Leveling Drive Assembly Base to Gimba and Ring

Technical drawing showing the layout of leveling drive assembly base to gimba and ring including labeled scale drawings, revisions and explanatory notes. Scale 1:0.5 inches.
Date: December 1966
Creator: unknown
System: The Portal to Texas History

Schematic: Thermistor Mounting Board Assembly

Technical drawing depicting schematic diagram of thermistor board assembly of an active seismic experiment including resistors, circuits and revisions.
Date: December 1966
Creator: Cunningham, S.
System: The Portal to Texas History

Schematic: Pre-Amplifier

Technical drawing of active seismic experiment (ASE) of pre-amplifier schematic including revisions and a short note
Date: December 1966
Creator: Meb
System: The Portal to Texas History

Assembly - Long Period Preamplifier

Technical drawing showing the layout of assembly - long period preamplifier including labeled scale drawings, revisions and explanatory notes. Scale 1:0.25 inches.
Date: December 1966
Creator: unknown
System: The Portal to Texas History

Assembly - Short Period Sensor Calibration

Technical drawing showing the layout of assembly - short period sensor calibration including labeled scale drawings, revisions and explanatory notes. Scale 1:0.25 inches.
Date: December 9, 1966
Creator: unknown
System: The Portal to Texas History

Schematic: Detector Package (Dust Detector)

schematic diagram showing the layout of detector package (dust detector) including labeled scale drawings, revisions and explanatory notes.
Date: December 1966
Creator: Hoffina, R.
System: The Portal to Texas History