In-Core Instrumentation Development Program Quarterly Progress Report September - December 1963 (open access)

In-Core Instrumentation Development Program Quarterly Progress Report September - December 1963

Introduction: The objective of Project Agreement 22 is to determine the feasibility of using in-core ion chambers to cover the complete reactor neutron flux startup range from 10(4) -5 - 10(13) nv using in-core ion chambers. The counting mode of operation will be used at low neutron flux levels and the RMS voltage fluctuation mode (Campbell Theorem) will be used at high neutron flux levels. The June-September Progress Report (GEAP-4386) shows how the RMS voltage mode can be used, discusses counting problems with long cable and ways of maximizing signal levels. This report discusses primarily the effect of gamma on counting with in-core ion chambers and the range of neutron flux measurable in the RMS voltage mode. Readers are referred to GEAP-4386 for a summary of all previous progress to attain the objective of PA-22.
Date: January 1964
Creator: DuBridge, R. A.
System: The UNT Digital Library
Fuel Cycle Program Progress Report: Fourteenth Quarter, October-December 1963 (open access)

Fuel Cycle Program Progress Report: Fourteenth Quarter, October-December 1963

Quarterly progress report discussing activities related to the Vallecitos Boiling Water Reactor (VBWR) and related facilities.
Date: January 15, 1964
Creator: Howard, C. L.
System: The UNT Digital Library
High Power Density Development Project: Fifteenth Quarterly Progress Report, October-December 1963 (open access)

High Power Density Development Project: Fifteenth Quarterly Progress Report, October-December 1963

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. Five tasks are in progress: (1) Task 1A-High Power Density Fuel Development. All fuel irradiation has been terminated with the final shutdown of the VBWR. The high burnup average achieved by a single assembly in the group is 10,000 MWD/T (assembly 1F). Twenty-one of the original 24 assemblies have failed or are suspected of failure. Profilometer tests rung on HPD assembly 2E, Rod B, indicate that localized clad deformation occurs during operation. (2) Task 1B-Fuel Fabrication Development. Assembly. All fuel irradiation has been terminated with the final shutdown of the VBWR. The highest average burnup achieved by a single assembly in the group was assembly 4S with 8400 MWD/T. All assemblies in the group have failed or are suspected of failure. The Phase I developmental fuel continues to be irradiated in the Big rock Point reactor with the lead assembly having reached 1500 MWD/T. Fifteen phase II developmental assemblies are being construction for insertion at Big Rock Point in March. Engineering is underway to provide one instrumented assembly probe and two spare flowmeters for …
Date: January 1, 1964
Creator: Holladay, R. L.
System: The UNT Digital Library