Serial/Series Title
States
2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Pathfinder Atomic Power Plant Technical Progress Report: July 1, 1959-September 30, 1959
Foreword: This is the eighth of a series of reports covering technical progress on the research and development program being performed in connection with the design of the Pathfinder Atomic Power Plant.
Date:
February 1960
Creator:
unknown
System:
The UNT Digital Library
USAEC Airborne Radiometric Reconnaissance in South Dakota and Wyoming, 1952 to 1955
From introduction: This is one of a series of three reports on airborne radioactivity surveys in the United States. The reports contain the 185 airborne anomaly maps issued by the U. S. Atomic Energy Commission as a result of the AEC's aerial surveying program conducted from March 1952 to June 1956; two ground reconnaissance maps of Utah also are included. Most of the reconnaissance was done in the western United States.
Date:
August 1966
Creator:
U.S. Atomic Energy Commission. Grand Junction Office.
System:
The UNT Digital Library