Safety Evaluation Report: Related to the Preliminary Design of the Standard Reference System RESAR-414 (open access)

Safety Evaluation Report: Related to the Preliminary Design of the Standard Reference System RESAR-414

From introduction: This Safety Evaluation Report summarizes the results of the technical evaluation of the proposed RESAR-414 design performed by the NRC staff, and delineates the scope of the technical matters considered in evaluating the radiological safety aspects of the RESAR-414 design. Environmental aspects were not considered in our review of RESAR-414, but will be addressed in each utility application for a construction permit which references RESAR-414.
Date: 1978
Creator: U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation.
System: The UNT Digital Library
Final Environmental Statement by the U.S. Nuclear Regulatory Commission for Greene County Nuclear Power Plant (open access)

Final Environmental Statement by the U.S. Nuclear Regulatory Commission for Greene County Nuclear Power Plant

Abstract: A Final Environmental Statement for the Power Authority of the State of New York for the construction of the Greene County Nuclear Power Plant (Docket No. 50-549) located in Greene County, New York, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission (NRC). This statement provides (1) a summary of environmental impact and adverse effects of the proposed facility, and (2) a consideration of principal alternatives. Also included are comments of governmental agencies and other organizations on the Draft Environmental Statement for the project and staff responses to these comments. The NRC staff has concluded, based on a weighing of environmental, economic, technical, and other benefit against environmental costs and available alternatives, that a construction permit should be denied because the alternative sites available to the applicant are environmentally preferable. If the permit is granted, the applicant will be required to take the necessary mitigating actions to decrease the aesthetic impact by using alternative closed cycle cooling systems and to undertake monitoring programs to identify, evaluate and mitigate construction related community and public services impacts in the immediate three-county impact area.
Date: January 1979
Creator: U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation.