Project Gasbuggy well plugging and site restoration plan (open access)

Project Gasbuggy well plugging and site restoration plan

The operational plan for conducting the final restoration work at the site of the first U.S. underground nuclear experiment for the stimulation of low-productivity natural gas reservoirs is given. The plan includes well plugging procedures, surface facilities decontamination and removal procedures, radiological guidelines, and environmental considerations.
Date: July 1, 1978
Creator: unknown
System: The UNT Digital Library
Project Gasbuggy (open access)

Project Gasbuggy

From cover: "A feasibility study concerned with nuclear explosive stimulation of a natural gas reservoir, prepared by El Paso Natural Gas Company, the United States Atomic Energy Commission and the United States Bureau of Mines."
Date: May 14, 1965
Creator: unknown
System: The UNT Digital Library
Project Gasbuggy Gas Quality Analysis and Evaluation Program Tabulation of Radiochemical and Chemical Analytical Results. (open access)

Project Gasbuggy Gas Quality Analysis and Evaluation Program Tabulation of Radiochemical and Chemical Analytical Results.

None
Date: January 1, 1969
Creator: Smith, C. F., Jr.
System: The UNT Digital Library
PROJECT GASBUGGY HOLE HISTORIES: GB-E GB-E-R GB-1 GB-2R GB-2RS GB-D GB-10- 36 GB-2. (open access)

PROJECT GASBUGGY HOLE HISTORIES: GB-E GB-E-R GB-1 GB-2R GB-2RS GB-D GB-10- 36 GB-2.

None
Date: January 1, 1968
Creator: unknown
System: The UNT Digital Library
Hydrology of Project Gasbuggy Site, Rio Arriba County, New Mexico. (open access)

Hydrology of Project Gasbuggy Site, Rio Arriba County, New Mexico.

None
Date: March 6, 1970
Creator: Mercer, Jerry W.
System: The UNT Digital Library