Access
Partner
Oklahoma Historical Society
9,015
UNT Libraries Government Documents Department
5,755
UNT Libraries Special Collections
4,645
Rosenberg Library
932
UNT Libraries
640
Hardin-Simmons University Library
402
Sterling Municipal Library
298
Brownwood Public Library
265
Cuero Public Library
256
Dallas Municipal Archives
233
190 More
Collection
Texas Digital Newspaper Program
6,252
Oklahoma Publishing Company Photography Collection
5,869
Office of Scientific & Technical Information Technical Reports
5,211
KXAS-NBC 5 News Collection
3,999
Tocker Foundation Grant
3,132
Oklahoma Digital Newspaper Program
3,093
Harris and Eliza Kempner
933
Abilene Library Consortium
710
The Oklahoma City Times
692
University Photography Collection
513
308 More
Serial/Series Title
NBC News Scripts
3,448
Personal Papers (MS 80-0002)
926
The Oklahoma City Times
692
Brownwood Bulletin
265
Sapulpa Daily Herald
264
The Baytown Sun
258
The Cuero Record
256
The Chickasha Daily Express
214
Brenham Banner-Press
195
One O’Clock Lab Band Mexico Tour, January 26-February 21, 1967
167
504 More
Degree Department
Degree Discipline
Degree Level
Country
States
Decade
Year
Month
28,507 Matching Results
Results open in a new window/tab.
Results:
1 - 24 of
28,507
next
T = 0 and T = 1 Pairing in Light Nuclei.
None
Date:
January 1, 1969
Creator:
Goodman, A. L.
Object Type:
Thesis or Dissertation
System:
The UNT Digital Library
5 and 5 hot cell configuration for E-MAD facility. Phase 2
None
Date:
January 17, 1963
Creator:
Svasek, A. J.
Object Type:
Report
System:
The UNT Digital Library
30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System
Final design for the 30 megawatt intermediate heat exchanger and steam generator.
Date:
January 31, 1962
Creator:
Alco Products (Firm)
Object Type:
Report
System:
The UNT Digital Library
31 Men With Vision
The booklet contains a brief history of Denton County National Bank's conception and first seventy-five years of operation, including photographs of the thirty-one men who petitioned the Treasury Department in Washington, D.C. for the right to form a national bank in 1892.
Date:
1967-01~
Creator:
Drenner, William E.
Object Type:
Pamphlet
System:
The Portal to Texas History
75,000 KILOWATTS OF ELECTRICITY BY NUCLEAR FISSION AT THE HALLAM NUCLEAR POWER FACILITY
For presentation at ASCE Convention in Reno, Nevada on Thursday, June 23, 1860. A description of the Hallam Nuclear Power Facslity is presented. The history of the project, program participants, site description, component development program, reaetor building, reactor structure, reactor core, sodium systems, instrumentation and control, fuel and component handling, auxsilary sustems, special design features, and advantages of sodium graphite reactor systems are discussed. (M.C.G.)
Date:
January 1, 1960
Creator:
Gronemeyer, F.C. & Merryman, J.W.
Object Type:
Report
System:
The UNT Digital Library
80" Bubble Chamber Expansion System Preliminary Operating Procedures
These procedures are intended to be used for the initial operation of the expansion system and serve as a basis for a more complete and revised form to be written once operating experience has been gained. An attempt has been made to offer a logical and systematic presentation to facilitate operation and maintenance of the system by the operating personnel. Thus, the sequence of valve actuations has been presented in matrix and check list form to minimize errors; this also has the advantage of making it easier to adapt certain expansion system procedures to programmed control by a process control computer.
Date:
January 7, 1964
Creator:
Goodzeit, C. L.
Object Type:
Report
System:
The UNT Digital Library
80" Bubble Chamber Expansion System Summary of Piston Motion Studies
Prior to assembly into the 80" bubble chamber, the expansion system was subjected to a series of tests to check piston dynamics and gain information on the reliability of the various components. Furthermore, the rest provided operating personnel with the opportunity to become familiar with the operation and maintenance of the expansion system. Two separate tests were performed with the apparatus that was located at the north end of the AGS experimental area; one during the week of Oct. 15 and the other during the week of Nov. 12. The system was run with helium gas supplied from AGS compressor room and the piston was operated at room temperature.
Date:
January 7, 1964
Creator:
Goodzeit, C. L.
Object Type:
Report
System:
The UNT Digital Library
80" Chamber - Low Energy Beams
One of the major, as well as first, decisions which must be taken on a large chamber is to decide on the direction of the magnetic field, i.e., vertical or horizontal. Either alternative has advantages and disadvantages ad it is the intention of this note to discuss these features.
Date:
January 3, 1964
Creator:
Rau, R. R.
Object Type:
Report
System:
The UNT Digital Library
A 90$sup 0$ $sup 3$He NEUTRON SPECTROMETER.
None
Date:
January 1, 1967
Creator:
Brown, W.K.; Ellis, A.N. & Peterson, D.D.
Object Type:
Report
System:
The UNT Digital Library
100-K Area Downcomer Test Data Project CGI-883
105-KE downcomer pressure data are tabulated.
Date:
January 10, 1961
Creator:
Hutton, P. H.
Object Type:
Report
System:
The UNT Digital Library
190-H drawdown test
A discrepancy of about 1000 gpm has existed between the full-flow recorded 190, 105 and ROL flows. While past operating practices have not used the 190 or ROL flow rates for official purposes, the disquieting, though not theoretically unexplicable, differences require some quantitative resolution. On November 24, 1962, a drawdown test of the 190-H storage tanks was performed to establish the accuracy of the various flowmeters. The drawdown test of the 190 storage tanks was run at the beginning of a scheduled reactor shutdown. With the full reactor flow supplied by the electric process pumps feeding from the storage tanks, the 183-H supply to the storage tanks was valved off. Additionally, non-process water usually taken from the storage tanks was valved off. The storage tank water levels were taken, then recorded as a function of time.
Date:
January 17, 1963
Creator:
Cremer, B. R. & Bokish, K. P.
Object Type:
Report
System:
The UNT Digital Library
244-AR Vault Information Manual.
None
Date:
January 1, 1968
Creator:
Francis, C. J.
Object Type:
Report
System:
The UNT Digital Library
250-Watt(e) Isotope-Fueled Thermionic Generator Study. Final Report.
None
Date:
January 1, 1963
Creator:
Kortier, W. E. & Lyon, W. C.
Object Type:
Report
System:
The UNT Digital Library
250-Watt Radioisotope Thermoelectric Generator Feasibility Study. Volume 3. RTG Handling System Analysis and Design. Final Report.
None
Date:
January 1, 1966
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
278: 209 Rocket Pod Drop Test at Fort Hood
Footage of an AH-1 Cobra jettisoning its rocket pods during testing at Fort Hood. No sound.
Date:
January 20, 1967
Creator:
Bell Helicopter Textron
Object Type:
Video
System:
The UNT Digital Library
278: 209 Rocket Pod Drop Test at Fort Hood, Black and White
Black and white footage of an AH-1 Cobra jettisoning its rocket pods during testing at Fort Hood. No sound.
Date:
January 20, 1967
Creator:
Bell Helicopter Textron
Object Type:
Video
System:
The UNT Digital Library
The 550$sup 0$F Notched High-Strain Behavior of Three Low-Strength Structural Steels.
None
Date:
January 1, 1969
Creator:
Krempl, E.E.
Object Type:
Report
System:
The UNT Digital Library
710 high-temperature gas reactor program summary report. Volume I. Summary
Declassified 6 Sep 1973. A description of the 710 Reactor concept and its significant design features is presented. A summary of the history of the 710 Program and a summary of the major technical achievements of the program are included. (13 references) (auth)
Date:
January 1, 1967
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
710 high-temperature gas reactor program summary report. Volume IV. Critical experiment and reactor physics development
Reactor physical technology development was performed and its design was explained.
Date:
January 1, 1968
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
710 reactor program, progress report No. 12
Declassified 4 Sep 1973. Information on the development of the 710 Reactor is presented concerning the performance testing of refractory-metal fuel elements, critical experiment mockup of 710 Reactor, reactor component design and development, and test facilities and pilot loop design. (DCC)
Date:
January 28, 1965
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
1000-Mw(e) METAL-FUELED FAST BREEDER REACTOR.
None
Date:
January 1, 1966
Creator:
Link, L. E.; Ayer, J. E.; Butler, D. K.; Hub, K. A.; Loewenstein, W. B.; Mecham, W. J. et al.
Object Type:
Report
System:
The UNT Digital Library
1000 Mwe LIQUID METAL FAST BREEDER REACTOR FOLLOW-ON STUDY: REPORT OF TASKS II AND III. A REFERENCE CONCEPTUAL DESIGN OF A 1000 Mwe LMFBR. VOLUME III. SAFETY AND CONTROL ANALYSES.
None
Date:
January 1, 1968
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
1000 Mwe LIQUID METAL FAST BREEDER REACTOR FOLLOW-ON STUDY: TASK IV REPORT. A RESEARCH AND DEVELOPMENT PROGRAM NEEDED FOR THE C-E REFERENCE CONCEPT.
None
Date:
January 1, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
1000-MWe LMFBR ACCIDENT ANALYSIS AND SAFETY SYSTEM DESIGN STUDY. PHASE I. FAULT TREES AND MALFUNCTION CATALOG.
None
Date:
January 1, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library