Shawnee test program: TVA Shawnee Test Facility. Technical progress report, April 6-May 6, 1981 (open access)

Shawnee test program: TVA Shawnee Test Facility. Technical progress report, April 6-May 6, 1981

The test obtective for April was to evaluate sodium thiosulfate in limestone scrubber slurry as inhibitor of sulfite oxidation. The resulting effect on saturation levels of calcium sulfate (CaSO/sub 4/.2 H/sub 2/O; gypsum) and scaling in the system was of prime importance. As an antioxidant, S/sub 2/O/sub 3//sup =/ functions as a scale inhibitor by reducing SO/sub 4//sup =/, a known scale former. To meet the test objective, the scrubber was operated in a scaling mode as a base case; finally, the changes resulting from addition of sodium thiosulfate were evaluated. Train 100 was operated at two pH levels and with low and high sulfur coal in April. Because of several delays explained below, only base cases were completed in April.
Date: November 5, 1981
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Assessment of some of the problems in the USA of superconducting magnets for fusion research (open access)

Assessment of some of the problems in the USA of superconducting magnets for fusion research

This paper discusses some of the general difficulties and problems encountered during the development of the technology of superconductors and superconducting magnets for fusion and expresses some personal concerns.
Date: November 5, 1981
Creator: Cornish, D.N.
Object Type: Article
System: The UNT Digital Library
Technical evaluation of the adequacy of station electric distribution system voltages for the R. E. Ginna Nuclear Power Station, Unit 1: selected issues program (Docket No. 50-244) (open access)

Technical evaluation of the adequacy of station electric distribution system voltages for the R. E. Ginna Nuclear Power Station, Unit 1: selected issues program (Docket No. 50-244)

This report documents the technical evaluation of the adequacy of the station electric distribution system voltages for the R.E. Ginna Nuclear Power Station, Unit 1. The evaluation is to determine if the onsite distribution system, in conjunction with the offsite power sources, has sufficient capacity to automatically start and operate all Class 1E loads within the equipment voltage ratings under certain conditions established by the Nuclear Regulatory Commission. The analysis submitted demonstrates that acceptable voltages will be supplied to the Class 1E equipment under worst case conditions.
Date: November 5, 1981
Creator: Selan, J. C.
Object Type: Report
System: The UNT Digital Library