Hazards Report for SM-1 Core II With the SM-1 Core II High Burnup Elements Replaced with SM-1 Core I Spare Elements (open access)

Hazards Report for SM-1 Core II With the SM-1 Core II High Burnup Elements Replaced with SM-1 Core I Spare Elements

Abstract: The removal of both SM-1 Core I high burnup elements from the SM-1 Core II and the insertion of two SM-1 Core I spare elements i their places are discussed. Nuclear and thermal characteristics of Core II with the change are presented and conclusion related to the change in hazard potential are made. If the core change indicated by this report is made, local peaking factors will be decreased and burnout ratios will be increased. This, of course, in itself leads to a more conservative estimate of core safety. There is no conceivable reason why this perturbation may not be safely made in the SM-1 Core II.
Date: October 9, 1961
Creator: Coombe, J. R.; Lee, D. H. & Matthews, F. T.
System: The UNT Digital Library
Hazards Report for SM-1 Core II Without the SM-1 Core I High Burnup Elements and With the PM-1-M-2 Element (open access)

Hazards Report for SM-1 Core II Without the SM-1 Core I High Burnup Elements and With the PM-1-M-2 Element

Abstract: The removal of both SM-1 Core I high burnup elements from SM-1 Core II and the insertion of the PM-1-M-2 element and the SM-1 Core I spare element in SM-1 Core II is discussed. Nuclear and thermal characteristics of Core II with these changes are presented and conclusions related to the changes in the hazard potential are made. If the core change indicated by this report is made, local peaking factors will be decreased and burnout ratios will be increased. This, of course, in itself leads to a more conservative estimate of core safety. There is no conceivable reason why the perturbation may not be safely made in the SM-1 Core II.
Date: October 7, 1961
Creator: Coombe, J. R.; Lee, D. H. & Mathews, F. T.
System: The UNT Digital Library
Design Criteria for Irradiated Vessels Task 6.0 Summary Report (open access)

Design Criteria for Irradiated Vessels Task 6.0 Summary Report

Abstract: This technical report presents design criteria to prevent the brittle fracture of ferritic reactor vessels that cold occur as a result of the rise in NDT caused by fast neutron irradiation. The criteria require that maximum principal stress in the vessel does not exceed 18 percent of yield stress at temperatures below NDT + 60 degree F. Under certain conditions the allowable stress may be based on the irradiated yield stress. A discussion of brittle fracture and an explanation of the criteria are included.
Date: September 29, 1961
Creator: McLaughlin, D. W.
System: The UNT Digital Library
Hazards Evaluation of the SM-1 Penetrated Gasket (open access)

Hazards Evaluation of the SM-1 Penetrated Gasket

Abstract: This technical report describes the as-constructed SM-1 penetrated gasket designed for SM-1 Core and Flow Instrumentation (Task XIV). This report supplements APAE No. 79, The Summary Hazards Report for Task XIV, and evaluates the effects of a postulated failure of this gasket. The effects of failure on the Maximum Credible Accident are determined and conclusions and recommendations for the use of this gasket are made.
Date: September 8, 1961
Creator: Coombe, J. R.; Gebhardt, F. G. & James, B.
System: The UNT Digital Library
Steady State and Transient Thermal and Hydraulic Analysis of SM-2 Termination Report (open access)

Steady State and Transient Thermal and Hydraulic Analysis of SM-2 Termination Report

Abstract: Thermal characteristics of the SM-2 core were analyzed at steady state and loss of flow conditions. For steady state operation, the steady state code STDY-3 was used. For transients during a loss of flow accident, ART-02, a one-dimensional code, was used. This analysis indicates the SM-2 core is safe from burnout under steady state operation at design power level (28 tMW) because (1) no nucleate boiling exists, and (2) the minimum burnout ratio is above 2.0. The core is safe from burnout under loss of flow transient because the minimum burnout ratio in the hottest element channel of 1. 82 is above the minimum design criteria of 1. 5.
Date: September 8, 1961
Creator: Segalman, I. & Bradley, P. L.
System: The UNT Digital Library
Hazards Report for Insertion of the PM-1-M-2 Element in the SM-1 Core II (open access)

Hazards Report for Insertion of the PM-1-M-2 Element in the SM-1 Core II

Abstract: This technical report describes the Martin Co. PM-1-M-2 test element and analyzes the potential hazard incurred by its inclusion in the SM-1 Core II. A nuclear analysis develops power distributions and reactivity effects. Hydraulic and thermal analyses develop anticipated burnout heat flux ratios. An evaluation of the risk involved with the inclusion of this element is presented. In view of the narrow margin by which the PM-1-M-2 test element meets the minimum burnout ratios as defined by Alco Products, Inc., it is recommended that if time permits that critical facility design verification be accomplished. The PM-1-M-2 test element meets the minimum requirements for insertion in SM-1 Core II and in view of the importance of this element to the PM-1 and PM-3A program, should be considered for insertion.
Date: September 1, 1961
Creator: Coombe, J. R.; Scoles, J. F.; Brondel, J. O. & Lee, D. H.
System: The UNT Digital Library
SM-2 Full Scale Flow Studies Termination Report (open access)

SM-2 Full Scale Flow Studies Termination Report

Abstract: Hydrodynamic flow studies were conducted on a full scale model of the SM-2 reactor vessel and core. Test fluid was water at 200 psi and 200 degree F. Test facilities, model, and instrumentation design are discussed. Flow distribution in the stationary fuel elements, lattices, and control rods of the second pass was investigated. Pressure losses through the various core components were measured and are compared with calculated values. Observed over-all pressure drop was 71 feet of water at 200 degree F, 31% higher than predicted, part of which was due to presence of instrument leads. Element to element flow distribution varied approximately +-8% from pass average. Channel-to-channel stationary element flow distribution varied approximately +-10% from element average and control rod flow distribution varied from +-8.9% to +-6.4 and -11.6% depending upon rod locations. These variations exceed the original goals of a +-10% and +-12% combined deviation for stationary and control rod elements respectively, but are satisfactory in relation to thermal design. There was no indication of unsatisfactory structural performance of any components under hydrodynamic loadings up to 130% of design values. The test program was terminated after determining flow distribution in the reference core design, omitting any work on …
Date: July 30, 1961
Creator: Christenson, J. A.; Richards, W. M. S. & Davidson, S. L.
System: The UNT Digital Library
Extended SM-2 Critical Experiments : CE-2 (open access)

Extended SM-2 Critical Experiments : CE-2

Abstract: This technical report contains a description and results of a second series of critical experiments performed on the SM-2 core mock-up, as additional to the first series of experiments reported in APAE No. 54. The SM-2 core mock-up contains 36.4 kg U-235 and and estimated 67.9 gm B-10. The equivalent diameter and the active height are about 22 in.; the metal-to-water volume ration is 0.344. Data is presented on activation, reactivity, and stuck rod measurements. All measurements were conducted on the open seven control rod array employing 38 stationary fuel elements. Activation measurements consisted of neutron flux measurements using uranium fission foils for relative power distribution studies, the effect of flux suppressors on reducing power peaks, blocked coolant channel measurements, and gamma ray dose distribution. Reactivity measurements were performed to determine the effect f flow divider, flux suppressors and stimulated high temperature and pressure operation; b-10 loading in the SM-2 core; and core material coefficients. For the later, the worth in cents per gm or cents per cc was determined at simulated temperature of 510 degree F for B-10, U-235, stainless steel, and void. Stuck rod measurements were made to obtain an indication of the criticality margin in the …
Date: June 30, 1961
Creator: McCool, W. J.; Robinson, R. A.; Weiss, S. H.; Raby, T. M.; Schrader, E. W. & Walthousen, L. D.
System: The UNT Digital Library
Investigation of Local Boiling of SM-1 (open access)

Investigation of Local Boiling of SM-1

Abstract; SM-1 Reactor Core I Rearranged and Spiked, and Core II with Special Components were analyzed under various off-design conditions to induce nucleate boiling. The steady state code, STDY-3, written for the thermal analysis of pressurized water cores, was employed for the analysis. The code performs a complete steady state parallel channel thermal analysis for both nominal and hot channels. Thermal characteristics of individual elements were investigated while changing the parameters of primary pressure or inlet temperature to introduce the phenomenon of nucleate boiling in the the core. Reduction of system pressures to 1000, 800, and 600 psia and increasing core inlet temperatures to 465 and 500 degree F were studied as the means to induce boiling in the core. This analysis indicates that SM-1 Core I Rearranged and Spiked can be safely operated at the reduced pressure of 910 psia without introducing extensive boiling in the core. SM-1 Core II with Special Components can be operated at 800 psia or at an inlet temperature of 500 degree F at 1200 psia.
Date: June 20, 1961
Creator: Bradley, P. L.
System: The UNT Digital Library
Mid-Year Summary Report October 1, 1960-March 31, 1961 Army Pwr Support and Development Program (open access)

Mid-Year Summary Report October 1, 1960-March 31, 1961 Army Pwr Support and Development Program

Abstract: A cyclic stress analysis of the SM-1 primary system was carried out. Problems encountered in the fabrication of PM-2A Core II and SM-lA Core II are described, and the results of an examination of damaged SM-lA Core I stationary fuel elements reported. A preliminary study of the radiation damage to SM-1 reactor vessel was made and the possibility of annealing the vessel discussed. Performance analyses are presented for five cores: SM-1 Core, SM-1 Core 1 rearranged and spiked, SM-1 Core II with special components, PM-2A Core 1, and SM- 1A Core 1. Preliminary critical experiments were made with SM-2 elements in a SM- 1 core configuration and nuclear and thermal analyses of the use of SM-2 elements in SM-1, SM-1A, and PM-2A completed. A throttling steam calorimeter was selected for measuring moisture carry-over on the PM-2A steam generator. Test procedures for evaluating the shielding of the SM-1, SM-lA, and PM-2A plants are summarized. Radiochemical and chemical analyses of SM-1 coolant and crud are summarized, and methods of activity control discussed. Preliminary results of studies of the properties of reactor pressure vessels under irradiation and no irradiation conditions are summarized briefly.
Date: June 2, 1961
Creator: Hoover, H. L.
System: The UNT Digital Library
Hazards Report for the SM-1 Core II Without Special Components (open access)

Hazards Report for the SM-1 Core II Without Special Components

Abstract: This technical report describes the changes incurred in the SM-1 by the insertion of the SM-1 Core II without special components. The SM-1 Core II components were made to specifications very nearly identical to those of SM-1 Core I. The differences consist of europium absorber sections, internal europium flux suppressors in the control rod fuel elements, and low impurity cladding. Each of the SM-1 Core II components with the exception of the five absorber sections new in SM-1 Core I were subjected to a Zero Power Experiment at the Alco Critical Facility. The results of this experiment indicate that the SM-1 Core II will have nuclear characteristics very similar to that of the SM-1 Core I. Since SM-1 Core II will be operated with the same mode of rod control, in the same core support structure, and with the same primary coolant flow conditions, the thermal characteristics should be essentially identical to that of SM-1 Core I. Also, all kinetic characteristics of SM-1 Core II should be identical to those of SM-1 Core I. This report demonstrates that there is no increase in potential for a hazardous situation at SM-1 due to the replacement of SM-1 Core I by …
Date: April 19, 1961
Creator: Gallagher, J. G.
System: The UNT Digital Library
Hazards Report for the SM-1 Core II With Special Components (open access)

Hazards Report for the SM-1 Core II With Special Components

Abstract: This technical report describes the changes incurred in the SM-1 by the insertion of the SM-1 Core II and special components. The special components consist of impact specimens, a boron gradient rod, SM-2 elements, a PM-1-M element, and high burnup SM-1 Core I elements. The change in hazards, due to operation of SM-1 with Core II and the special components is evaluated. The analysis indicates there is no change in hazards.
Date: March 30, 1961
Creator: Coombe, J.; Lee, D.; Segalman, I. & Robertson, R.
System: The UNT Digital Library
Hazards Summary Report for the SM-1 Core Temperature and Flow Instrumentation: Task XIV (open access)

Hazards Summary Report for the SM-1 Core Temperature and Flow Instrumentation: Task XIV

Abstract; This technical report describes the changes in the SM-1 incurred by the experiment, Core Temperature and Flow Instrumentation (Task XIV), and evaluates the possible hazard involved in these changes. Temperature and flow measurements will be taken on a Task XIV instrumented stationary fuel element, instrumented control rod fuel element and other selected points in the SM-1 core to provide data on the core steady state and transient performance. The hazards evaluation consists of a nuclear evaluation, thermal and hydraulic analysis, description of tests to be performed, and discussion of containment integrity and maximum accident considerations.
Date: March 30, 1961
Creator: Coombe, J. R.; Brondel, J. O.; Lee, D. H. & Matthews, F. T.
System: The UNT Digital Library
Suitability of Inconel for Corrosion Protection on Water Side of Sodium Component Steam Generator (open access)

Suitability of Inconel for Corrosion Protection on Water Side of Sodium Component Steam Generator

Abstract; The heat exchanger and steam generator for the U.S. Atomic Energy Commission Sodium Components Project will be constructed entirely of type 316 stainless steel. Because of the susceptibility of this alloy to stress corrosion cracking, it is proposed to clad all areas of the steam generator with Inconel where the stainless steel will be exposed to water and steam. This report includes a discussion of the work by numerous investigators that justify the selection of Inconel for this service. A discussion of Inconel type welding alloys is also included.
Date: March 1, 1961
Creator: Phillips, Laurence E. & Vawter, Frank J.
System: The UNT Digital Library
Fission Product Activity in SM-1 Core I Primary System and Surface Contamination on SM-1 Type Fuel Elements. Task XVIII, Phases 2 and 3 (open access)

Fission Product Activity in SM-1 Core I Primary System and Surface Contamination on SM-1 Type Fuel Elements. Task XVIII, Phases 2 and 3

Abstract; The fission product data obtained during SM-1 Core I operation (June 1957 - May 1960) is reviewed briefly and interpreted. Evidence is presented to indicate that a fuel element defect was responsible for the high fission product activity level observed in the primary coolant. Relative escape coefficients are calculated and the defect size estimated. Anticipated fission product levels during SM-1 Core II and SM-1A Core I operation are estimated from alpha surface contamination data on completed fuel elements. The importance of in-line sampling for monitoring fission product activity is stressed as well as the need for failed fuel element detection methods.
Date: February 28, 1961
Creator: Hasse, Robert A. & Zegger, John L.
System: The UNT Digital Library
Evaluation of Kanigen, Electroless Nickel Plating for Steam Side of a Sodium Component Steam Generator (open access)

Evaluation of Kanigen, Electroless Nickel Plating for Steam Side of a Sodium Component Steam Generator

Introduction: This is a final report on the evaluation of Kanigen electroless nickel plating for surfaces in contact with water and steam i a sodium heated AISI Type 316 stainless steel steam generator. The purpose of the coasting was to afford protection from stress corrosion cracking originating on the water-steam side of the unit. It has been concluded that the kanigen coating does not afford adequate protection for the services condition intended. This work was performed as part of the research and development program for the United States Atomic Energy Commission sodium Components Design Project.
Date: February 15, 1961
Creator: Alco Products (Firm).
System: The UNT Digital Library
Experiments and Analysis for SM-1 Core II With Special Components (open access)

Experiments and Analysis for SM-1 Core II With Special Components

Abstract: This technical report contains a summary of analytical and experimental work performed on SM-1 Core II, with special components is presented. The effects of these special assemblies upon power distribution and core reactivity were calculated and compared to experimental measurements. A thermal analysis was conducted to determine steady state and transient performance of the special test components of the core as well as some of the hotter standard Core II components. Experimental work discussed includes individual reactivity effects of all the special elements and the total effect of all of the elements. Power mappings were also made and are reported.
Date: January 1, 1961
Creator: Lee, D. H.; Robinson, R. A. & Segalman, I.
System: The UNT Digital Library
SM-1 Research and Development Program: Long-lived Induced Activity Buildup During SM-1 Core I Lifetime. Task XVIII, Phase I (open access)

SM-1 Research and Development Program: Long-lived Induced Activity Buildup During SM-1 Core I Lifetime. Task XVIII, Phase I

Abstract: The results of activity buildup studies in the SM-1 performed during Core I lifetime (June 3, 1957 to April 28, 1960) are reported. Data are presented on the extent, nature, and mechanism of the buildup of long-lived gamma emitting nuclides in the reactor primary system. Radiation levels after reactor shutdown are presented, as well as mathematical equations used to account for the observed activity levels. The data have shown that Co60 is the major contributor to radiation levels in the SM-1. Co60 activity arises from the cobalt in Haynes 25 alloy flux suppressors, and the cobalt impurity in stainless steel. After 35 months operation at an average power level of 55%, deposited Co60 activity accounted for approximately 83% of the total radiation level (mr/hr) contributed by the long-lived gamma emitting nuclides. The contribution of the primary coolant activity to the total radiation level is insignificant when compared to the contribution of the activity deposited on the walls of the system. The radiation level on the super-heater side of the steam generator was about 1400 mr/hr after 35 months of reactor operation. The percentages of Co60 activity in the coolant and in the deposits were not the same. This indicates …
Date: November 30, 1960
Creator: Bergmann, C. A.; Bergen, C.; Cox, J. F.; Chupak, J. & Grant, L. G.
System: The UNT Digital Library
SM-1 Research and Development. Task XV, Zero Power Experiments for SM-1 Core II and SM-1A Core I (open access)

SM-1 Research and Development. Task XV, Zero Power Experiments for SM-1 Core II and SM-1A Core I

Abstract: A zero power experiment on the SM-1 Core II included an element by element reactivity check of fuel elements and control rod absorber sections, and an estimate of burnable nuclear poison loading in stationary fuel elements. An approach to criticality was made by the inverse multiplication method, and critical rod bank position obtained as a function fuel loading up to full core loading. Minimum and maximum core reactivity measurements were obtained by selective loading of stationary fuel elements, and total excess K of the core was established. Power distribution measurements were taken in the regions of the core-reflector interface and the fuel-absorber interface in the control rod assemblies. The effectiveness of europium flux suppressors in the top of control rod fuel elements was determined, and power peaking was measured in stationary elements adjacent to control rod assembly water gaps. Survey measurements established the work of spiking clean, cold SM-1 cores with SM-2 elements and the work of water holes in the SM-1 Core. The reduced scope zero power experiment performed on SM-1A core I included an element by element uniformity check of stationary fuel elements, a core assembly test, comparison of Eu2O3 and B4C absorber sections, and development of …
Date: October 12, 1960
Creator: Robinson, R. A.; Weiss, S. H.; McCool, W. J. & Schrader, E. W.
System: The UNT Digital Library
Analysis of Zero Power Experiments on SM-1 Core II and SM-1A Core I (open access)

Analysis of Zero Power Experiments on SM-1 Core II and SM-1A Core I

Abstract: An analysis of SM-1 Core II and SM-1A Core I zero power experiments was made by comparing these cores to each other and to AM-1 Core I on the basis of critical bank positions, bank calibrations and available chemical analyses of the fuel plate compositions. The effects of replacing boron absorbers by europium absorbers upon rod worth and stuck rod conditions were studied. Comparisons of measured and calculated power distributions were made. It was concluded that both SM-1 Core II and SM-1A Core I contain nearly identical B-10 loading of 17.79 grams, compared to the best estimate of 15.75 grams for SM-1 Core I. The available data indicates that all three cores possess similar nuclear characteristics.
Date: October 5, 1960
Creator: Paluszkiewicz, S.
System: The UNT Digital Library
Intermediate Heat Exchanger and Steam Generator Final Design. Volume 1. Thermal & Mechanical Design (open access)

Intermediate Heat Exchanger and Steam Generator Final Design. Volume 1. Thermal & Mechanical Design

This technical report represents the final design for a sodium to sodium intermediate heat exchanger and a sodium to water steam generator. The intermediate heat exchanger is designed for operation in a nuclear power plant using liquid sodium as the primary and secondary coolant. Since the primary fluid coming fro the reactor is radioactive, the purpose of the IHX is to transfer heat to a nonradioactive fluid which then goes to the steam generator. Because of radioactivity the unit will be enclosed in a concrete pit and will not be accessible during periods of operation. Immediately after shutdown it will be necessary to allow time for radioactive decay before the unit will be accessible to personnel. Because of inaccessibility and possible long periods allowed for decay time, it is imperative that the unit give trouble free operation. During periods of shutdown, the internals should have easy access for inspection and repair if necessary so that down time is held to a minimum. The steam generator is designed to generate superheated steam using liquid sodium from the intermediate heat exchanger as the heat source. Its basic design is a shell and tube unit made up of three difference sections: (1) a …
Date: September 30, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Intermediate Heat Exchanger and Steam Generator Final Design. Volume 2. Chemical & Stress Analysis (open access)

Intermediate Heat Exchanger and Steam Generator Final Design. Volume 2. Chemical & Stress Analysis

Introduction: This volume deals principally with the chemical analysis and the stress analysis for a sodium to sodium intermediate heat exchanger and a sodium to water steam generator. The work presented is an extension and modification of the analysis presented in the preliminary design report. The chemical analysis covers the sodium cover gas system and the effects of sodium-water reactions in the event of a leak in the steam generator. Considerable design work was done in an effort to maintain the integrity of the steam generator vessel under maximum leak conditions. The method of sizing relief valves for each unit under varying leak rates is presented in this text and operation of the unit for the various leak rates is resented in the Operation and Maintenance volume. The stress analysis section covers those thermal transients which would be physically possible with this intermediate heat exchanger and steam generator design. Attention has been given to methods of operation which would minimize the magnitude and frequency of thermal shocks. Certain areas have been studied in detail where thermal stresses appear high. This report also includes a structural design basis for handling stress analysis of combined mechanical, hydrostatic and thermal stresses and conditions …
Date: September 30, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Intermediate Heat Exchanger and Steam Generator Final Design. Volume 3. Specifications (open access)

Intermediate Heat Exchanger and Steam Generator Final Design. Volume 3. Specifications

Introduction: Sodium Components Material Specifications. Twenty-three material, inspection and welding specification are presented for the various parts of both the intermediate heat exchanger and steam generator. Tables indicate the applicable parts and assemblies to which these specifications shall apply. For other parts, where the material requirements are not severe, the ASTM or other indicated specifications shall apply.
Date: September 30, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Intermediate Heat Exchanger and Steam Generator Final Design. Volume 4. Operation & Maintenance (open access)

Intermediate Heat Exchanger and Steam Generator Final Design. Volume 4. Operation & Maintenance

This technical report contains the operation and maintenance specifications for the intermediate heat exchanger and the steam generator. The report contains eight sections: (1) General Information, (2) Shipping and Installation, (3) Operation Procedures, (4) Scram and Casualty Shutdowns, (5) Leaks, (6) Instrumentation and Control, (7) Maintenance, and (8) four Appendixes (a) Boiler Water Chemistry Recommendations, (b) Final Concept Drawings, (c) Industrial Nucleonics Literature on Liquid Level Detector, and (d) Sodium Purity Control Recommendations.
Date: September 30, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library