Hanford Engineer Works technical progress letter No. 153, June 1--June 7 (open access)

Hanford Engineer Works technical progress letter No. 153, June 1--June 7

Progress is reported in the physics and engineering aspects of pile technology.
Date: June 12, 1947
Creator: unknown
System: The UNT Digital Library
100 Areas Technical Activities Report - Physics, January 1947 (open access)

100 Areas Technical Activities Report - Physics, January 1947

Four routine shutdowns were experienced during the month. A measurable amount of the excess reactivity held in the control rods at the first of the month has been lost in the decrease in the average accumulated exposure of all the metal in the pile. The vertical safety rod guides have been measured for vertical alignment by the Maintenance Dept. A definite pattern has been found in the misalignment of the guides. The horizontal rod thimbles were borrowed on January 2, 1947 to see if any leaks were present. No leaks were observed but No. 2 Rod and No. 8 Rod had heavy gouge marks along the longitudinal axes. Several thimbles contained white corrosion. During the month two new bismuth tubes were established, 2871-D and 2877-D. This now gives the desired pattern of ten bismuth tubes.
Date: February 12, 1947
Creator: Montgomery, E. B.