Degree Department

Degree Discipline

Degree Level

2 Matching Results

Results open in a new window/tab.

Mail Order Music: the Hinners Organ Company in the Dakotas, 1879-1936 (open access)

Mail Order Music: the Hinners Organ Company in the Dakotas, 1879-1936

Founded in 1879 by John L. Hinners, the Hinners Organ Company developed a number of stock models of small mechanical-action instruments that were advertised throughout the Midwest. Operating without outside salesmen, the company was one of the first to conduct all of its affairs by mail, including the financial arrangements, selection of the basic design, and custom alterations where required. Buyers first met a company representative when he arrived by train to set up the crated instrument that had been shipped ahead of him. Tracker organs with hand-operated bellows were easily repaired by local craftsmen, and were suited to an area that, for the most part, lacked electricity. In all, the company constructed nearly three thousand pipe organs during its sixty years of operation. Rapid decline of the firm began in the decade prior to 1936 during which the company sold fewer than one hundred instruments, and closed in that year when John's son Arthur found himself without sufficient financial resources to weather the lengthy depression. The studies of the original-condition Hinners organs in the Dakotas include extensive photographs and measurements, and provide an excellent cross section of the smaller instruments produced by the company. They are loud, excellently crafted, …
Date: August 1997
Creator: Alcorn-Oppedahl, Allison A. (Allison Ann)
Object Type: Thesis or Dissertation
System: The UNT Digital Library
Baseline Risk Assessment of Ground Water Contamination at the Inactive Uraniferous Lignite Ashing Site Near Bowman, North Dakota (open access)

Baseline Risk Assessment of Ground Water Contamination at the Inactive Uraniferous Lignite Ashing Site Near Bowman, North Dakota

This baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota, evaluates the potential impacts to public health or the environment from contaminated ground water at this site. This contamination is a result of the uraniferous lignite ashing process, when coal containing uranium was burned to produce uranium. Potential risk is quantified only for constituents introduced by the processing activities and not for the constituents naturally occurring in background ground water in the site vicinity. Background ground water, separate from any site-related contamination, imposes a percentage of the overall risk from ground water ingestion in the Bowman site vicinity. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is developing plans to address soil and ground water contamination at the site. The UMTRA Surface Project involves the determination of the extent of soil contamination and design of an engineered disposal cell for long-term storage of contaminated materials. The UMTRA Ground Water Project evaluates ground water contamination. Based on results from future site monitoring activities as defined in the site observational work plan and results from this risk assessment, the DOE will propose an approach for managing contaminated ground …
Date: November 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library