Resource Type

7,923 Matching Results

Results open in a new window/tab.

2.1 Pan-WCRP Monsoon Modelling Workshop Summary (open access)

2.1 Pan-WCRP Monsoon Modelling Workshop Summary

Ken Sperber led a discussion of the outcome of the Pan-WCRP Monsoon Modelling Workshop that was held at the University of California at Irvine from 15-17 June 2005. At the workshop presentations from key CLIVAR and GEWEX panels were presented to highlight the outstanding problems in modelling the Earth's monsoons. Additionally, presentations from invited experts were given to highlight important aspects of monsoon phenomena and processes, such as low-level jets, air-sea interaction, predictability, observational networks/studies, and model test beds etc. Since all persons attending the CLIVAR AAMP meeting were present for all, or most, of the monsoon workshop, a detailed description of the workshop presentations was not given. Rather, the discussion was focused on the recommendations of the workshop breakout groups and their relevance to CLIVAR AAMP. CLIVAR AAMP endorsed the near-term workshop recommendation of investigating the diurnal cycle using a hierarchy of models a key way forward for promoting CLIVAR/GEWEX interactions. In GCM studies CLIVAR researchers have identified the diurnal cycle as a forced ''mode'' of variability that is poorly represented in terms of amplitude and phase, especially in the case of precipitation. Typical phase errors of 6-12 hours are noted over both land and ocean in GCMs. CLIVAR …
Date: June 28, 2005
Creator: Sperber, K R
System: The UNT Digital Library
2-D Modeling of Energy-z Beam Dynamics Using the LiTrack Matlab Program (open access)

2-D Modeling of Energy-z Beam Dynamics Using the LiTrack Matlab Program

Short bunches and the bunch length distribution have important consequences for both the LCLS project at SLAC and the proposed ILC project. For both these projects, it is important to simulate what bunch length distributions are expected and then to perform actual measurements. The goal of the research is to determine the sensitivity of the bunch length distribution to accelerator phase and voltage. This then indicates the level of control and stability that is needed. In this project I simulated beamlines to find the rms bunch length in three different beam lines at SLAC, which are the test beam to End Station A (ILC-ESA) for the ILC studies, Linac Coherent Light Source (LCLS) and LCLS-ESA. To simulate the beamlines, I used the LiTrack program, which does a 2-dimensional tracking of an electron bunch's longitudinal (z) and the energy spread beam (E) parameters. In order to reduce the time of processing the information, I developed a small program to loop over adjustable machine parameters. LiTrack is a Matlab script and Matlab is also used for plotting and saving and loading files. The results show that the LCLS in Linac-A is the most sensitive when looking at the ratio of change in …
Date: December 15, 2005
Creator: Cauley, S .K. & Woods, M.
System: The UNT Digital Library
2-D Reflectometer Modeling for Optimizing the ITER Low-field Side Reflectometer System (open access)

2-D Reflectometer Modeling for Optimizing the ITER Low-field Side Reflectometer System

The response of a low-field side reflectometer system for ITER is simulated with a 2?D reflectometer code using a realistic plasma equilibrium. It is found that the reflected beam will often miss its launch point by as much as 40 cm and that a vertical array of receiving antennas is essential in order to observe a reflection on the low-field side of ITER.
Date: September 2, 2005
Creator: Kramer, G. J.; Nazikian, R.; Valeo, E. J.; Budny, R. V.; Kessel, C. & Johnson, D.
System: The UNT Digital Library
2-Page Summary for Neptunium solubility in the Near-field Environment of A Proposed Yucca Mountain Repository (open access)

2-Page Summary for Neptunium solubility in the Near-field Environment of A Proposed Yucca Mountain Repository

The total system performance assessment (TSPA) for the proposed repository at Yucca Mountain, NV, includes a wide variety of processes to evaluate the potential release of radionuclides from the Engineered Barrier System into the unsaturated zone of the geosphere. The principal processes controlling radionuclide release and mobilization from the waste forms are captured in the model to assess the dissolved concentrations of radionuclides in the source-term. The TSPA model of the source-term incorporates the far-from-equilibrium dissolution of, for example, spent nuclear fuel (SNF) to capture bounding rates of radionuclide availability as the SNF degrades. In addition, for individual radionuclides, the source-term model evaluates solubility constraints that are more indicative of longer-term, equilibrium processes that can limit the potential mass transport from the source term in those cases. These solubility limits represent phase saturation and precipitation processes that can occur either at the waste form as it alters, or at other locations in the near-field environment (e.g., within the invert) if chemical conditions are different. Identification and selection of applicable constraints for solubility-limited radionuclide concentrations is a primary focus in formulating the source-term model for the TSPA. Neptunium is a long-lived radionuclide that becomes a larger fraction of the potential dose …
Date: March 29, 2005
Creator: Sassani, D.; van Luik, A. & Summerson, J.
System: The UNT Digital Library
A 3-D Model of Signaling and Transport Pathways in Epithelial Cells (open access)

A 3-D Model of Signaling and Transport Pathways in Epithelial Cells

A 3-dimensional computer model was developed to simulate the spatial and chemical evolution of calcium ions inside an array of human epithelial kidney cells. This is a prototype model, intended to develop a methodology to incorporate much more complex interactions of metabolic and other processes within many types of cells and lead to increased ability to predict cellular responses to disease as well as to chemical and biological warfare situations. Preliminary tests of the model are described.
Date: April 1, 2005
Creator: Quong, Andrew A. & Westbrook, Charles K.
System: The UNT Digital Library
3-D Seismic Experimentation and Advanced Processing/Inversion Development for Investigations of the Shallow Subsurface (open access)

3-D Seismic Experimentation and Advanced Processing/Inversion Development for Investigations of the Shallow Subsurface

Gian Fradelizio, a Rice Ph.D. student has completed reprocessing the 3D seismic reflection data acquired at Hill AFB through post-stack depth migration for comparison to the traveltime and waveform tomography results. Zelt, Levander, Fradelizio, and 5 others spent a week at Hill AFB in September 2005, acquiring an elastic wave data set along 2 profiles. We used 60 3-component Galperin mounted 40 Hz geophones recorded by 3 GEOMETRICS Stratavision systems. The seismic source employed was a sledgehammer used to generate transverse, and radial, and vertical point source data. Data processing has begun at Rice to generate S-wave reflection and refraction images. We also acquired surface wave and ground penetrating rada data to complement the elastic wave dataset.
Date: June 1, 2005
Creator: Levander, Alan R.
System: The UNT Digital Library
4-D High-Resolution Seismic Reflection Monitoring of Miscible CO2 Injected into a Carbonate Reservoir (open access)

4-D High-Resolution Seismic Reflection Monitoring of Miscible CO2 Injected into a Carbonate Reservoir

The objective of this research project is to acquire, process, and interpret multiple high-resolution 3-D compressional wave and 2-D, 2-C shear wave seismic data to observe changes in fluid characteristics in an oil field before, during, and after the miscible carbon dioxide (CO{sub 2}) flood that began around December 1, 2003, as part of the DOE-sponsored Class Revisit Project (DOE DE-AC26-00BC15124). Unique and key to this imaging activity is the high-resolution nature of the seismic data, minimal deployment design, and the temporal sampling throughout the flood. The 900-m-deep test reservoir is located in central Kansas oomoldic limestones of the Lansing-Kansas City Group, deposited on a shallow marine shelf in Pennsylvanian time. After 18 months of seismic monitoring, one baseline and six monitor surveys clearly imaged changes that appear consistent with movement of CO{sub 2} as modeled with fluid simulators.
Date: September 1, 2005
Creator: Miller, Richard D.; Raef, Abdelmoneam E.; Byrnes, Alan P. & Harrison, William E.
System: The UNT Digital Library
9/11 Commission Recommendations: The Senate Confirmation Process for Presidential Nominees (open access)

9/11 Commission Recommendations: The Senate Confirmation Process for Presidential Nominees

On July 22, 2004, the National Commission on Terrorist Attacks Upon the United States, known as the 9/11 Commission, issued its final report, detailing the events up to and including the September 11, 2001 terrorist attacks upon the United States. The 9/11 Commission recommended that the Senate adopt rules requiring hearings and votes to confirm or reject national security nominees within 30 days of their submission at the start of each new presidential administration. Implementing the commission's proposal would involve imposing new restrictions on both the power of committee chairs to control the agenda of their committees and the rights of Senators to delay or block nominations through holds and extended debate. This report discusses in detail this proposal, how it could be implemented, and the potential effects of its implementation.
Date: March 23, 2005
Creator: Palmer, Betsy
System: The UNT Digital Library
10 MMBt/Hr AFBC Commercial Demonstration Cedar Lane Farms (open access)

10 MMBt/Hr AFBC Commercial Demonstration Cedar Lane Farms

The objective of this project was to demonstrate and promote the commercialization of coal-fired atmospheric fluidized bed combustion (AFBC) systems, with limestone addition for SO2 emissions control and a baghouse for particulate emissions control. This AFBC system was targeted for small scale industrial-commercial-institutional space and process heat applications in the 4-40 MMBtu/hr size range. A cost effective and environmentally acceptable AFBC technology in this size range could displace a considerable amount of heating gas and oil with coal, while resulting in significant total cost savings to the owner/operators.
Date: October 31, 2005
Creator: Keener, Harold M.; Wicks, Mary H.; Machamer, Tom; Hoecke, Dave; Bonk, Don & Brown, Bob
System: The UNT Digital Library
21-PWR Waste Package Side and End Impacts (open access)

21-PWR Waste Package Side and End Impacts

The objective of this calculation is to determine the structural response of a 21-Pressurized Water Reactor (PWR) spent nuclear fuel waste package impacting an unyielding surface. A range of initial velocities and initial angles between the waste package and the unyielding surface is studied. The scope of this calculation is limited to estimating the area of the outer shell (OS) where the residual stress exceeds a given limit (hereafter ''damaged area''). The stress limit is defined as a fraction of the yield strength of the OS material, Alloy 22 (SB-575 N06022), at the appropriate temperature. The design of the 21-PWR waste package used in this calculation is that defined in Reference 8. However, a value of 4 mm was used for the gap between the inner shell and the OS, and the thickness of the OS was reduced by 2 mm. The sketch in Attachment I provides additional information not included in Reference 8. All obtained results are valid for this design only. This calculation is associated with the waste package design and was performed by the Specialty Analyses and Waste Package Design Section. The waste package (i.e. uncanistered spent nuclear fuel disposal container) is classified as Quality Level 1.
Date: August 29, 2005
Creator: Schmitt, T.
System: The UNT Digital Library
100/300 Area Aquifer Tube Task: Annual Sampling for Fiscal Year 2006, Hanford Site, Washington (open access)

100/300 Area Aquifer Tube Task: Annual Sampling for Fiscal Year 2006, Hanford Site, Washington

This letter report has been prepared to provide the U.S. Department of Energy, U.S. Environmental Protection Agency, Washington State Department of Ecology, and Hanford Site contractors with logistical information pertaining to the use of certain environmental monitoring sites. Although the distribution is not limited, It is not intended for general distribution beyond that audience.
Date: November 1, 2005
Creator: Peterson, Robert E.; Hartman, Mary J.; Raidl, Robert F. & Borghese, Jane V.
System: The UNT Digital Library
120 MW, 800 MHz Magnicon for a Future Muon Collider (open access)

120 MW, 800 MHz Magnicon for a Future Muon Collider

Development of a pulsed magnicon at 800 MHz was carried out for the muon collider application, based on experience with similar amplifiers in the frequency range between 915 MHz and 34.3 GHz. Numerical simulations using proven computer codes were employed for the conceptual design, while established design technologies were incorporated into the engineering design. A cohesive design for the 800 MHz magnicon amplifier was carried out, including design of a 200 MW diode electron gun, design of the magnet system, optimization of beam dynamics including space charge effects in the transient and steady-state regimes, design of the drive, gain, and output cavities including an rf choke in the beam exit aperture, analysis of parasitic oscillations and design means to eliminate them, and design of the beam collector capable of 20 kW average power operation.
Date: December 15, 2005
Creator: Hirshfield, Jay L.
System: The UNT Digital Library
S. 147/H.R. 309: Process for Federal Recognition of a Native Hawaiian Governmental Entity (open access)

S. 147/H.R. 309: Process for Federal Recognition of a Native Hawaiian Governmental Entity

From Summary: "This report describes the provisions of the reported version of S. 147; outlines some federal statutes and recent cases which might be relevant to the issue of federal recognition of a Hawaiian entity; and recounts some legal arguments that have been presented in the debate on this legislation."
Date: October 11, 2005
Creator: Murphy, M. Maureen
System: The UNT Digital Library
S. 147/H.R. 309: Process for Federal Recognition of a Native Hawaiian Governmental Entity (open access)

S. 147/H.R. 309: Process for Federal Recognition of a Native Hawaiian Governmental Entity

S. 147/H.R. 309, companion bills introduced in the 109th Congress, represent an effort to accord to Native Hawaiians a means of forming a governmental entity that could enter into government-to-government relations with the United States. This report describes the provisions of the reported version of S. 147; outlines some federal statutes and recent cases which might be relevant to the issue of federal recognition of a Native Hawaiian entity; and recounts some legal arguments that have been presented in the debate on this legislation. It includes a brief outline of the provisions of a substitute amendment expected to be offered in lieu of the reported version of S. 147, when Senate debate, which was interrupted by the filing of a cloture motion on July 29, resumes.
Date: September 27, 2005
Creator: Murphy, M. Maureen
System: The UNT Digital Library
200-BP-1 Prototype Hanford Barrier Annual Monitoring Report for Fiscal Year 2004 (open access)

200-BP-1 Prototype Hanford Barrier Annual Monitoring Report for Fiscal Year 2004

In FY 2004, monitoring of the prototype Hanford barrier focused on barrier stability, vegetative cover, evidence of plant and animal intrusion, and the main components of the water balance. Monitored water-balance components included precipitation, runoff, storage, drainage, and deep percolation. Precipitation in FY 2004 was 26 percent less than in FY 2003 but was still higher than normal. The seasonal distribution in precipitation was also different from the previous year with a 43 percent reduction in spring precipitation and a 46 percent increase in summer precipitation. The cumulative amount of water received from October 1994, through September 2004, was 2,559.58 mm on the northern half of the barrier, which is the formerly irrigated treatment, and 1,886.71 mm on the southern non-irrigated treatments. Water storage continued to show a cyclic pattern, increasing in the winter and declining in the spring and summer to a lower limit of about 100 mm in response to evapotranspiration. The 600-mm design storage has never been exceeded. Total drainage from the soil-covered plots range from 2.9E-4 mm to 0.22 mm or 0.003 6 0.004 percent of precipitation. Side-slope drainage was much higher at 20.9 6 2.3 percent of precipitation from the gravel and 18.6 6 5.1 …
Date: January 3, 2005
Creator: Ward, Andy L.; Linville, Jenifer K.; Keller, Jason M. & Seedahmed, Gamal H.
System: The UNT Digital Library
S. 219: The National Employee Savings and Trust Equity Guarantee Act (open access)

S. 219: The National Employee Savings and Trust Equity Guarantee Act

On July 26, 2005, the Senate Finance Committee approved S. 219, the “National Employee Savings and Trust Equity Guarantee (NESTEG) Act of 2005,” a bill to reform federal pension laws. This report summarizes the major provisions of the bill, as approved by the Committee.
Date: August 12, 2005
Creator: Purcell, Patrick J.
System: The UNT Digital Library
527 Political Organizations: Legislation in the 109th Congress (open access)

527 Political Organizations: Legislation in the 109th Congress

The 109th Congress is examining the role of groups organized under section of the Internal Revenue Code(IRC) that are involved in federal elections, but are not operating under the requirements and restrictions of federal election law.
Date: June 20, 2005
Creator: Cantor, Joseph E.
System: The UNT Digital Library
S. 852: The Fairness in Asbestos Injury Resolution Act of 2005 (open access)

S. 852: The Fairness in Asbestos Injury Resolution Act of 2005

From Summary: "This report provides an overview of S. 852, the Fairness in Asbestos Injury Resolution (FAIR) Act of 2005. The bill would largely remove asbestos claims from the courts in favor of the administrative process set out in the bill. The bill would establish the Office of Asbestos Disease Compensation to award damages to asbestos claimants on a no-fault basis from the Asbestos Injury Claims Resolution Fund."
Date: April 26, 2005
Creator: Brooks, Nathan
System: The UNT Digital Library
915-MHz Radar Wind Profiler (915RWP) Handbook (open access)

915-MHz Radar Wind Profiler (915RWP) Handbook

The 915 MHz radar wind profiler/radio acoustic sounding system (RWP/RASS) measures wind profiles and backscattered signal strength between (nominally) 0.1 km and 5 km and virtual temperature profiles between 0.1 km and 2.5 km. It operates by transmitting electromagnetic energy into the atmosphere and measuring the strength and frequency of backscattered energy. Virtual temperatures are recovered by transmitting an acoustic signal vertically and measuring the electromagnetic energy scattered from the acoustic wavefront. Because the propagation speed of the acoustic wave is proportional to the square root of the virtual temperature of the air, the virtual temperature can be recovered by measuring the Doppler shift of the scattered electromagnetic wave.
Date: January 1, 2005
Creator: Coulter, R.
System: The UNT Digital Library
S. 1783: The Pension Security and Transparency Act of 2005 (open access)

S. 1783: The Pension Security and Transparency Act of 2005

From Summary: "This report summarizes the major provisions of S. 1783, the Pension Security and Transparency Act 2005. The bill combines provisions of S. 219, the National Employee Savings and Trust Equity Guarantee Act, reported by the Finance Committee, and the Defined Benefit Security Act, reported by the Committee on Health, Education, Labor, and Pensions."
Date: October 18, 2005
Creator: Purcell, Patrick
System: The UNT Digital Library
S. 1783: The Pension Security and Transparency Act of 2005 (open access)

S. 1783: The Pension Security and Transparency Act of 2005

On September 28, the Senate Finance Committee and the Senate Committee on Health, Education, Labor, and Pensions announced that they had reached a compromise on a pension reform bill for consideration by the full Senate. The compromise bill has been introduced as S. 1783, “The Pension Security and Transparency Act of 2005.” S. 1783 combines provisions of S. 219, “The National Employee Savings and Trust Equity Guarantee Act,” reported by the Finance Committee, and “The Defined Benefit Security Act,” reported by the Committee on Health, Education, Labor, and Pensions. This report summarizes the major provisions of the compromise bill, as announced by the chairmen and ranking members of the two committees.
Date: October 3, 2005
Creator: Purcell, Patrick J.
System: The UNT Digital Library
1K RESERVOIR: EB WELDER, CE69412 REQUALIFICATION (open access)

1K RESERVOIR: EB WELDER, CE69412 REQUALIFICATION

The EB Welder was qualified to produce the 1K retainer weld in February 2001. Since that time, several parts were replaced and metallography results from a review indicated that the welder was not operating properly. After testing the EB Welder, it was requalified to produce the 1K retainer weld.
Date: September 7, 2005
Creator: Schell, J. H.
System: The UNT Digital Library
2004 Annual Health Physics Report for the HEU Transparency Program (open access)

2004 Annual Health Physics Report for the HEU Transparency Program

During the 2004 calendar year, LLNL provided health physics support for the Highly Enriched Uranium Transparency Implementation Program (HEU-TIP) in external and internal radiation protection and technical expertise into matters related to BDMS radioactive sources and Russian radiation safety regulatory compliance. For the calendar year 2004, there were 200 person-trips that required dose monitoring of the U.S. monitors. Of the 200 person-trips, 183 person-trips were SMVs and 17 person-trips were Transparency Monitoring Office (TMO) trips. Eight person-trips from the SMV trips were continuation trips of TMO monitors to facilities other than UEIP. The LLNL Safety Laboratories' Division provided the dosimetry services for the HEU-TIP monitors.
Date: April 1, 2005
Creator: Radev, R
System: The UNT Digital Library
2004 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada (open access)

2004 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (Bechtel Nevada, 2000) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs) for each of the facilities, and reports the results in an annual summary report to the U.S. Department of Energy Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (U.S. Department of Energy [DOE]). The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office performed annual reviews in fiscal year (FY) 2004 by evaluating operational factors and research results that impact the continuing validity of the PA and CA results. This annual summary report presents data and conclusions from the FY 2004 review, and determines the adequacy of the PAs and CAs. Operational factors, such as the waste form and containers, facility design, waste receipts, closure plans, as well as monitoring results and research and development (R&D) activities were reviewed …
Date: January 1, 2005
Creator: Yucel, Vefa
System: The UNT Digital Library