Resource Type
Serial/Series Title
Notes of Monthly Component Test Program Review Meeting Held with SNPO at WANL
7
Fiscal Year 1966
2
Project Sulky
2
Brookhaven National Laboratory Annual Report
1
Chemical Processing Department Monthly Report
1
Proceedings of the Symposium on Nuclear Engineering
1
Project Pre-Schooner 2
1
Project Sedan
1
1,294 Matching Results
Results open in a new window/tab.
Results:
1 - 24 of
1,294
next
Chemical Processing Division monthly report, August 1966
This report, from the Chemical Processing Department at HAPO for August 1966, discusses the following: Production operation; Purex and Redox operation; Finished products operation; maintenance; Financial operations; facilities engineering; research; and employee-relations, and waste management.
Date:
December 31, 1966
Creator:
Reed, P. E.
System:
The UNT Digital Library
Chemical Processing Division monthly report, July 1966
This report, from the Chemical Processing Department at HAPO for July 1966, discusses the following: Production operation; Purex and Redox operation; Finished products operation; maintenance; Financial operations; facilities engineering; research; and employee-relations, and waste management.
Date:
December 31, 1966
Creator:
Reed, P. E.
System:
The UNT Digital Library
Unusual operation, KE Reactor, January 16--January 20, 1966
Following the startup of the KE Reactor on January 16, 1966, a severe power oscillation, which was confined primarily to the top of the reactor, was experienced. The purpose of this report is to describe the transients which occurred and relate the control measure taken to dampen the oscillation.
Date:
December 31, 1966
Creator:
Baston, G. D. & Miller, R. L.
System:
The UNT Digital Library
MOUND LABORATORY PROGRESS REPORT FOR CHEMISTRY: OCTOBER--DECEMBER 1966.
None
Date:
December 30, 1966
Creator:
unknown
System:
The UNT Digital Library
Uni-directional heat rejection RTG parametric study, Voyager Task C
None
Date:
December 30, 1966
Creator:
unknown
System:
The UNT Digital Library
Interim nuclear analyses in support of E/STS 2-3 site layout activities
None
Date:
December 22, 1966
Creator:
Whittum, H. O.; Warman, E. A.; Garrington, G. & Rogers, D. R.
System:
The UNT Digital Library
Phoebus 2 CF/2A pressure vessel redesigned main closure structural proof test specification-procedure
None
Date:
December 22, 1966
Creator:
Ried, H. T. & Arnold, C. E.
System:
The UNT Digital Library
Chemical Processing Division monthly report, November 1966
This report, from the Chemical Processing Department at HAPO for November 1966, discusses the following: Production operation; Purex and Redox operation; Finished products operation; maintenance; Financial operations; facilities engineering; research; and employee-relations, and waste management.
Date:
December 21, 1966
Creator:
Reed, P. E.
System:
The UNT Digital Library
Status of irradiations performed by testing for BNW as of December 13, 1966
This report itemizes the irradiations performed by Testing for Battelle-Northwest Laboratories. It lists the material being irradiated, awaiting disposition and material shipped during the report period.
Date:
December 21, 1966
Creator:
DeMers, A. E.
System:
The UNT Digital Library
THEORY OF LONGITUDINAL INSTABILITIES IN SYNCHROTRONS, WITH APPLICATIONS.
None
Date:
December 16, 1966
Creator:
Pease, Robert L
System:
The UNT Digital Library
Baseline Configuration Selection, Voyager Task C
This report talks about Baseline Configuration Selection, Voyager Task C
Date:
December 15, 1966
Creator:
Concannon, M.; Mirabal, J. & Welch, J.
System:
The UNT Digital Library
Monthly report, November, 1966
This report gives summaries for the reactor plant operations, fuel and target fabrication, technical activities, advanced concepts and planning, and irradiation services. A feature report is included which describes the following: (1) the safety and control rod systems of the production reactors; (2) the problems which have developed with them; and (3) the corrective rod channel renovation and rod modification work which has been accomplished.
Date:
December 15, 1966
Creator:
unknown
System:
The UNT Digital Library
Preliminary spacecraft thermal integration analysis
None
Date:
December 15, 1966
Creator:
Mantia, C.P. & Freedman, S.I.
System:
The UNT Digital Library
Spacecraft radiation mapping, Voyager Task C
None
Date:
December 15, 1966
Creator:
Peden, J.C. & Bermanis, H.L.
System:
The UNT Digital Library
Composition of ending inventory, November 1966
Submitted herewith are source and special nuclear material composition of ending inventory reports for the month of November 1966. The depleted uranium, enriched uranium, plutonium, enriched lithium, U-233, normal uranium, neptunium 237, plutonium 238, deuterium, tritium, and thorium compositions are all broken down.
Date:
December 14, 1966
Creator:
Budd, R. O.
System:
The UNT Digital Library
DESIGN STUDY FOR A 1000-MeV BOOSTER SYNCHROTRON INJECTOR FOR THE BROOKHAVEN AGS.
None
Date:
December 13, 1966
Creator:
Barton, M. Q.; Blewett, J. P.; Courant, E. D.; Maschke, A. W.; Polk, I.; Spiro, J. et al.
System:
The UNT Digital Library
Sample calculation -- GVR values for determining tritium separations costs
This paper shows the calculations for the Gas Volume Ratio, defined as the Total Gas Volume/Target Volume. Using 20 tons of LiAlO{sub 2} as the target, 5028 cubic feet of tritium, protium, and helium are produced. The target volume equals 312.5 cubic feet of aluminate, so that the GVR = 5028/312.5 = 16.1.
Date:
December 12, 1966
Creator:
Bown, R. W.
System:
The UNT Digital Library
Materials forecast requirements
None
Date:
December 8, 1966
Creator:
Nilson, R.
System:
The UNT Digital Library
Flow capabilities B, C, and D Water Plants
The purpose of this report is to: establish the existing maximum flow capabilities of B, C and D Water Plants, determine the limiting factors under existing flow conditions and, develop a systematic plan, including scope cost estimates, for removal of limitations which can be accomplished without major expenditures.
Date:
December 1, 1966
Creator:
Scott, R. M.
System:
The UNT Digital Library
Fuels and materials development program quarterly progress report for period ending September 30, 1966
None
Date:
December 1, 1966
Creator:
Patriarca, P.
System:
The UNT Digital Library
Monthly production report, December 1966
This report deals with the production rate of the D-Reactor at the Hanford Reservation, from the years 1962 through 1967.
Date:
December 1, 1966
Creator:
unknown
System:
The UNT Digital Library
NR-1 sizing parameter study
None
Date:
December 1, 1966
Creator:
Retallick, F. D.
System:
The UNT Digital Library
Radiation effects program plans CY 1967
None
Date:
December 1, 1966
Creator:
Greenhow, W.A.
System:
The UNT Digital Library
SNAP 8 experimental reactor fuel element behavior: Atomics International task force review
None
Date:
November 30, 1966
Creator:
unknown
System:
The UNT Digital Library