Argonne National Laboratory Institutional Plan FY 2000 - FY 2005. (open access)

Argonne National Laboratory Institutional Plan FY 2000 - FY 2005.

None
Date: December 22, 1999
Creator: Beggs, S. D. & Director, Office of The
System: The UNT Digital Library
INEEL Institutional Plan - FY 2000-2004 (open access)

INEEL Institutional Plan - FY 2000-2004

In this first Institutional Plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus it's efforts on three strategic thrusts; (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R&D, demonstration, and deployment (initial focus on biofuels and chemical from biomass). The first strategic thrust focuses on meeting DOE-EM's environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex - the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NE's needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this Institutional Plan is designed to meet basic DOE requirements for content and structure and reflect the …
Date: November 1, 1999
Creator: Enge, Ray Stevenson
System: The UNT Digital Library
TFA Multiyear Program Plan FY99-FY03 (open access)

TFA Multiyear Program Plan FY99-FY03

None
Date: September 28, 1998
Creator: Allen, R. W.
System: The UNT Digital Library
Compatibility Grab Sampling and Analysis Plan for FY 2000 (open access)

Compatibility Grab Sampling and Analysis Plan for FY 2000

This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility. It is written in accordance with requirements identified in Data Quality Objectives for Tank Farms Waste Compatibility Program (Mulkey et al. 1999) and Tank Farm Waste Transfer Compatibility Program (Fowler 1999). In addition to analyses to support Compatibility, the Waste Feed Delivery program has requested that tank samples obtained for Compatibility also be analyzed to confirm the high-level waste and/or low-activity waste envelope(s) for the tank waste (Baldwin 1999). The analytical requirements to confirm waste envelopes are identified in Data Quality Objectives for TWRS Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for Low-Activity Waste Feed Batch X (Nguyen 1999a) and Data Quality Objectives for RPP Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for High-Level Waste Feed Batch X (Nguyen 1999b).
Date: December 29, 1999
Creator: Sasaki, L. M.
System: The UNT Digital Library
River Protection Project FY 2000 Multi Year Work Plan Summary (open access)

River Protection Project FY 2000 Multi Year Work Plan Summary

The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort.
Date: August 27, 1999
Creator: LENSEIGNE, D.L.
System: The UNT Digital Library
TFA FY00-FY04 Multiyear Program Plan (open access)

TFA FY00-FY04 Multiyear Program Plan

This multiyear program plan (MYPP) reflects the TFA's plan for the next five fiscal years (FY00-FY04). Most of the planning emphasis is on FY00 and FY01.
Date: August 24, 1999
Creator: Allen, Robert W.; Brouns, Thomas M.; Carteret, Betty A.; Gilchrist, Roger L.; Schlahta, Stephan N.; Westsik, Joseph H. et al.
System: The UNT Digital Library
Functional Design Criteria for Fy 1993-2000 Groundwater Monitoring Wells (open access)

Functional Design Criteria for Fy 1993-2000 Groundwater Monitoring Wells

The purpose of this revision is to update the Line Item Project, 93-L-GFW-152 Functional Design Criteria (FDC) to reflect changes approved in change control M-24-91-6, Engineering Change Notices (ECNs), and expand the scope to include subsurface investigations along with the borehole drilling. This revision improves the ability and effectiveness of maintaining RCRA and Operational groundwater compliance by combining borehole and well drilling with subsurface data gathering objectives. The total projected number of wells to be installed under this project has decreased from 200 and the scope has been broadened to include additional subsurface investigation activities that usually occur simultaneously with most traditional borehole drilling and monitoring well installations. This includes borehole hydrogeologic characterization activities, and vadose monitoring. These activities are required under RCRA 40 CFR 264 and 265 and WAC 173-303 for site characterization, groundwater and vadose assessment and well placement.
Date: January 1, 1996
Creator: Williams, B. A.
System: The UNT Digital Library
Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000 (open access)

Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.
Date: March 3, 1995
Creator: unknown
System: The UNT Digital Library
Hanford Site Environment Safety and Health (ES and H) FY 1999 and FY 2000 Execution Commitment Summary (open access)

Hanford Site Environment Safety and Health (ES and H) FY 1999 and FY 2000 Execution Commitment Summary

All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the S&H resources that support these activities. The fiscal year (FY) 1999 and 2000 information (Sieracki 1999) and data contained in the ''Hanford Site Environment, Safety and Health Fiscal Year 2001 Budget-Risk Management Summary'' (RL 1999) were the basis for preparing this report. Fiscal year 2000 finding of Office of Environmental Management (EM) and Office of Nuclear Energy, Science and Technology (NE) activities is based on the President's budget of $1,065.1 million and $28.0 million, plus $2.7 million carryover finding, respectively, as of October 31, 1999. Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2002 ES&H Budget-Risk Management Summary to be issued in May 2000. This report provides the end-of-year status of FY 1999 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2000 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included …
Date: December 1, 1999
Creator: Reep, I. E.
System: The UNT Digital Library
Oil program implementation plan FY 1996--2000 (open access)

Oil program implementation plan FY 1996--2000

This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be …
Date: April 1, 1995
Creator: unknown
System: The UNT Digital Library
Institutional Plan, FY 1995--2000 (open access)

Institutional Plan, FY 1995--2000

Sandia recently completed an updated strategic plan, the essence of which is presented in chapter 4. Sandia`s Strategic Plan 1994 takes its direction from DOE`s Fueling a Competitive Economy: Strategic Plan and provides tangible guidance for Sandia`s programs and operations. Although it is impossible to foresee precisely what activities Sandia will pursue many years from now, the strategic plan makes one point clear: the application of our scientific and engineering skills to the stewardship of the nation`s nuclear deterrent will be central to our service to the nation. We will provide the necessary institutional memory and continuity, experience base, and technical expertise to ensure the continued safety, security, and reliability of the nuclear weapons stockpile. As a multiprogram laboratory, Sandia will also continue to focus maximum effort on a broad spectrum of other topics consistent with DOE`s enduring core mission responsibilities: Defense (related to nuclear weapons), Energy, Environment (related to waste management and environmental remediation), and Basic Science.
Date: October 1, 1994
Creator: unknown
System: The UNT Digital Library
TFA Tank Focus Area - multiyear program plan FY98-FY00 (open access)

TFA Tank Focus Area - multiyear program plan FY98-FY00

The U.S. Department of Energy (DOE) continues to face a major radioactive waste tank remediation problem with hundreds of waste tanks containing hundreds of thousands of cubic meters of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Approximately 80 tanks are known or assumed to have leaked. Some of the tank contents have reacted to form flammable gases, introducing additional safety risks. These tanks must be maintained in a safe condition and eventually remediated to minimize the risk of waste migration and/or exposure to workers, the public, and the environment. However, programmatic drivers are more ambitious than baseline technologies and budgets will support. Science and technology development investments are required to reduce the technical and programmatic risks associated with the tank remediation baselines. The Tanks Focus Area (TFA) was initiated in 1994 to serve as the DOE`s Office of Environmental Management`s (EM`s) national technology development program for radioactive waste tank remediation. The national program was formed to increase integration and realize greater benefits from DOE`s technology development budget. The TFA is responsible for managing, coordinating, and leveraging technology development to support DOE`s four major tank sites: Hanford Site (Washington), Idaho National Engineering and Environmental Laboratory (INEEL) (Idaho), …
Date: September 1, 1997
Creator: unknown
System: The UNT Digital Library
Idaho National Engineering and Environmental Laboratory institutional plan -- FY 2000--2004 (open access)

Idaho National Engineering and Environmental Laboratory institutional plan -- FY 2000--2004

In this first institutional plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus its efforts on three strategic thrusts: (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R and D, demonstration, and deployment (initial focus on biofuels and chemicals from biomass). The first strategic thrust focuses on meeting DOE-EMs environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex--the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NEs needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this institutional plan is designed to meet basic DOE requirements for content and structure and reflect the …
Date: December 1, 1999
Creator: Enge, R.S.
System: The UNT Digital Library
Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan (open access)

Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.
Date: March 1, 1998
Creator: unknown
System: The UNT Digital Library
Institutional Plan Argonne National Laboratory FY 2000--FY 2005 [October 1999] (open access)

Institutional Plan Argonne National Laboratory FY 2000--FY 2005 [October 1999]

This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The product of many discussions between DOE and Argonne program managers, the Draft Institutional Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. The final Plan also reflects programmatic priorities developed during Argonne's summer strategic planning process and the allocation of Laboratory Directed Research and Development funds.
Date: December 2, 1999
Creator: Beggs, S. D.
System: The UNT Digital Library
Statements of work for FY 1995 to 2000 (open access)

Statements of work for FY 1995 to 2000

The activities and tasks needed to successfully prepare an interim, preliminary, and final performance assessment on the disposal of the low-level fraction of Hanford tank wastes are given. Included are analytic, experimental, computational, writing, and approval tasks. These statements of work will be revised annually.
Date: April 26, 1995
Creator: Mann, F. M.
System: The UNT Digital Library
Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004 (open access)

Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.
Date: August 1, 1999
Creator: Chartock, Mike (ed.) & Hansen, Todd (ed.)
System: The UNT Digital Library
Pacific Northwest National Laboratory institutional plan FY 1998--2002 (open access)

Pacific Northwest National Laboratory institutional plan FY 1998--2002

Pacific Northwest National Laboratory`s core mission is to deliver environmental science and technology in the service of the nation and humanity. Through basic research the lab creates fundamental knowledge of natural, engineered, and social systems that is the basis for both effective environmental technology and sound public policy. They solve legacy environmental problems by delivering technologies that remedy existing environmental hazards, they address today`s environmental needs with technologies that prevent pollution and minimize waste, and they are laying the technical foundation for tomorrow`s inherently clean energy and industrial processes. The lab also applies their capabilities to meet selected national security, energy, and human health needs; strengthen the US economy; and support the education of future scientists and engineers. The paper summarizes individual research activities under each of these areas.
Date: 1997
Creator: unknown
System: The UNT Digital Library
Superconductivity for electric systems program plan, FY 1996--FY 2000 (open access)

Superconductivity for electric systems program plan, FY 1996--FY 2000

This describes a comprehensive, integrated approach for the development of HTS (high-temperature superconductivity) technology for cost-effective use in electric power applications. This approach supports the program`s mission: to develop the technology that could lead to industrial commercialization of HTS electric power applications, such as fault-current limiters, motors, generators, transmission cables, superinductors, and superconducting energy storage. The vision is that, by 2010, the US power systems equipment industry will regain a major share of the global market by offering superconducting products that outperform the competition; and in US, the power grid will gain increased efficiency and stability by incorporating many kinds of HTS devices. After an overview and a discussion of the program plan (wires, systems technology, partnership initiative), this document discusses technology status, stakeholders, and the role of US DOE.
Date: March 1, 1996
Creator: unknown
System: The UNT Digital Library
Lawrence Berkeley Laboratory Institutional Plan FY 1995--2000 (open access)

Lawrence Berkeley Laboratory Institutional Plan FY 1995--2000

This report presents the details of the mission and strategic plan for Lawrence Berkeley Laboratory during the fiscal years of 1995--2000. It presents summaries of current programs and potential changes; critical success factors such as human resources; management practices; budgetary allowances; and technical and administrative initiatives.
Date: December 1, 1994
Creator: unknown
System: The UNT Digital Library