215 MWD/Ton batch size limits and control in the Bismuth Phosphate Plant (open access)

215 MWD/Ton batch size limits and control in the Bismuth Phosphate Plant

None
Date: May 24, 1954
Creator: Browne, W. G.
System: The UNT Digital Library
Hanford Atomic Products Operation monthly report, October 1954 (open access)

Hanford Atomic Products Operation monthly report, October 1954

This document presents a summary of work and progress at the Hanford Engineer Works for October 1954. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summarizes work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.
Date: November 24, 1954
Creator: unknown
System: The UNT Digital Library
COMMERICAL UTILIZATION OF FLORIDA LEACHED ZONE ORE (open access)

COMMERICAL UTILIZATION OF FLORIDA LEACHED ZONE ORE

None
Date: February 24, 1954
Creator: Ellis, D.A. & Hill, H.W.
System: The UNT Digital Library
EXTRACTION OF URANIUM FROM LA VENTANA LIGNITE (open access)

EXTRACTION OF URANIUM FROM LA VENTANA LIGNITE

The extraction of uranium from raw lignite as well as from lignite ash samples was investigated. The uranium extractions obtainable under various leaching conditions and procedures are compared. Raw lignite yielded 92% of its uranium to carbonate leach solutions, and a uranium recovery of 96% was realized by a dilute sulfuric acid leach at 95 deg C of a lignite ash. (auth)
Date: March 24, 1954
Creator: Schwien, I.F.
System: The UNT Digital Library
Design criteria, Part 1: B Plant reactivation, 4X Program (open access)

Design criteria, Part 1: B Plant reactivation, 4X Program

The purpose of this report is to present the scope for the reactivation of the bismuth phosphate separations plant in the 200 East Area.
Date: September 24, 1954
Creator: Felts, W. R.
System: The UNT Digital Library
INTRACELL FLUX TRAVERSES AND THERMAL UTILIZATIONS, 1.027% ENRICHMENT URANIUM RODS IN LIGHT WATER (open access)

INTRACELL FLUX TRAVERSES AND THERMAL UTILIZATIONS, 1.027% ENRICHMENT URANIUM RODS IN LIGHT WATER

None
Date: March 24, 1954
Creator: Kouts, H. J.; Downes, K. W.; Price, G. A.; Sher, R. & Walsh, V. J.
System: The UNT Digital Library