Geothermal Energy Program: Five Year Plan FY 1993-1998 (open access)

Geothermal Energy Program: Five Year Plan FY 1993-1998

None
Date: December 1, 1991
Creator: unknown
System: The UNT Digital Library
Waste management fiscal year 1998 progress report (open access)

Waste management fiscal year 1998 progress report

The Waste Management Program is pleased to issue the Fiscal Year 1998 Progress Report presenting program highlights and major accomplishments of the last year. This year-end update describes the current initiatives in waste management and the progress DOE has made toward their goals and objectives, including the results of the waste management annual performance commitments. One of the most important program efforts continues to be opening the Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, for the deep geologic disposal of transuranic waste. A major success was achieved this year by the West Valley Demonstration Project in New York, which in June completed the project`s production phase of high-level waste processing ahead of schedule and under budget. Another significant accomplishment this year was the award of two privatization contracts for major waste management operations, one at Oak ridge for transuranic waste treatment, and one at Hanford for the Tank Waste Remediation System privatization project. DOE is proud of the progress that has been made, and will continue to pursue program activities that allow it to safely and expeditiously dispose of radioactive and hazardous wastes across the complex, while reducing worker, public, and environmental risks.
Date: December 31, 1998
Creator: unknown
System: The UNT Digital Library
Fiscal Year 1998 report theoretical studies of ground energy coupling (open access)

Fiscal Year 1998 report theoretical studies of ground energy coupling

A method for calculating the redistribution of resonance radiation in hot, dense plasmas is developed by extending the Frequency Fluctuation Model (FFM). This paper is devoted to a brief review of lineshape theory in the linear response approximation, and an introduction to the FFM approach to the modeling of lineshapes in plasmas. This discussion begins with a consideration of the spectral lines emitted by complex ions in plasmas. As is well known, the lineshape is determined by the time- dependent coupling of the ion with the plasma environment. This plasma-emitter interaction, leads to Stark broadening of the spectral lines, and traditionally has been considered in the approximation which treats the ef&@ of the electrons on the emitting ion in the impact limit while the ionic perturbation is� taken to be quasi-static. In this approximation, the time dependence of the perturbation has been eliminated, resulting in a spectral line shape that has purely homogeneous and inhomogeneous contributions and that is described by a simple sum of independent electron imp� act broadened static components. In order to clarify the concepts presented, examples of radiative redistribution functions for simple cases are presented. Included is an example of an X-ray laser pumped system which …
Date: December 10, 1998
Creator: Klein, L.
System: The UNT Digital Library
Enhanced surveillance program annual report FY98. Dynamic behavior of Pu and U (intermediate strain rates) -- LA12 (open access)

Enhanced surveillance program annual report FY98. Dynamic behavior of Pu and U (intermediate strain rates) -- LA12

The Kolsky-Hopkinson Bar Dynamic Test Facility in Building PF-4 at TA-55 recently became operational and the first series of plutonium samples from a baseline alloy were successfully tested on December 8, 1997 through the dedicated efforts of a large number of people in groups NMT-9, NMT-11, MST-8, NMT-5, and JCI. The Enhanced Surveillance Program provided the necessary support for this achievement. The Kolsky-Hopkinson bar is an instrument designed to measure the uniaxial compression stress-strain characteristics of special nuclear materials (SNM) in a glovebox environment at intermediate strain rates (typically 500 s{sup {minus}1} to 10,000 s{sup {minus}1}), over a wide temperature range (cryogenic up to near-melting temperatures), and up to strains of about 50% per test. Due to radiation contamination hazards, SNM samples are contained within a specially designed glovebox with only a small portion of the bar system. The uniaxial high-strain-rate deformation behavior of SNM materials is revealed by stress-strain-strain rate curves calculated from strain signals acquired by gauges on the pressure bars. The compressive stress-strain mechanical behavior of a range of weapons-relevant SNM materials (both baseline and stockpile-aged plutonium and enriched uranium), measured over a wide range of strain rates and temperatures, is necessary to support the development of …
Date: December 31, 1998
Creator: Blumenthal, W.R.
System: The UNT Digital Library
Fiscal Year 1998 Well Installation, Plugging and Abandonment, and Redevelopment summary report Y-12 Plant, Oak Ridge, Tennessee (open access)

Fiscal Year 1998 Well Installation, Plugging and Abandonment, and Redevelopment summary report Y-12 Plant, Oak Ridge, Tennessee

This report summarizes the well installation, plugging and abandonment, and redevelopment activities conducted during the federal fiscal year (FY) 1998 at the Y-12 Plant, Oak Ridge, Tennessee. Five new groundwater monitoring wells were installed at the Y-12 Plant under the FY 1998 drilling program. Two of the wells are located in west Bear Creek Valley, one is in the eastern Y-12 Plant area near Lake Reality, and two are located near the Oil Landfarm Waste Management Area, which were installed by Bechtel Jacobs Company LLC (Bechtel Jacobs) as part of a site characterization activity for the Oak Ridge Reservation (ORR) Disposal Cell. Also, two existing wells were upgraded and nine temporary piezometers were installed to characterize hydrogeologic conditions at the Disposal Cell site. In addition, 40 temporary piezometers were installed in the Boneyard/Bumyard area of Bear Creek Valley by Bechtel Jacobs as part of the accelerated remedial actions conducted by the Environmental Restoration Program. Ten monitoring wells at the Y-12 Plant were decommissioned in FY 1998. Two existing monitoring wells were redeveloped during FY 1998 (of these, GW-732 was redeveloped tsvice). All well installation and development (including redevelopment) was conducted following industry-standard methods and approved procedures from the Environmental Surveillance …
Date: December 1, 1998
Creator: unknown
System: The UNT Digital Library
Lawrence Berkeley Laboratory Institutional Plan FY 1995--2000 (open access)

Lawrence Berkeley Laboratory Institutional Plan FY 1995--2000

This report presents the details of the mission and strategic plan for Lawrence Berkeley Laboratory during the fiscal years of 1995--2000. It presents summaries of current programs and potential changes; critical success factors such as human resources; management practices; budgetary allowances; and technical and administrative initiatives.
Date: December 1, 1994
Creator: unknown
System: The UNT Digital Library