Resource Type

5,416 Matching Results

Results open in a new window/tab.

1.5D Quasilinear Model for Alpha Particle-TAE Interaction in ARIES ACT-I (open access)

1.5D Quasilinear Model for Alpha Particle-TAE Interaction in ARIES ACT-I

We study the TAE interaction with alpha particle fusion products in ARIES ACT-I using the 1.5D quasilinear model. 1.5D uses linear analytic expressions for growth and damping rates of TAE modes evaluated using TRANSP pro les to calculates the relaxation of pressure pro les. NOVA- K simulations are conducted to validate the analytic dependancies of the rates, and to normalize their absolute value. The low dimensionality of the model permits calculating loss diagrams in large parameter spaces.
Date: January 30, 2013
Creator: Ghantous, K.; Gorelenkov, N. N.; Kessel, C. & Poli, F.
System: The UNT Digital Library
1 mil gold bond wire study. (open access)

1 mil gold bond wire study.

In microcircuit fabrication, the diameter and length of a bond wire have been shown to both affect the current versus fusing time ratio of a bond wire as well as the gap length of the fused wire. This study investigated the impact of current level on the time-to-open and gap length of 1 mil by 60 mil gold bond wires. During the experiments, constant current was provided for a control set of bond wires for 250ms, 410ms and until the wire fused; non-destructively pull-tested wires for 250ms; and notched wires. The key findings were that as the current increases, the gap length increases and 73% of the bond wires will fuse at 1.8A, and 100% of the wires fuse at 1.9A within 60ms. Due to the limited scope of experiments and limited data analyzed, further investigation is encouraged to confirm these observations.
Date: May 1, 2013
Creator: Huff, Johnathon; McLean, Michael B.; Jenkins, Mark W. & Rutherford, Brian Milne
System: The UNT Digital Library
14-plex Feasibility Report (open access)

14-plex Feasibility Report

The Native Village of Unalakleet project was a feasibility study for a retrofit of a “tribally owned” three story, 14 apartment complex located in Unalakleet, Alaska. The program objective and overall goal was to create a plan for retrofitting to include current appraised value and comparable costs of new construction to determine genuine feasibility as low-income multi-family housing for tribal members.
Date: June 21, 2013
Creator: Kotongan, Victoria Hazel
System: The UNT Digital Library
17 GHz High Gradient Accelerator Research (open access)

17 GHz High Gradient Accelerator Research

This is a report on the MIT High Gradient Accelerator Research program which has included: Operation of the 17 GHz, 25 MeV MIT/Haimson Research Corp. electron accelerator at MIT, the highest frequency, stand-alone accelerator in the world; collaboration with members of the US High Gradient Collaboration, including the design and test of novel structures at SLAC at 11.4 GHz; the design, construction and testing of photonic bandgap structures, including metallic and dielectric structures; the investigation of the wakefields in novel structures; and the training of the next generation of graduate students and postdoctoral associates in accelerator physics.
Date: July 10, 2013
Creator: Temkin, Richard J. & Shapiro, Michael A.
System: The UNT Digital Library
241-AW Tank Farm Construction Extent of Condition Review for Tank Integrity (open access)

241-AW Tank Farm Construction Extent of Condition Review for Tank Integrity

This report provides the results of an extent of condition construction history review for the 241-AW tank farm. The construction history of the 241-AW tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AW tank farm, the fourth double-shell tank farm constructed, similar issues as those with tank 241-AY-102 construction occured. The overall extent of similary and affect on 241-AW tank farm integrity is described herein.
Date: November 19, 2013
Creator: Barnes, Travis J.; Gunter, Jason R. & Reeploeg, Gretchen E.
System: The UNT Digital Library
241-AY-101 Tank Construction Extent of Condition Review for Tank Integrity (open access)

241-AY-101 Tank Construction Extent of Condition Review for Tank Integrity

This report provides the results of an extent of condition construction history review for tank 241-AY-101. The construction history of tank 241-AY-101 has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In tank 241-AY-101, the second double-shell tank constructed, similar issues as those with tank 241-AY-102 construction reoccurred. The overall extent of similary and affect on tank 241-AY-101 integrity is described herein.
Date: August 26, 2013
Creator: Barnes, Travis J. & Gunter, Jason R.
System: The UNT Digital Library
241-AZ Farm Annulus Extent of Condition Baseline Inspection (open access)

241-AZ Farm Annulus Extent of Condition Baseline Inspection

This report provides the results of the comprehensive annulus visual inspection for tanks 241- AZ-101 and 241-AZ-102 performed in fiscal year 2013. The inspection established a baseline covering about 95 percent of the annulus floor for comparison with future inspections. Any changes in the condition are also included in this document.
Date: May 15, 2013
Creator: Engeman, Jason K.; Girardot, Crystal L. & Vazquez, Brandon J.
System: The UNT Digital Library
241-AZ Tank Farm Construction Extent of Condition Review for Tank Integrity (open access)

241-AZ Tank Farm Construction Extent of Condition Review for Tank Integrity

This report provides the results of an extent of condition construction history review for tanks 241-AZ-101 and 241-AZ-102. The construction history of the 241-AZ tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AZ tank farm, the second DST farm constructed, both refractory quality and tank and liner fabrication were improved.
Date: July 30, 2013
Creator: Barnes, Travis J.; Boomer, Kayle D.; Gunter, Jason R. & Venetz, Theodore J.
System: The UNT Digital Library
241-SY Tank Farm Construction Extent of Condition Review for Tank Integrity (open access)

241-SY Tank Farm Construction Extent of Condition Review for Tank Integrity

This report provides the results of an extent of condition construction history review for tanks 241-SY-101, 241-SY-102, and 241-SY-103. The construction history of the 241-SY tank farm has been reviewed to identify issues similar to those experienced during tank 241-AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank 241-AY-102 as the comparison benchmark. In the 241-SY tank farm, the third DST farm constructed, refractory quality and stress relief were improved, while similar tank and liner fabrication issues remained.
Date: July 25, 2013
Creator: Barnes, Travis J.; Boomer, Kayle D.; Gunter, Jason R. & Venetz, Theodore J.
System: The UNT Digital Library
L-325 Sagebrush Habitat Mitigation Project: Final Compensation Area Monitoring Report (open access)

L-325 Sagebrush Habitat Mitigation Project: Final Compensation Area Monitoring Report

This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor), now Mission Support Alliance (MSA), Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades (2007). Three plantings have been installed on a 4.5-hectare mitigation area to date. This review provides a description and chronology of events, monitoring results, and mitigative actions through fiscal year (FY) 2012. Also provided is a review of the monitoring methods, transect layout, and FY 2012 monitoring activities and results for all planting years. Planting densities and performance criteria stipulated in the MAP were aimed at a desired future condition (DFC) of 10 percent mature sagebrush (Artemisia tridentata ssp wyomingensis) cover. Current recommendations for yielding this DFC are based upon a conceptual model planting of 1000 plants/ha (400/ac) exhibiting a 60-percent survival rate after 5 monitoring years (DOE 2003). Accordingly, a DFC after 5 monitoring years would not be less than 600 plants/ha (240/ac). To date, about 8700 sagebrush plants have been grown and transplanted onto the mitigation site. Harsh site conditions and low seedling survival have resulted in an estimated 489 transplants/ha on the mitigation site, which is 111 plants/ha short of the target DFC. …
Date: September 26, 2013
Creator: Durham, Robin E. & Becker, James M.
System: The UNT Digital Library
401(K) Plans: Labor and IRS Could Improve the Rollover Process for Participants (open access)

401(K) Plans: Labor and IRS Could Improve the Rollover Process for Participants

A letter report issued by the Government Accountability Office with an abstract that begins "The current rollover process favors distributions to individual retirement accounts (IRA). Waiting periods to roll into a new employer plan, complex verification procedures to ensure savings are tax-qualified, wide divergences in plans' paperwork, and inefficient practices for processing rollovers make IRA rollovers an easier and faster choice, especially given that IRA providers often offer assistance to plan participants when they roll their savings into an IRA. The Department of Labor (Labor) and the Internal Revenue Service (IRS) provide oversight and guidance for this process generally and can take steps to make plan-to-plan rollovers more efficient, such as reducing the waiting period to roll over into a 401(k) plan and improving the asset verification process. Such actions could help make staying in the 401(k) plan environment a more viable option, allowing participants to make distribution decisions based on their financial circumstances rather than on convenience."
Date: March 7, 2013
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
401(k) Plans: Other Countries' Experiences Offer Lessons in Policies and Oversight of Spend-down Options (open access)

401(k) Plans: Other Countries' Experiences Offer Lessons in Policies and Oversight of Spend-down Options

A letter report issued by the Government Accountability Office with an abstract that begins "The six countries GAO reviewed can offer U.S. regulators lessons on how to expand access to a mix of spend-down options for 401(k) participants that meet various retirement needs. Five of the six countries generally ensure that participants can choose among three main plan options: a lump sum payment, a programmed withdrawal of participants' savings, or an annuity. In the last several decades, all the countries took steps to increase participant access to multiple spend-down options, with some first conducting reviews of participants' retirement needs that resulted in policy changes, as shown below. In the United States, 401(k) plans typically offer only lump sums, leaving some participants at risk of outliving their savings. The U.S. Departments of Labor (DOL) and the Treasury (Treasury) have begun to explore the possibility of expanding options for participants, but have not yet helped plan sponsors address key challenges to offering a mix of options through their plan."
Date: November 20, 2013
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
501(c)(3)s and Campaign Activity: Analysis Under Tax and Campaign Finance Laws (open access)

501(c)(3)s and Campaign Activity: Analysis Under Tax and Campaign Finance Laws

From Summary: "This report examines the restrictions imposed on campaign activity by Section 501(c)(3) organizations under the tax and campaign finance laws."
Date: September 10, 2013
Creator: Lunder, Erika, L. & Whitaker, L. Paige
System: The UNT Digital Library
501(c)(4)s and Campaign Activity: Analysis Under Tax and Campaign Finance Laws (open access)

501(c)(4)s and Campaign Activity: Analysis Under Tax and Campaign Finance Laws

This report discusses 501(c)(4) social welfare organizations, including the requirements necessary to maintain 501(c)(4) status and the requirements for annual reporting to the Internal Revenue Service and Federal Election Commission.
Date: May 17, 2013
Creator: Lunder, Erika K. & Whitaker, L. Paige
System: The UNT Digital Library
911 Services: Most States Used 911 Funds for Intended Purposes, but FCC Could Improve Its Reporting on States' Use of Funds (open access)

911 Services: Most States Used 911 Funds for Intended Purposes, but FCC Could Improve Its Reporting on States' Use of Funds

A letter report issued by the Government Accountability Office with an abstract that begins "Although states faced challenges and delays in the past, states have made significant progress implementing wireless Enhanced 911 (E911) since 2003. Wireless E911 deployment usually proceeds through two phases: Phase I provides general caller location information by identifying the cell tower or cell site that is receiving the wireless call; Phase II provides more precise caller-location information, usually within 50 to 300 meters. Currently, according to the National Emergency Number Association (NENA), nearly 98 percent of 911 call centers, known as Public Safety Answering Points (PSAPs), are capable of receiving Phase I location information, and 97 percent have implemented Phase II for at least one wireless carrier. This represents a significant improvement since 2003 when implementation of Phase I was 65 percent and Phase II was 18 percent. According to NENA's current data, 142 U.S. counties (representing roughly 3 percent of the U.S. population) do not have some level of wireless E911 service. The areas that lack wireless E911 are primarily rural and tribal areas that face special implementation challenges, according to federal and association officials."
Date: April 18, 2013
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
The 2010 Deepwater Horizon Oil Spill: Natural Resource Damage Assessment Under the Oil Pollution Act (open access)

The 2010 Deepwater Horizon Oil Spill: Natural Resource Damage Assessment Under the Oil Pollution Act

Report that examines the Natural Resources Damage Assessment (NRDA) process under the Oil Pollution Act (OPA) in the context of the Deepwater Horizon spill.
Date: July 24, 2013
Creator: Vann, Adam & Meltz, Robert
System: The UNT Digital Library
2010 Ford Fusion VIN 4757 Hybrid Electric Vehicle Battery Test Results (open access)

2010 Ford Fusion VIN 4757 Hybrid Electric Vehicle Battery Test Results

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on-road fleet testing. This report documents battery testing performed for the 2010 Ford Fusion HEV (VIN: 3FADP0L34AR144757). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.
Date: January 1, 2013
Creator: Gray, Tyler & Shirk, Matthew
System: The UNT Digital Library
2010 Honda Civic Hybrid UltraBattery Conversion 5577 - Hybrid Electric Vehicle Battery Test Results (open access)

2010 Honda Civic Hybrid UltraBattery Conversion 5577 - Hybrid Electric Vehicle Battery Test Results

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of on-road fleet testing. This report documents battery testing performed for the 2010 Honda Civic HEV UltraBattery Conversion (VIN JHMFA3F24AS005577). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the AVTA for the Vehicle Technologies Program of the DOE.
Date: July 1, 2013
Creator: Gray, Tyler; Shirk, Matthew & Wishart, Jeffrey
System: The UNT Digital Library
2010 Honda Insight VIN 0141 Hybrid Electric Vehicle Battery Test Results (open access)

2010 Honda Insight VIN 0141 Hybrid Electric Vehicle Battery Test Results

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on road fleet testing. This report documents battery testing performed for the 2010 Honda Insight HEV (VIN: JHMZE2H78AS010141). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.
Date: January 1, 2013
Creator: Gray, Tyler
System: The UNT Digital Library
2010 Honda Insight VIN 1748 Hybrid Electric Vehicle Battery Test Results (open access)

2010 Honda Insight VIN 1748 Hybrid Electric Vehicle Battery Test Results

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on road fleet testing. This report documents battery testing performed for the 2010 Honda Insight HEV (VIN: JHMZE2H59AS011748). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.
Date: January 1, 2013
Creator: Gray, Tyler & Shirk, Matthew
System: The UNT Digital Library
2010 Toyota Prius VIN 0462 Hybrid Electric Vehicle Battery Test Results (open access)

2010 Toyota Prius VIN 0462 Hybrid Electric Vehicle Battery Test Results

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on road fleet testing. This report documents battery testing performed for the 2010 Toyota Prius HEV (VIN: JTDKN3DU2A5010462). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.
Date: January 1, 2013
Creator: Gray, Tyler & Shirk, Matthew
System: The UNT Digital Library
2010 Toyota Prius VIN 6063 Hybrid Electric Vehicle Battery Test Results (open access)

2010 Toyota Prius VIN 6063 Hybrid Electric Vehicle Battery Test Results

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on road fleet testing. This report documents battery testing performed for the 2010 Toyota Prius HEV (VIN JTDKN3DU5A0006063). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.
Date: January 1, 2013
Creator: Gray, Tyler & Shirk, Matthew
System: The UNT Digital Library
2011 Chevrolet Volt VIN 0815 Plug-In Hybrid Electric Vehicle Battery Test Results (open access)

2011 Chevrolet Volt VIN 0815 Plug-In Hybrid Electric Vehicle Battery Test Results

The U.S. Department of Energy (DOE) Advanced Vehicle Testing Activity (AVTA) program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on plug-in hybrid electric vehicles (PHEVs), including testing the PHEV batteries when both the vehicles and batteries are new and at the conclusion of 12,000 miles of on-road fleet testing. This report documents battery testing performed for the 2011 Chevrolet Volt PHEV (VIN 1G1RD6E48BU100815). The battery testing was performed by the Electric Transportation Engineering Corporation (eTec) dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the AVTA for the Vehicle Technologies Program of the DOE.
Date: July 1, 2013
Creator: Gray, Tyler; Shirk, Matthew & Wishart, Jeffrey
System: The UNT Digital Library
2011 Cost of Wind Energy Review (open access)

2011 Cost of Wind Energy Review

This report describes the levelized cost of energy (LCOE) for a typical land-based wind turbine installed in the United States in 2011, as well as the modeled LCOE for a fixed-bottom offshore wind turbine installed in the United States in 2011. Each of the four major components of the LCOE equation are explained in detail, such as installed capital cost, annual energy production, annual operating expenses, and financing, and including sensitivity ranges that show how each component can affect LCOE. These LCOE calculations are used for planning and other purposes by the U.S. Department of Energy's Wind Program.
Date: March 1, 2013
Creator: Tegen, S.; Lantz, E.; Hand, M.; Maples, B.; Smith, A. & Schwabe, P.
System: The UNT Digital Library