Month

38 Matching Results

Results open in a new window/tab.

10 (micro)m and 5 (micro)m Pinhole-Assisted Point-Projection Backlit Imaging for NIF (open access)

10 (micro)m and 5 (micro)m Pinhole-Assisted Point-Projection Backlit Imaging for NIF

Pinhole-assisted point-projection backlighting with 10{micro}m and 5 {micro}m pinholes placed a small distance of order 1 mm away from the backlighter produces images with large field of view and high resolution. Pinholes placed closely to high-power backlighter sources can vaporize and close due to x-ray driven ablation, thereby limiting the usefulness of this method. A study of streaked 1-D backlit imaging of 25 {micro}m W wires using the OMEGA laser is presented. The pinhole closure timescale for 10 {micro}m pinholes placed 0.45 mm and 1 mm distant from the backlighter is 1.3 ns and 2.2 ns, respectively. Similar timescales for 5 {micro}m pinholes is also presented. Successful wire imaging prior to pinhole closure is clearly demonstrated.
Date: June 5, 2001
Creator: Bullock, A. B.; Landen, O. L. & Bradley, D. K.
Object Type: Article
System: The UNT Digital Library
Acquisition of Leased Space for the U.S. Patent and Trademark Office (open access)

Acquisition of Leased Space for the U.S. Patent and Trademark Office

Correspondence issued by the General Accounting Office with an abstract that begins "This report reviews the data, assumptions, and conclusions reached by the General Services Administration (GSA) and the Patent and Trademark Office (PTO) on the acquisition of about two million square feet of leased space for the consolidation of PTO activities. This build-to-suit lease, valued at approximately $1.2 billion over its 20-year term, was signed in June 2000. this report responds to allegations and questions from two public interest groups about the PTO lease acquisition. One public interest group alleged that during the procurement process for the lease (1) GSA improperly awarded the lease to an offeror who had not complied with the solicitation's stated requirements, (2) GSA failed to compete the construction of the interior finishes phase of the project as required by law, and (3) GSA used an illegal cost-plus-a-percentage-of-cost contract. The second public interest group asked (1) whether the requirements in GSA's Solicitation for Offers for the PTO lease transformed the lease from an operating lease to a capital lease under Office of Management and Budget (OMB) Circular A-11; (2) whether the new facility will be able to house all PTO employees and contractors throughout the …
Date: June 5, 2001
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Altus Times (Altus, Okla.), Vol. 102, No. 71, Ed. 1 Tuesday, June 5, 2001 (open access)

Altus Times (Altus, Okla.), Vol. 102, No. 71, Ed. 1 Tuesday, June 5, 2001

Daily newspaper from Altus, Oklahoma that includes local, state, and national news along with advertising.
Date: June 5, 2001
Creator: Bush, Michael
Object Type: Newspaper
System: The Gateway to Oklahoma History
Automated Test System for NIF Flashlamps (open access)

Automated Test System for NIF Flashlamps

This paper describes design and operation of the flashlamp test system, used to evaluate the primary laser flashlamps on the National Ignition Facility (NIF) at the Lawrence Livermore National Laboratory (LLNL) in Livermore, California. The tester delivers repetitive high voltage pulses to a series pair of flashlamps at levels closely simulating those encountered in normal operation. Each lamp pair is subjected to a pre-ionization and main pulse shot sequence, with two minute intervals between shots. This capability allows the manufacturer to test and evaluate the flashlamps for infant mortality and longevity before delivery to NIF. All operations are under computer control with fully automated test and data acquisition capabilities requiring minimal operator input. The system is designed to operate continuously. Typical pre-ionization and main pulse outputs are: (1) Pre-ionization Pulse--V{sub chg} = 27kV, I{sub peak} = 3kA, E = 2.4kJ; Pulse Width--(10%-90%) - 200us; Main Pulse--V{sub chg} = 23kV, I{sub peak} - 24kA, E - 78.6kJ; and Pulse Width--(10%-90%) - 350us.
Date: June 5, 2001
Creator: da Silva, T; Creely, P; Hammon, J; Shaw, R; Boyle, R T & Fulkerson, E S
Object Type: Article
System: The UNT Digital Library
Automatic Extraction of Closed Pixel Clusters for Target Cueing in Hyperspectral Images (open access)

Automatic Extraction of Closed Pixel Clusters for Target Cueing in Hyperspectral Images

Traditional algorithms for automatic target cueing (ATC) in hyperspectral images, such as the RX algorithm, treat anomaly detection as a simple hypothesis testing problem. Each decision threshold gives rise to a different set of anomalous pixels. The clustered Rx algorithm generates target cues by grouping anomalous pixels into spatial clusters, and retaining only those clusters that satisfy target specific spatial constraints. It produces one set of target cues for each of several decision thresholds, and conservatively requires {Omicron}(K{sup 2}) operations per pixel, where K is the number of spectral bands (which varies from hundreds to thousands in hyperspectral images). A novel ATC algorithm, known as ''Pixel Cluster Cueing'' (PCC), is discussed. PCC groups pixels into clusters based on spectral similarity and spatial proximity, and then selects only those clusters that satisfy target-specific spatial constraints as target cues. PCC requires only {Omicron}(K) operations per pixel, and it produces only one set of target cues because it is not an anomaly detection algorithm, i.e., it does not use a decision threshold to classify individual pixels as anomalies. PCC is compared both computationally and statistically to the RX algorithm.
Date: June 5, 2001
Creator: Paglieroni, D W & Perkins, D E
Object Type: Article
System: The UNT Digital Library
The Baytown Sun (Baytown, Tex.), Vol. 79, No. 191, Ed. 1 Tuesday, June 5, 2001 (open access)

The Baytown Sun (Baytown, Tex.), Vol. 79, No. 191, Ed. 1 Tuesday, June 5, 2001

Daily newspaper from Baytown, Texas that includes local, state, and national news along with advertising.
Date: June 5, 2001
Creator: Cash, Wanda Garner
Object Type: Newspaper
System: The Portal to Texas History
The Boerne Star (Boerne, Tex.), Vol. 96, No. 45, Ed. 1 Tuesday, June 5, 2001 (open access)

The Boerne Star (Boerne, Tex.), Vol. 96, No. 45, Ed. 1 Tuesday, June 5, 2001

Semiweekly newspaper from Boerne, Texas that includes local, state, and national news along with advertising.
Date: June 5, 2001
Creator: Keasling, Edna
Object Type: Newspaper
System: The Portal to Texas History
Brady Standard-Herald and Heart O' Texas News (Brady, Tex.), Ed. 1 Tuesday, June 5, 2001 (open access)

Brady Standard-Herald and Heart O' Texas News (Brady, Tex.), Ed. 1 Tuesday, June 5, 2001

Semiweekly newspaper from Brady, Texas that includes local, state, and national news along with advertising.
Date: June 5, 2001
Creator: Stewart, James E.
Object Type: Newspaper
System: The Portal to Texas History
Congo (formerly Zaire) (open access)

Congo (formerly Zaire)

This report discusses the Democratic Republic of the Congo, formerly Zaire, which is a vast-resource-rich country of 48 million people. Events there affect much of sub-Saharan Africa. In August 1998, Congo was plunged into its second civil war in 2 years. A peace accord was concluded in Lusaka, Zambia, in July and August 1999, and the U.N. Security Council later agreed to send a 5,500-member observer force, MONUC, to assist in the peace process. Fewer than 250 observers have gone to Congo, due to the failure of the parties to the Lusaka accord to fully implement its terms. The assassination of President Laurent Kabila on January 16, 2001, has raised new doubts about the prospects for peace in Congo.
Date: June 5, 2001
Creator: Copson, Raymond W.
Object Type: Report
System: The UNT Digital Library
Customs Service Modernization: Results of Review of First Automated Commercial Environment Expenditure Plan (open access)

Customs Service Modernization: Results of Review of First Automated Commercial Environment Expenditure Plan

A letter report issued by the General Accounting Office with an abstract that begins "This report discusses the U.S. Custom Service's expenditure plan for its Automated Commercial Environment System (ACE). GAO found that (1) Customs' expenditure plan satisfies the legislative conditions specified in the 2001 Consolidated Appropriations Act, (2) activities described in the plan are consistent with GAO's two open recommendations regarding the need for Customs to justify and make ACE investment decisions incrementally and strengthen ACE software acquisition management, and (3) there are two areas needing improvement. Customs has not adequately justified investing in the International Trade Data System (ITDS) pilot project parallel with, and separate from, planned ITDS efforts under ACE modernization. Also, Customs has defined conflicting roles and responsibilities for its independent verification and validation (IV&V) contractor."
Date: June 5, 2001
Creator: United States. General Accounting Office.
Object Type: Report
System: The UNT Digital Library
Daily Journal (Perry, Okla.), Vol. [108], No. [110], Ed. 1 Tuesday, June 5, 2001 (open access)

Daily Journal (Perry, Okla.), Vol. [108], No. [110], Ed. 1 Tuesday, June 5, 2001

Daily newspaper from Perry, Oklahoma that includes local, state, and national news along with advertising.
Date: June 5, 2001
Creator: Brown, Gloria
Object Type: Newspaper
System: The Gateway to Oklahoma History
DART Names New VP, Asst. VP For Diversity and Economic Opportunity Department (open access)

DART Names New VP, Asst. VP For Diversity and Economic Opportunity Department

News release about the appointment of two officers in DART's Department of Economic Opportunity.
Date: June 5, 2001
Creator: Lyons, Morgan
Object Type: Text
System: The Portal to Texas History
Depleted uranium hexafluoride management program : data compilation for the K-25 site. (open access)

Depleted uranium hexafluoride management program : data compilation for the K-25 site.

This report is a compilation of data and analyses for the K-25 site on the Oak Ridge Reservation, Oak Ridge, Tennessee. The data were collected and the analyses were done in support of the U.S. Department of Energy (DOE) 1999 Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride (DOE/EIS-0269). The report describes the affected environment at the K-25 site and summarizes the potential environmental impacts that could result from continued cylinder storage and preparation of cylinders for shipment at the site. It is probable that the cylinders at the K-25 site will be shipped to another site for conversion. Because conversion and long-term storage of the entire inventory at the K-25 site are highly unlikely, these data are not presented in this report. DOE's preferred alternative is to begin converting the depleted uranium hexafluoride inventory as soon as possible to either uranium oxide, uranium metal, or a combination of both, while allowing for use of as much of this inventory as possible.
Date: June 5, 2001
Creator: Hartmann, H. M.
Object Type: Report
System: The UNT Digital Library
Depleted uranium hexafluoride management program : data compilation for the Portsmouth site. (open access)

Depleted uranium hexafluoride management program : data compilation for the Portsmouth site.

This report is a compilation of data and analyses for the Portsmouth site, near Portsmouth, Ohio. The data were collected and the analyses were done in support of the U.S. Department of Energy (DOE) 1999 Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride (DOE/EIS-0269). The report describes the affected environment at the Portsmouth site and summarizes potential environmental impacts that could result from conducting the following depleted uranium hexafluoride (UF{sub 6}) management activities at the site: continued cylinder storage, preparation of cylinders for shipment, conversion, and long-term storage. DOE's preferred alternative is to begin converting the depleted UF{sub 6} inventory as soon as possible to either uranium oxide, uranium metal, or a combination of both, while allowing for use of as much of this inventory as possible.
Date: June 5, 2001
Creator: Hartmann, H. M.
Object Type: Report
System: The UNT Digital Library
The Express-Star (Chickasha, Okla.), Ed. 1 Tuesday, June 5, 2001 (open access)

The Express-Star (Chickasha, Okla.), Ed. 1 Tuesday, June 5, 2001

Daily newspaper from Chickasha, Oklahoma that includes local, state, and national news along with advertising.
Date: June 5, 2001
Creator: Bush, Kent
Object Type: Newspaper
System: The Gateway to Oklahoma History
The Gender Wage Gap and Pay Equity: Is Comparable Worth the Next Step? (open access)

The Gender Wage Gap and Pay Equity: Is Comparable Worth the Next Step?

This report mainly focuses on The Gender Wage Gap and Pay Equity. Women's participation in the labor market has undergone considerable change in the last few decades. The majority of today's married women have forsaken the traditional role of full time child care givers for the dual role of unpaid homemakers.
Date: June 5, 2001
Creator: Levine, Linda
Object Type: Report
System: The UNT Digital Library
The Gender Wage Gap and Pay Equity: Is Comparable Worth the Next Step? (open access)

The Gender Wage Gap and Pay Equity: Is Comparable Worth the Next Step?

This report mainly focuses on The Gender Wage Gap and Pay Equity. Women's participation in the labor market has undergone considerable change in the last few decades. The majority of today's married women have forsaken the traditional role of full time child care givers for the dual role of unpaid homemakers.
Date: June 5, 2001
Creator: Levine, Linda
Object Type: Report
System: The UNT Digital Library
Insulated Concrete Homes Increase Durability and Energy Efficiency (open access)

Insulated Concrete Homes Increase Durability and Energy Efficiency

New houses designed by Mercedes Homes in Melbourne, Florida, with technical support from the U.S. Department of Energy's Building America Program, save their homeowners money by using energy efficient features such as a high performance heat pump and solar control glazing to reduce cooling costs.
Date: June 5, 2001
Creator: America, Building; Hendron, B. & Poole, L.
Object Type: Book
System: The UNT Digital Library
Manganin Gauge and Reactive Flow Modeling Study of the Shock Initiation of PBX 9501 (open access)

Manganin Gauge and Reactive Flow Modeling Study of the Shock Initiation of PBX 9501

A series of 101mm diameter gas gun experiments was fired using manganin pressure gauges embedded in the HMX-based explosive PBX 9501 at initial temperatures of 20 C and 50 C. Flyer plate impact velocities were chosen to produce impact pressure levels in PBX 9501 at which the growth of explosive reaction preceding detonation was measured on most of the gauges and detonation pressure profiles were recorded on some of the gauges placed deepest into the explosive targets. All measured pressure histories for initial temperatures of 25 C and 50 C were essentially identical. Measured run distances to detonation at several input shock pressures agreed with previous results. An existing ignition and growth reactive flow computer model for shock initiation and detonation of PBX 9501, which was developed based on LANL embedded particle velocity gauge data, was tested on these pressure gauge results. The agreement was excellent, indicating that the embedded pressure and particle velocity gauge techniques yielded consistent results.
Date: June 5, 2001
Creator: Tarver, C M; Forbes, J W; Garcia, F & Urtiew, P A
Object Type: Article
System: The UNT Digital Library
Modeling The Effect of Drifts on the Edge, Scrape-Off Layer, and Divertor Plasma in DIII-D (open access)

Modeling The Effect of Drifts on the Edge, Scrape-Off Layer, and Divertor Plasma in DIII-D

Simulations of plasmas with a DIII-D shape indicate plasma drifts are important at power levels near the L- to H-mode plasma transition. In addition to enhancing plasma flows in the divertor region, drifts are found to play a key role in establishing highly sheared radial electric fields in the edge of the confined plasma, for the physics of the high confinement operating mode (H-mode). Measurements of the plasma structure in the vicinity of the X-point of DIII-D indicate the importance of drifts on plasma flow between the scrape-off layer (SOL) and closed field lines. The large electric fields provide large flows around the X-point, and these are conjectured to play a role in the transition from L- to H-mode confinement. These results indicate the relevance of modeling the edge and SOL plasmas of present tokamak devices using models which include E x B, {del}B, and pressure gradient drifts. The results of simulation of specific DIII-D discharges is reported in this paper. They start with discussion of the simulation of an Ohmic discharge in Section 2, including a study of the effect of varying several operational parameters. Simulation of a higher triangularity L-mode discharge is discussed in Section, and a summary …
Date: June 5, 2001
Creator: Porter, G. D.; Boedo, J. A.; Groebner, R. J.; Carlstrom, T. N.; Rognlien, T. D.; Rensink, M. E. et al.
Object Type: Article
System: The UNT Digital Library
A New Technique for Troubleshooting Large Capacitive Energy Storage Banks (open access)

A New Technique for Troubleshooting Large Capacitive Energy Storage Banks

The Power Conditioning System (PCS) of the National Ignition Facility (NIF) like many pulse power systems relies on large numbers of inductively isolated high voltage capacitors configured in parallel for energy storage. When an energy storage capacitor fails in such a capacitor bank, there is often little or no external indication showing which capacitor failed. Identifying the failed component can be a time consuming and potentially hazardous operation. Conventional methods using capacitance meters require that each capacitor be disconnected and tested independently. They have developed a new non-invasive technique (i.e. no dismantling of the bank is required) that greatly improves personnel safety as well reducing troubleshooting time.
Date: June 5, 2001
Creator: Fulkerson, S E & Hammon, J
Object Type: Article
System: The UNT Digital Library
NIF Power Conditioning System Testing at LLNL (open access)

NIF Power Conditioning System Testing at LLNL

The National Ignition Facility (NIF) is now under construction at the Lawrence Livermore National Laboratory (LLNL). The Power Conditioning System (PCS) for NIF, when completed will consist of a 192 nearly identical 2 megajoule capacitor storage banks driving 7680 two meter long flashlamps. A fully integrated single-module test facility was completed in August of 2000 at LLNL. The purpose to the Test Facility is to conduct Reliability and Maintainability (RAM) testing of a true ''First Article'' system (built to the final drawing package as opposed to a prototype). The test facility can be fired once every ten minutes with a total peak output current of 580kA with a pulse width of 400us. To date over 4000 full power shots have been conducted at this facility.
Date: June 5, 2001
Creator: Fulkerson, E S; Newton, M; Hulsey, s; Hammon, J & Moore, W
Object Type: Article
System: The UNT Digital Library
The Oklahoma Daily (Norman, Okla.), Vol. 84, No. 159, Ed. 1 Tuesday, June 5, 2001 (open access)

The Oklahoma Daily (Norman, Okla.), Vol. 84, No. 159, Ed. 1 Tuesday, June 5, 2001

Student newspaper of the University of Oklahoma in Norman, Oklahoma that includes national, local, and campus news along with advertising.
Date: June 5, 2001
Creator: Mangieri, Bryan
Object Type: Newspaper
System: The Gateway to Oklahoma History
An overview of the Argonne National Laboratory fast critical experiments 1963-1990. (open access)

An overview of the Argonne National Laboratory fast critical experiments 1963-1990.

None
Date: June 5, 2001
Creator: LeSage, L.G.
Object Type: Report
System: The UNT Digital Library