Quality Assurance Tests: Release 1 Summary Test Results, June 2009 (open access)

Quality Assurance Tests: Release 1 Summary Test Results, June 2009

This report contains summaries of the results of two tests given as part of the IOGENE project. The IOGENE project involves genealogists in the design process of the redesigned Portal interface. The first test in this report was conducted from April 6 through April 9, 2009. The second test in this report was conducted from June 1 - June 4, 2009.
Date: June 2009
Creator: Murray, Kathleen R.
System: The UNT Digital Library
Optimizing the User Experience in a Rapid Development Framework: Portal to Texas History: Baseline Survey Results, June 2009 (open access)

Optimizing the User Experience in a Rapid Development Framework: Portal to Texas History: Baseline Survey Results, June 2009

This report discusses the questionnaire for the IOGENE Project. From September 26, 2008 through June 26, 2009, an online survey questionnaire captured both demographic data from Portal visitors as well as their opinions regarding the utility of the Portal and their satisfaction with it. The objective of this data collection effort was twofold: to characterize Portal users and to establish baseline measurements for user satisfaction. The survey will be repeated following each of two planned releases of the redesigned Portal, one in the summer of 2009 and the second in the fall of 2009. Comparison of future survey results to the baseline results reported in this paper will be one gauge of the success of the IOGENE project.
Date: June 29, 2009
Creator: Murray, Kathleen R.
System: The UNT Digital Library
Optimizing the User Experience in a Rapid Development Framework: Interim Performance Report, July 2009 (open access)

Optimizing the User Experience in a Rapid Development Framework: Interim Performance Report, July 2009

This report is the third interim performance report for the project titled: Optimizing the User Experience in a Rapid Development Framework. The reporting period is January 1, 2009 through June 30, 2009. The report includes three sections: Goals and Accomplishments, Significant Findings and Accomplishments, and Project Achievements and Lessons Learned.
Date: June 2009
Creator: Hartman, Cathy Nelson