Army Reactors Program Annual Progress Report: 1962 (open access)

Army Reactors Program Annual Progress Report: 1962

Report summarizing ongoing nuclear work performed by the ORNL for the United States Army.
Date: April 10, 1963
Creator: Oak Ridge National Laboratory
System: The UNT Digital Library
Corrosion of thorium and uranium during long-term storage (open access)

Corrosion of thorium and uranium during long-term storage

From introduction: "The over-all objective of the present study was to determine the nature and extent of the present study was to determine the nature and extent of the corrosion of these materials under a variety of such storage conditions and to determine the ability of several potential protective coatings to retard this corrosion."
Date: April 10, 1962
Creator: Stephan, Elmer F.; Miller, P. D. & Fink, Frederick W.
System: The UNT Digital Library
Effect of Exposure Site on Weather Resistance of Porcelain Enamels Exposed for Three Years (open access)

Effect of Exposure Site on Weather Resistance of Porcelain Enamels Exposed for Three Years

From Introduction: "The present report describes the condition of all of the porcelain enamels after exposure for 3 yr."
Date: April 10, 1962
Creator: Moore, Dwight G. & Potter, Alan
System: The UNT Digital Library
Equations for Bilateral Heat Transfer to Fluids Flowing in Concentric Annuli (open access)

Equations for Bilateral Heat Transfer to Fluids Flowing in Concentric Annuli

Abstract: "Theoretical equations have been derived for calculating heat transfer coefficients for fluids flowing through concentric annuli for the following two cases: (A) constant and equal heat fluxes from both walls, and (B) constant, but unequal, heat fluxes from the walls, with equal wall temperatures at a given axial position along annular channel. In the derivations, the conditions of fully-established flow, and independence of physical properties with temperature variation across the flow channel, were assumed. The only geometrical parameter in this general case is the radius ratio r2/r1, and in the study it was varied from 1.0 to 10.0."
Date: April 10, 1962
Creator: Dwyer, Orrington Embry, 1912-
System: The UNT Digital Library
Critical Path Scheduling in Maintenance (open access)

Critical Path Scheduling in Maintenance

Summary: The following narrative interspersed with figures and attached reference exhibits is designed to acquaint the reader with the scheduling procedure developed at ORGDP, trial results and evaluation, subsequent improvement, further application, and use in conjunction with our IBM 7090 Computer.
Date: April 10, 1961
Creator: Gritzner, C. L.; Jones, J. P. & Ellis, J. M.
System: The UNT Digital Library