Resource Type
6 Matching Results
Results open in a new window/tab.
Results:
1 - 6 of
6
Leveling Drive Assembly Base to Gimba and Ring
Technical drawing showing the layout of leveling drive assembly base to gimba and ring including labeled scale drawings, revisions and explanatory notes. Scale 1:0.5 inches.
Date:
December 1966
Creator:
unknown
System:
The Portal to Texas History
Schematic: Thermistor Mounting Board Assembly
Technical drawing depicting schematic diagram of thermistor board assembly of an active seismic experiment including resistors, circuits and revisions.
Date:
December 1966
Creator:
Cunningham, S.
System:
The Portal to Texas History
Schematic: Pre-Amplifier
Technical drawing of active seismic experiment (ASE) of pre-amplifier schematic including revisions and a short note
Date:
December 1966
Creator:
Meb
System:
The Portal to Texas History
Assembly - Long Period Preamplifier
Technical drawing showing the layout of assembly - long period preamplifier including labeled scale drawings, revisions and explanatory notes. Scale 1:0.25 inches.
Date:
December 1966
Creator:
unknown
System:
The Portal to Texas History
Assembly - Short Period Sensor Calibration
Technical drawing showing the layout of assembly - short period sensor calibration including labeled scale drawings, revisions and explanatory notes. Scale 1:0.25 inches.
Date:
December 9, 1966
Creator:
unknown
System:
The Portal to Texas History
Schematic: Detector Package (Dust Detector)
schematic diagram showing the layout of detector package (dust detector) including labeled scale drawings, revisions and explanatory notes.
Date:
December 1966
Creator:
Hoffina, R.
System:
The Portal to Texas History