Serial/Series Title
Decade
Year
1 Matching Results
Results open in a new window/tab.
Results:
1 - 1 of
1
Two-Mile Accelerator Project: Quarterly Status Report, 1 April to 30 June 1964
Introduction: Contract AT(04-3)-400 provides for the construction of the Stanford Linear Accelerator Center (SLAC), a laboratory that will have as its chief instrument a two-mile-long linear electron accelerator.
Date:
October 1964
Creator:
unknown
System:
The UNT Digital Library