Resource Type

9 Matching Results

Results open in a new window/tab.

2004 Lasers Materials Interactions Gordon Research Conferences August 1-6, 2004 (open access)

2004 Lasers Materials Interactions Gordon Research Conferences August 1-6, 2004

The Report is Gordon Research Conferences Laser Interaction with materials.
Date: August 17, 2005
Creator: Dickinson, Nancy Ryan Gray J. Thomas
System: The UNT Digital Library
2004 Catalysis Gordon Conference-June 27-July 2, (open access)

2004 Catalysis Gordon Conference-June 27-July 2,

The Conference was well-attended with 100 participants (attendees list included). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, U.S. and foreign scientists, senior researchers, young investigators, and students. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. The formal schedule and speaker program and the poster program is given. In addition to these formal interactions, 'free time' was scheduled to allow informal discussions. Such discussions are fostering new collaborations and joint efforts in the field.
Date: August 17, 2005
Creator: Gray, Nancy Ryan & Stair, Peter C.
System: The UNT Digital Library
Recent GPS Results at SLAC (open access)

Recent GPS Results at SLAC

The Alignment Engineering Group (AEG) makes use of GPS technology for fulfilling part of its above ground surveying tasks at SLAC since early 2002. A base station (SLAC M40) has been set up at a central location of the SLAC campus serving both as master station for real-time kinematic (RTK) operations and as datum point for local GPS campaigns. The Leica RS500 system is running continuously and the GPS data are collected both externally (logging PC) and internally (receiver flashcard). The external logging is facilitated by a serial to Ethernet converter and an Ethernet connection at the station. Internal logging (ring buffer) is done for data security purposes. The weatherproof boxes for the instrumentation are excellent shelters against rain and wind, but do heat up considerably in sun light. Whereas the GPS receiver showed no problems, the Pacific Crest PDL 35 radio shut down several times due to overheating disrupting the RTK operations. In order to prevent heat-induced shutdowns, a protection against direct sun exposure (shading) and a constant air circulation system (ventilation) were installed. As no further shutdowns have occurred so far, it appears that the two measures successfully mended the heat problem.
Date: August 17, 2005
Creator: Behrend, Dirk & Imfeld, Hans L.
System: The UNT Digital Library
SPEAR3 Construction Alignment (open access)

SPEAR3 Construction Alignment

An ambitious seven month shutdown of the existing SPEAR2 synchrotron radiation facility was successfully completed in March 2004 when the first synchrotron light was observed in the new SPEAR3 ring, SPEAR3 completely replaced SPEAR2 with new components aligned on a new highly-flat concrete floor. Devices such as magnets and vacuum chambers had to be fiducialized and later aligned on girder rafts that were then placed into the ring over pre-aligned support plates. Key to the success of aligning this new ring was to ensure that the new beam orbit matched the old SPEAR2 orbit so that existing experimental beamlines would not have to be reoriented. In this presentation a pictorial summary of the Alignment Engineering Group's surveying tasks for the construction of the SPEAR3 ring is provided. Details on the networking and analysis of various surveys throughout the project can be found in the accompanying paper.
Date: August 17, 2005
Creator: LeCocq, Catherine; Banuelos, Cristobal; Fuss, Brian; Gaudreault, Francis; Gaydosh, Michael; Griffin, Levirt et al.
System: The UNT Digital Library
Search for Lepton Flavour Violation (LFV) in Three-Body Tau Decays at BaBar (open access)

Search for Lepton Flavour Violation (LFV) in Three-Body Tau Decays at BaBar

The results of searches for Lepton Flavour Violating (LFV) decays at the BaBar detector located on the PEP-II collider, using data collected at an e{sup +}e{sup -} energy of 10.58 GeV, are presented. Upper limits at 90% Confidence Level (CL) are established in the range 1-3 x 10{sup -7} for six {tau} {yields} lll modes using 91.5 fb{sup -1} of data and in the range 0.7-4.8 x 10{sup -7} for fourteen {tau} {yields} lhh modes using 221.4 fb{sup -1} of data. The {tau} {yields} lhh results are preliminary.
Date: August 17, 2005
Creator: Hodgkinson, M.
System: The UNT Digital Library
Alignment without Magnet Fiducials (open access)

Alignment without Magnet Fiducials

Presently, the demand for high quality synchrotron radiation is increasing all over the world. One of the fascinating aspects of this novel tool is the broad range of scientific users interested in synchrotron radiation. They come from physics, chemistry, biology, and medicine, to name just a few. Third generation storage which recently became available for users will by far not be able to satisfy all the beam-time requests. In addition, it is also recognized that long-term scientific efficiency and technological success is heavily dependent on ease of access to a home based facility nearby and continuing fine-tuning of all components of a beam line. Based on the high quality user community in Switzerland and their prospective research activities, the Paul Scherrer Institute, in close collaboration with interested research groups from the Swiss universities and the Swiss Federal Institutes of Technology, has worked out a proposal to build an advanced synchrotron light source in Switzerland, which will come into operation in the year 2001. It has been named SLS as acronym for Swiss Light Source.
Date: August 17, 2005
Creator: Ruland, Robert; Mulhaupt, Gottfried; Rohrer, Martin & Wiegand, Peter
System: The UNT Digital Library
Alignment Tools Used to Locate a Wire and a Laser Beam in the VISA Undulator Project (open access)

Alignment Tools Used to Locate a Wire and a Laser Beam in the VISA Undulator Project

The Stanford Linear Accelerator Center is evaluating the feasibility of placing a free electron laser (FEL) at the end of the linear accelerator. The proposal is to inject electrons two thirds of the way down the linac, accelerate the electrons for the last one third of the linac, and then send the electrons into the FEL. This project is known as the LCLS (Linac Coherent Light Source). To test the feasibility of the LCLS, a smaller experiment VISA (Visual to Infrared SASE (Self Amplified Stimulated Emission) Amplifier) is being performed at Brookhaven National Laboratory. VISA consists of four wiggler segments, each 0.99 m long. The four segments are required to be aligned to the beam axis with an rms error less than 50 {micro}m [1]. This very demanding alignment is carried out in two steps [2]. First the segments are fiducialized using a pulsed wire system. Then the wiggler segments are placed along a reference laser beam which coincides with the electron beam axis. In the wiggler segment fiducialization, a wire is stretched through a wiggler segment and a current pulse is sent down the wire. The deflection of the wire is monitored. The deflection gives information about the electron …
Date: August 17, 2005
Creator: Wolf, Z.; Ruland, R.; Dix, B. & Arnett, D.
System: The UNT Digital Library
Initial Calibration of a High Resolution Digital Camera for Accelerator Alignment (open access)

Initial Calibration of a High Resolution Digital Camera for Accelerator Alignment

None
Date: August 17, 2005
Creator: Fuss, Brian; LeCocq, Catherine & Ruland, Robert
System: The UNT Digital Library
Status Report on the Alighment Activities at SLAC (open access)

Status Report on the Alighment Activities at SLAC

Summary of the major alignment activities that have taken place at SLAC.
Date: August 17, 2005
Creator: LeCocq, Catherine; Fuss, Brian & Ruland, Robert
System: The UNT Digital Library