USA-0232v3 RC Transformation in WA AFRC Yakima WA - 46 - RC Transformation in Washington\Yakima
Date: March 29, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - DON-0053, C5, V6.10, 22APR05 (open access)

2005 BRAC Commission Final COBRA Run - DON-0053, C5, V6.10, 22APR05

2005 BRAC Commission Final COBRA Run - DON-0053, C5, V6.10, 22APR05 - 76 - Navy Reserve Centers\Navy Reserve Centers - Tacoma, WA.
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - COBRA Air Force 51 Realign Fairchild AFB  Spokane  WA (open access)

2005 BRAC Commission Final COBRA Run - COBRA Air Force 51 Realign Fairchild AFB Spokane WA

2005 BRAC Commission Final COBRA Run - COBRA Air Force 51 Realign Fairchild AFB Spokane WA - 116Z - Fairchild
Date: March 27, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
BRAC Commission - Executive Correspondence (open access)

BRAC Commission - Executive Correspondence

Contains Chairman's letter to Washington State CODEL concerning Joint Basing
Date: January 6, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Letter
System: The UNT Digital Library
Community Input - Fairchild AFB, WA (open access)

Community Input - Fairchild AFB, WA

Community Input - Fairchild AFB, WA.
Date: January 5, 2006
Creator: unknown
Object Type: Text
System: The UNT Digital Library
Base Visit Book (open access)

Base Visit Book

Contains Base Visit Book- McChord Air Force Base, WA.
Date: December 14, 2005
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Book
System: The UNT Digital Library
BRAC Analysis - Notes and Research (open access)

BRAC Analysis - Notes and Research

Contains base input from Joint Cross Service Team Analyst Lesia Mandzia regarding McChord AFB, WA
Date: December 8, 2005
Creator: unknown
Object Type: Text
System: The UNT Digital Library
Tsunami Risk Reduction for the United States: A Framework for Action (open access)

Tsunami Risk Reduction for the United States: A Framework for Action

This document describes proposals for making communities better prepared and more resilient to catastrophic natural disasters like the Indian Ocean tsunami in 2006. Methods described include warning systems, data sharing, and land use decisions.
Date: December 2005
Creator: National Science and Technology Council (U.S.). Subcommittee on Natural Disaster Reduction.
Object Type: Text
System: The UNT Digital Library
Executive Correspondence - Letter dtd 10/13/05 from Chairman Principi to WA Senators Cantwell and Murray, as well as WA Representatives Dicks and Smith (open access)

Executive Correspondence - Letter dtd 10/13/05 from Chairman Principi to WA Senators Cantwell and Murray, as well as WA Representatives Dicks and Smith

Executive Correspondence - Letter dtd 10/13/05 from Chairman Principi to WA Senators Cantwell and Murray, as well as WA Representatives Dicks and Smith in reply to their joint letter dated 10/05/05 requesting clarification on Commission Recommendation #146.
Date: October 14, 2005
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Letter
System: The UNT Digital Library
Executive Correspondence - Letter from BRAC Commission Chairman Principi to Senator Cantwell, Senator Murray, Rep Smith and Rep Dicks of Washington state dtd 13 October 2005 (open access)

Executive Correspondence - Letter from BRAC Commission Chairman Principi to Senator Cantwell, Senator Murray, Rep Smith and Rep Dicks of Washington state dtd 13 October 2005

Executive Correspondence - Letter from BRAC Commission Chairman Principi to Senator Cantwell, Senator Murray, Rep Smith and Rep Dicks of Washington state dtd 13 October 2005 regarding October 5th letter DCN: 10731 regarding Commission Recommendation 146 Joint Basing w/Ft. Lewis and McChord AFB.
Date: October 13, 2005
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Letter
System: The UNT Digital Library
Executive Correspondence - Letter from Washington state Sen. Murray, Sen. Cantwell, Rep. Dicks and Rep. Smith dtd 5 Oct 2005 (open access)

Executive Correspondence - Letter from Washington state Sen. Murray, Sen. Cantwell, Rep. Dicks and Rep. Smith dtd 5 Oct 2005

Executive Correspondence - Letter from Washington state Sen. Murray, Sen. Cantwell, Rep. Dicks and Rep. Smith dtd 5 Oct 2005, regarding the formation of Joint Base Lewis-McChord from the distinct bases of Fort Lewis and McChord AFB.
Date: October 12, 2005
Creator: unknown
Object Type: Letter
System: The UNT Digital Library
Letter from Congressman Norm Dicks (R-WA) to Chairman Principi dtd 1 Oct 2005 (open access)

Letter from Congressman Norm Dicks (R-WA) to Chairman Principi dtd 1 Oct 2005

Executive Correspondence - Letter from Congressman Norm Dicks (R-WA) to Chairman Principi dtd 1 Oct 2005, regarding the formation of Joint Base Lewis McChord from the distinct bases of Fort Lewis and McChord AFB.
Date: October 12, 2005
Creator: unknown
Object Type: Letter
System: The UNT Digital Library
Army Installations and State Action Papers - Washington (open access)

Army Installations and State Action Papers - Washington

Disregard Restriction of Header and Footer: Army Installations and State Action Papers - Washington
Date: September 22, 2005
Creator: United States. Department of Defense.
Object Type: Text
System: The UNT Digital Library

Final Cobra Run - Army RC Transformation Everett WA

Final Cobra Run - Army RC Transformation Everett WA
Date: September 15, 2005
Creator: United States. Department of Defense.
Object Type: Dataset
System: The UNT Digital Library

Final Cobra Run - Army RC Transformation Fairchild WA

Final Cobra Run - Army RC Transformation Fairchild WA
Date: September 15, 2005
Creator: United States. Department of Defense.
Object Type: Dataset
System: The UNT Digital Library

Final Cobra Run - Army RC Transformation Yakima WA

Final Cobra Run - Army RC Transformation Yakima WA
Date: September 15, 2005
Creator: United States. Department of Defense.
Object Type: Dataset
System: The UNT Digital Library

Final Cobra Run - Naval Reserve Center Tacoma, WA

Final Cobra Run - Naval Reserve Center Tacoma, WA
Date: September 14, 2005
Creator: United States. Department of Defense.
Object Type: Dataset
System: The UNT Digital Library