5 Matching Results

Results open in a new window/tab.

Economic Recovery: Sustaining U.S. Economic Growth in a Post-Crisis Economy (open access)

Economic Recovery: Sustaining U.S. Economic Growth in a Post-Crisis Economy

This report looks at how Congress has been proactive in helping the economy recover after the 2008-2009 recession, as well as how it can help to keep recessions at bay in the future. Issues include typical post-war recessions, insufficient pace of private spending, and the long-term debt problem.
Date: July 22, 2010
Creator: Elwell, Craig K.
System: The UNT Digital Library
U.S.-China Military Contacts: Issues for Congress (open access)

U.S.-China Military Contacts: Issues for Congress

This CRS report, updated as warranted, discusses policy issues regarding military-to-military (mil-to-mil) contacts with the People's Republic of China (PRC) and provides a record of major contacts and crises since 1993. The United States suspended military contacts with China and imposed sanctions on arms sales in response to the Tiananmen Crackdown in 1989.
Date: July 22, 2010
Creator: Kan, Shirley A.
System: The UNT Digital Library
DISSOLUTION OF IRRADIATED MURR FUEL ASSEMBLIES EFFECT OF INCREASED PURGE RATE AND CATALYST CONCENTRATION ON THE BATCH SIZE (open access)

DISSOLUTION OF IRRADIATED MURR FUEL ASSEMBLIES EFFECT OF INCREASED PURGE RATE AND CATALYST CONCENTRATION ON THE BATCH SIZE

Flowsheets for the dissolution of aluminum-clad spent nuclear fuel have been proposed using 0.002 M mercuric nitrate catalyst in 5 to 6 M nitric acid. Previous calculations for flammable gas control during the dissolution of spent nuclear fuel have been extended to cover a range of dissolver purge rates from 40 to 55 scfm. A range of dissolver solution volumes from 12000 to 15000 liters were considered for the large H-Canyon dissolver (6.4D). Depending on the purge rate, anywhere from four to six bundles of MURR fuel can be initially charged to the dissolver (6.4D). For successive charges where the dissolver solution already contains 0.002 M mercury catalyst and the dissolved aluminum from five bundles of MURR fuel, five to nine bundles of additional fuel can be charged depending on the purge rate and the dissolver solution volume. Similar calculations have been performed for the small H-Canyon dissolver (6.1D) for solution volumes that ranged from 6000 to 7500 liters and purge rates from 40 to 55 scfm. The limitations on the initial charge are four to six bundles depending on the purge rate. The aluminum from four bundles of fuel in an initial charge will allow nine to ten bundles …
Date: July 22, 2010
Creator: Kyser, E.
System: The UNT Digital Library
National Park System: Establishing New Units (open access)

National Park System: Establishing New Units

None
Date: July 22, 2010
Creator: unknown
System: The UNT Digital Library
Papers from U.S. Department of Energy Science Undergraduate Laboratory Internship Program (SULI) 2009 (open access)

Papers from U.S. Department of Energy Science Undergraduate Laboratory Internship Program (SULI) 2009

None
Date: July 22, 2010
Creator: unknown
System: The UNT Digital Library