Army PWR Support and Development Program Six Months Summary Report : October 1, 1961 - March 31, 1962 (open access)

Army PWR Support and Development Program Six Months Summary Report : October 1, 1961 - March 31, 1962

Abstract: Progress is reported on research and development tasks under the Program Plan for Engineering Support and Development of Army Pressurized Water Reactor Power Plants, Contract AT(30-1)-2639, during the six months' period October 1, 1061 to March 31, 1962.
Date: May 25, 1962
Creator: Dixon, M. H.
System: The UNT Digital Library
Interim Report of Nuclear Analysis Performed on SM-2 Core and Vessel : September 1, 1958 to December 31, 1959. (open access)

Interim Report of Nuclear Analysis Performed on SM-2 Core and Vessel : September 1, 1958 to December 31, 1959.

Abstract: This technical report contains a description of the nuclear analysis performed upon the SM-2 core and vessel for the period September 1, 1958 to December 31, 1959. Calculations are given for core reactivity, power distributions, lifetime, reactor control, kinetics, radiation problems, fuel and poison burn-ups, and the nuclear effects of poisons, temperature, and geometry. Wherever possible, experimental data is included in order to test the validity of the analytical models. The SM-2 nuclear analysis was performed by Alco Products, in. under Tasks 1, 8, and 10 of Contract No. AT(30-2)-326 for the Atomic Energy Commission.
Date: May 27, 1960
Creator: Bobe, P. E.; Birken, S. H.; Byrne, B. J.; Clancy, E. F. & Fried, B. E.
System: The UNT Digital Library
Hazards Summary Report for the Army Package Power Reactor : SM-1, Task XVII (open access)

Hazards Summary Report for the Army Package Power Reactor : SM-1, Task XVII

Preface. This technical report is an updated and revised version of the original SM-1 (APPR-1) Hazards Summary Report. The original report was issued July 1955, almost two years before construction of the SM-1 plant was completed. During that time interval there were numerous design changes. Consequently, the original report does not accurately describe the plant as built. This revision is written after the SM-1 has been operated 3 years. It describes the as-build plant and includes plant modifications and experience obtained during the first 3 years of SM-1 operation.
Date: May 1960
Creator: Rosen, S. S.
System: The UNT Digital Library
Scale "Up or Down" Analysis for Prototype Test (open access)

Scale "Up or Down" Analysis for Prototype Test

Introduction: In conjunction with the final design and development of a 70 MW sodium intermediate heat exchanger and a sodium steam generator, an analysis is required which can be used as a basis for a determination to scale up or scale down the designs. Included in this analysis are those considerations leading to the recommendation of the best prototype test unit and to some of the limits imposed on scaling up or down when considering future applications of designs other than those actually tested. In addition, these considerations include aspects required to accurately predict the performance, operation, mechanical reliability, and feasibility of fabrication of the 70 MW design.
Date: May 1, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library