Resource Type

1,904 Matching Results

Results open in a new window/tab.

2.1 Pan-WCRP Monsoon Modelling Workshop Summary (open access)

2.1 Pan-WCRP Monsoon Modelling Workshop Summary

Ken Sperber led a discussion of the outcome of the Pan-WCRP Monsoon Modelling Workshop that was held at the University of California at Irvine from 15-17 June 2005. At the workshop presentations from key CLIVAR and GEWEX panels were presented to highlight the outstanding problems in modelling the Earth's monsoons. Additionally, presentations from invited experts were given to highlight important aspects of monsoon phenomena and processes, such as low-level jets, air-sea interaction, predictability, observational networks/studies, and model test beds etc. Since all persons attending the CLIVAR AAMP meeting were present for all, or most, of the monsoon workshop, a detailed description of the workshop presentations was not given. Rather, the discussion was focused on the recommendations of the workshop breakout groups and their relevance to CLIVAR AAMP. CLIVAR AAMP endorsed the near-term workshop recommendation of investigating the diurnal cycle using a hierarchy of models a key way forward for promoting CLIVAR/GEWEX interactions. In GCM studies CLIVAR researchers have identified the diurnal cycle as a forced ''mode'' of variability that is poorly represented in terms of amplitude and phase, especially in the case of precipitation. Typical phase errors of 6-12 hours are noted over both land and ocean in GCMs. CLIVAR …
Date: June 28, 2005
Creator: Sperber, K R
System: The UNT Digital Library
AN-102 Simulant Sr/TRU Precipitation and Ultrafiltration (open access)

AN-102 Simulant Sr/TRU Precipitation and Ultrafiltration

The objective of these tests was to gather data on performance of the single-tube crossflow ultrafilter unit to de-water the simulant precipitate derived from a project approved tank 241-AN-102 simulant. Upon completion of the objectives with the approved R1 simulant, the simulant specification was changed and additional work at modified precipitation conditions was requested.
Date: April 28, 2003
Creator: Zamecnik, J. R.
System: The UNT Digital Library
200 Area Deactivation Project Facilities Authorization Envelope Document (open access)

200 Area Deactivation Project Facilities Authorization Envelope Document

Project facilities as required by HNF-PRO-2701, Authorization Envelope and Authorization Agreement. The Authorization Agreements (AA's) do not identify the specific set of environmental safety and health requirements that are applicable to the facility. Therefore, the facility Authorization Envelopes are defined here to identify the applicable requirements. This document identifies the authorization envelopes for the 200 Area Deactivation.
Date: March 28, 2000
Creator: Dodd, E. N.
System: The UNT Digital Library
300 AREA PACIFIC NORTHWEST NATIONAL LABORATORY FACILITY RADIONUCLIDE EMISSION POINTS AND SAMPLING SYSTEMS (open access)

300 AREA PACIFIC NORTHWEST NATIONAL LABORATORY FACILITY RADIONUCLIDE EMISSION POINTS AND SAMPLING SYSTEMS

Radionuclide emission points for 300 Area and Battelle Private facilities are presented herein. The sampling systems and associated emission specifics are detailed.
Date: August 28, 2006
Creator: Barfuss, Brad C.; Barnett, J. M. & Harbinson, L Jill
System: The UNT Digital Library
401(k) Plans: Policy Changes Could Reduce the Long-term Effects of Leakage on Workers' Retirement Savings (open access)

401(k) Plans: Policy Changes Could Reduce the Long-term Effects of Leakage on Workers' Retirement Savings

A letter report issued by the Government Accountability Office with an abstract that begins "Under federal regulations, 401(k) participants may tap into their accrued retirement savings before retirement under certain circumstances, including hardship. This "leakage" from 401(k) accounts can result in a permanent loss of retirement savings. GAO was asked to analyze (1) the incidence, amount, and relative significance of the different forms of 401(k) leakage; (2) how plans inform participants about hardship withdrawal provisions, loan provisions, and options at job separation, including the short- and long-term costs of each; and (3) how various policies may affect the incidence of leakage. To address these matters, GAO analyzed federal and 401(k) industry data and interviewed federal officials, pension experts, and plan administrators responsi- ble for managing the majority of 401(k) participants and assets."
Date: August 28, 2009
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
S. 625, The Bankruptcy Reform Act, in the Senate: Selected Amendments (open access)

S. 625, The Bankruptcy Reform Act, in the Senate: Selected Amendments

From Summary: "This report surveys selected amendments to the bill which were passed prior to adjournment. On November 4, 1999, before adjournment of the first session of the 106th Congress, S. 625, 106th Cong., 1st Sess. (1999), the Bankruptcy Reform Act, was brought to the floor of the Senate for consideration. More than 300 germane and nongermane amendments were offered."
Date: January 28, 2000
Creator: Jeweler, Robin
System: The UNT Digital Library
2000 Census: Analysis of Fiscal Year 2000 Budget and Internal Control Weaknesses at the U.S. Census Bureau (open access)

2000 Census: Analysis of Fiscal Year 2000 Budget and Internal Control Weaknesses at the U.S. Census Bureau

A letter report issued by the General Accounting Office with an abstract that begins "In September 2000, the U.S. Census Bureau told Congress that it had at least $305 million in budget savings out of its $4.5 billion fiscal year 2000 no-year appropriations for the 2000 decennial census. Of the $4.5 billion appropriated to the U.S. Census Bureau in fiscal year 2000, lower-than-expected expenditures and obligations resulted in available balances of at least $415 million. A lower-than-expected support staff workload reduced salary and benefit costs by about $348 million. Enumerator workload is largely determined by the initial mail response rate for returned census questionnaires. The initial mail response of 64 percent meant that Census enumerators did not have to visit more than three million American households. However, the available balances from the higher mail response rate and the lower support staff workload were partially offset by about $100 million of higher salary and benefit costs for enumerators, including a higher workload for unanticipated recounts. According to Bureau data, enumerator productivity did not significantly affect budget variances for the 2000 decennial census. The Bureau reported the national average time to visit a household and complete a census questionnaire was about the …
Date: December 28, 2001
Creator: United States. General Accounting Office.
System: The UNT Digital Library
2002 Hyperspectral Analysis of Hazardous Waste Sites on the Savannah River Site (open access)

2002 Hyperspectral Analysis of Hazardous Waste Sites on the Savannah River Site

Hazardous waste site inspection is a labor intensive, time consuming job, performed primarily on the ground using visual inspection and instrumentation. It is an expensive process to continually monitor hazardous waste and/or landfill sites to determine if they are maintaining their integrity. In certain instances, it may be possible to monitor aspects of the hazardous waste sites and landfills remotely. The utilization of multispectral data was suggested for the mapping of clays and iron oxides associated with contaminated groundwater, vegetation stress, and methane gas emissions (which require longer wavelength detectors). The Savannah River Site (SRS) near Aiken, S.C. is a United States Department of Energy facility operated by the Westinghouse Savannah River Company. For decades the SRS was responsible for developing weapons grade plutonium and other materials for the nation's nuclear defense. Hazardous waste was generated during this process. Waste storage site inspection is a particularly important issue at the SRS because there are over 100 hazardous waste sites scattered throughout the 300 mile complex making it difficult to continually monitor all of the facilities. The goal is to use remote sensing technology to identify surface anomalies on the hazardous waste sites as early as possible so that remedial work …
Date: August 28, 2003
Creator: Gladden, J. B.
System: The UNT Digital Library
2004 Environmental Report (open access)

2004 Environmental Report

The Lawrence Livermore National Laboratory (LLNL) annual Environmental Report, prepared for the Department of Energy (DOE) and made available to the public, presents summary environmental data that characterizes site environmental management performance, summarizes environmental occurrences and responses reported during the calendar year, confirms compliance with environmental standards and requirements, and highlights significant programs and efforts. By explaining the results of effluent and environmental monitoring, mentioning environmental performance indicators and performance measure programs, and assessing the impact of Laboratory operations on the environment and the public, the report also demonstrates LLNL's continuing commitment to minimize any potentially adverse impact of its operations. The combination of environmental and effluent monitoring, source characterization, and dose assessment showed that radiological doses to the public caused by LLNL operations in 2004 were less than 0.26% of regulatory standards and more than 11,000 times smaller than dose from natural background. Analytical results and evaluations generally showed continuing low levels of most contaminants; remediation efforts further reduced the concentrations of contaminants of concern in groundwater and soil vapor. In addition, LLNL's extensive environmental compliance activities related to water, air, endangered species, waste, wastewater, and waste reduction controlled or reduced LLNL's effects on the environment. LLNL's environmental program …
Date: September 28, 2005
Creator: Althouse, P E; Bertoldo, N. A.; Brown, R. A.; Campbell, C. B.; Clark, L. M.; Gallegos, G. M. et al.
System: The UNT Digital Library
2005 Habitat Evaluation Procedure (HEP) Report for the Priest River Project (open access)

2005 Habitat Evaluation Procedure (HEP) Report for the Priest River Project

On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Priest River property, an acquisition completed by the Kalispel Tribe of Indians in 2001. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Priest River Project provides a total of 105.41 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 26.95 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Grassland habitat provides 23.78 HUs for Canada goose and mallard. Scmb-shrub vegetation provides 54.68 HUs for mallard, yellow warbler, and white-tailed deer.
Date: February 28, 2005
Creator: Entz, Ray
System: The UNT Digital Library
2005 Habitat Evaluation Procedure (HEP) Report for the Tacoma Creek South Project (open access)

2005 Habitat Evaluation Procedure (HEP) Report for the Tacoma Creek South Project

On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Tacoma Creek South property, an acquisition completed by the Kalispel Tribe of Indians in June 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Tacoma Creek South Project provides a total of 190.79 Habitat Units (HUs) for the species evaluated. Emergent wetlands provide 20.51 HUs for Canada goose, mallard, and muskrat. Grassland provides 1.65 HUs for Canada goose and mallard. Scrub-shrub vegetation provides 11.76 HUs for mallard, yellow warbler, and white-tailed deer. Conifer forest habitat provides 139.92 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Deciduous forest also provides 19.15 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. The objective of using HEP at the Tacoma Creek South Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of …
Date: February 28, 2005
Creator: Entz, Ray
System: The UNT Digital Library
2005 Habitat Evaluation Procedure (HEP) Report for the Upper Trimble Project (open access)

2005 Habitat Evaluation Procedure (HEP) Report for the Upper Trimble Project

On July 13, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Upper Trimble property, an acquisition completed by the Kalispel Tribe of Indians in March 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Upper Trimble Project provides a total of 250.67 Habitat Units (HUs) for the species evaluated. Wet meadow provides 136.92 HUs for mallard, muskrat, and Canada goose. Mixed forest habitat provides 111.88 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Scrub-shrub vegetation provides 1.87 HUs for yellow warbler, and white-tailed deer. The objective of using HEP at the Upper Trimble Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, …
Date: February 28, 2005
Creator: Entz, Ray
System: The UNT Digital Library
2005 Habitat Evaluation Procedure (HEP) Report for the West Beaver Lake Project (open access)

2005 Habitat Evaluation Procedure (HEP) Report for the West Beaver Lake Project

On September 7, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the West Beaver Lake property, an acquisition completed by the Kalispel Tribe of Indians in September 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The West Beaver Lake Project provides a total of 103.08 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 7.17 HUs for mallard and muskrat. Conifer forest habitat provides 95.91 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. The objective of using HEP at the West Beaver Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process …
Date: February 28, 2005
Creator: Entz, Ray
System: The UNT Digital Library
2006 Physics and Advanced Technologies In the News (open access)

2006 Physics and Advanced Technologies In the News

None
Date: March 28, 2007
Creator: Hazi, A. U.
System: The UNT Digital Library
8th International Workshop on the Physics of Compressible Turbulent Mixing (open access)

8th International Workshop on the Physics of Compressible Turbulent Mixing

None
Date: November 28, 2001
Creator: Evans, K
System: The UNT Digital Library
Abortion: Legislative Response (open access)

Abortion: Legislative Response

The primary focus of this issue brief is legislative action in the 108th Congress with respect to abortion. However, discussion of those legislative proposals necessarily involves a brief discussion of the leading U.S. Supreme Court decisions concerning a woman’s right to choose whether to terminate her pregnancy. For a more detailed discussion of the relevant case law, see CRS Report 95-724, Abortion Law Development: A Brief Overview.
Date: March 28, 2003
Creator: Lewis, Karen J.; Shimabukuro, Jon O. & Ely, Dana
System: The UNT Digital Library
Accelerator Mass Spectrometric (AMS) Measurements of Plutonium Activity Concentrations and 240Pu/239Pu Atom Ratios In Soil Extracts Supplied by the Carlsbad Environmental Monitoring & Research Center (open access)

Accelerator Mass Spectrometric (AMS) Measurements of Plutonium Activity Concentrations and 240Pu/239Pu Atom Ratios In Soil Extracts Supplied by the Carlsbad Environmental Monitoring & Research Center

Plutonium-239 ({sup 239}Pu) and plutonium-239+240 ({sup 239+240}Pu) activities concentrations and {sup 240}Pu/{sup 239}Pu atom ratios are reported for a series of chemically purified soil extracts received from the Carlsbad Environmental Monitoring & Research Center (CEMRC) in New Mexico. Samples were analyzed without further purification at the Lawrence Livermore National Laboratory (LLNL) using accelerator mass spectrometry (AMS). This report also includes a brief description of the AMS system and internal laboratory procedures used to ensure the quality and reliability of the measurement data.
Date: February 28, 2005
Creator: Hamilton, T F; Brown, T A; Marchetti, A A; Martinelli, R E & Kehl, S R
System: The UNT Digital Library
Access to Broadband Networks (open access)

Access to Broadband Networks

From Summary: "The report then reviews various legislative proposals affecting network access to assess their potential impact on broadband network provider's ability to mange their networks and to practice anticompetitive strategic behavior."
Date: June 28, 2006
Creator: Goldfarb, Charles B.
System: The UNT Digital Library
Accounting for false negatives in hotspot detection (open access)

Accounting for false negatives in hotspot detection

Hotspot sampling designs are used in environmental sampling to identify the location of one (or more) contiguous regions of elevated contamination. These regions are known as hotspots. The problem of how to calculate the probability of detecting an elliptical hotspot using a rectangular or triangular grid of sampling points was addressed by Singer and Wickman in 1969. This approach presumed that any sample which coincided with a hotspot would detect the hotspot without error. However, for many sampling methodologies, there is a chance that the hotspot will not be detected even though it has been sampled directly--a false negative. We present a mathematical solution and a numerical algorithm which account for false negatives when calculating the probability of detecting hotspots that are circular in shape.
Date: August 28, 2007
Creator: Sego, Landon H. & Wilson, John E.
System: The UNT Digital Library
Accounting Problems Reported in Major Companies Since Enron (open access)

Accounting Problems Reported in Major Companies Since Enron

This report questions the increase in corporate accounting restatements made since the 1980s and early 1990s following the wake of the collapse of Enron. Moreover, the report summarizes the accounting problems of major corporations that have been reported since Enron. Finally, the report wonders if these issues are standard within American companies or if they have all only been isolated issues.
Date: January 28, 2003
Creator: Jickling, Mark
System: The UNT Digital Library
Accounting Reform After Enron: Issues in the 108th Congress (open access)

Accounting Reform After Enron: Issues in the 108th Congress

This report discusses the anxieties within Congress in the wake of the Enron scandal. Moreover, the report notes that the 108th Congress is not likely to pass legislative reform as extreme as the 107th Congress, but will still confront issues of accounting reform. The report also highlights what the 108th Congress plans to reform.
Date: May 28, 2003
Creator: Jickling, Mark
System: The UNT Digital Library
Achieve Continuous Injection of Solid Fuels into Advanced Combustion System Pressures (open access)

Achieve Continuous Injection of Solid Fuels into Advanced Combustion System Pressures

This report is a descriptive journey of the Achieve Continuous Injection of Solid Fuels into Advanced Combustion System Pressures.
Date: February 28, 2008
Creator: Aldred, Derek L. & Saunders, Timothy
System: The UNT Digital Library
ACRF Ingest Software Status: New, Current, and Future - February 2007 (open access)

ACRF Ingest Software Status: New, Current, and Future - February 2007

The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests.
Date: February 28, 2007
Creator: Koontz, A. S.; Choudhury, S.; Ermold, B. D. & Gaustad, K. L.
System: The UNT Digital Library
Adaptive Management for Decision Making at the Program and Project Levels of the Missouri River Recovery Program (open access)

Adaptive Management for Decision Making at the Program and Project Levels of the Missouri River Recovery Program

The paper, “Adaptive Management: Background for Stakeholders in the Missouri River Recovery Program,” introduced the concept of adaptive management (AM), its principles and how they relate to one-another, how AM is applied, and challenges for its implementation. This companion paper describes how the AM principles were applied to specific management actions within the Missouri River Recovery Program to facilitate understanding, decision-making, and stakeholder engagement. For context, we begin with a brief synopsis of the Missouri River Recovery Program (MRRP) and the strategy for implementing adaptive management (AM) within the program; we finish with an example of AM in action within Phase I of the MRPP.
Date: February 28, 2009
Creator: Thom, Ronald M.; Anderson, Michael G.; Tyre, Drew & Fleming, Craig A.
System: The UNT Digital Library