Project CGC-830 Plant Modifications for Reprocessing Non-Production Reactor Fuels Design Criteria for Metal Solution Storage
Facilities shall be provided in the 221-U Building for storing the metal solution product of the dissolution step in existing tankage from U, T, and B Plants until a reprocessing campaign is scheduled through Redox. This section shall provide a sampling tank for fuel accountability sampling and a pump tank from which the solution will be pumped via a cross-country pipeline to Redox for further processing.
Date:
April 26, 1960
Creator:
Duda, R. F.; Graf, W. A. & Kligfield, G.