303-K Storage Facility report on FY98 closure activities (open access)

303-K Storage Facility report on FY98 closure activities

This report summarizes and evaluates the decontamination activities, sampling activities, and sample analysis performed in support of the closure of the 303-K Storage Facility. The evaluation is based on the validated data included in the data validation package (98-EAP-346) for the 303-K Storage Facility. The results of this evaluation will be used for assessing contamination for the purpose of closing the 303-K Storage Facility as described in the 303-K Storage Facility Closure Plan, DOE/RL-90-04. The closure strategy for the 303-K Storage Facility is to decontaminate the interior of the north half of the 303-K Building to remove known or suspected dangerous waste contamination, to sample the interior concrete and exterior soils for the constituents of concern, and then to perform data analysis, with an evaluation to determine if the closure activities and data meet the closure criteria. The closure criteria for the 303-K Storage Facility is that the concentrations of constituents of concern are not present above the cleanup levels. Based on the evaluation of the decontamination activities, sampling activities, and sample data, determination has been made that the soils at the 303-K Storage Facility meet the cleanup performance standards (WMH 1997) and can be clean closed. The evaluation determined …
Date: July 17, 1998
Creator: Adler, J. G.
Object Type: Report
System: The UNT Digital Library
324/327 facilities environmental effluent specifications (open access)

324/327 facilities environmental effluent specifications

These effluent technical specifications address requirements for the 324/327 facilities, which are undergoing stabilization activities. Effluent technical specifications are imposed to protect personnel, the environment and the public, by ensuring adequate implementation and compliance with federal and state regulatory requirements and Hanford programs.
Date: October 29, 1998
Creator: JOHNSON, D.L.
Object Type: Report
System: The UNT Digital Library
324 and 327 essential drawing list (open access)

324 and 327 essential drawing list

The purpose of this document is to publish a list of essential drawings for the 324 and 327 Facilities. The report consists of a list of engineering drawings, not the drawings themselves.
Date: May 21, 1998
Creator: Spencer, R. H.
Object Type: Report
System: The UNT Digital Library
324 Building fire hazards analysis implementation plan (open access)

324 Building fire hazards analysis implementation plan

In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the …
Date: September 16, 1998
Creator: Eggen, C.D.
Object Type: Report
System: The UNT Digital Library
324 Building liquid waste handling and removal system project plan (open access)

324 Building liquid waste handling and removal system project plan

This report evaluates the modification options for handling radiological liquid waste generated during decontamination and cleanout of the 324 Building. Recent discussions indicate that the Hanford site railroad system will be closed by the end of FY 1998 necessitating the need for an alternate transfer method. The issue of handling of Radioactive Liquid Waste (RLW) from the 324 Building (assuming the 340 Facility is not available to accept the RLW) has been examined in at least two earlier engineering studies (Parsons 1997a and Hobart 1997). Each study identified a similar preferred alternative that included modifying the 324 Building RLWS to allow load-out of wastewater to a truck tanker, while making maximum use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes to the building. This alternative is accepted as the basis for further discussion presented in this study. The goal of this engineering study is to verify the path forward presented in the previous studies and assure that the selected alternative satisfies the 324 Building deactivation goals and objectives as currently described in the project management plan. This study will also evaluate options available to implement the preferred alternative and select the preferred option …
Date: July 29, 1998
Creator: Ham, J.E.
Object Type: Report
System: The UNT Digital Library
324 Building radiochemical engineering cells, high-level vault, low-level vault, and associated areas closure plan (open access)

324 Building radiochemical engineering cells, high-level vault, low-level vault, and associated areas closure plan

The Hanford Site, located adjacent to and north of Richland, Washington, is operated by the US Department of Energy, Richland Operations Office (RL). The 324 Building is located in the 300 Area of the Hanford Site. The 324 Building was constructed in the 1960s to support materials and chemical process research and development activities ranging from laboratory/bench-scale studies to full engineering-scale pilot plant demonstrations. In the mid-1990s, it was determined that dangerous waste and waste residues were being stored for greater than 90 days in the 324 Building Radiochemical Engineering Cells (REC) and in the High-Level Vault/Low-Level Vault (HLV/LLV) tanks. [These areas are not Resource Conservation and Recovery Act of 1976 (RCRA) permitted portions of the 324 Building.] Through the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-89, agreement was reached to close the nonpermitted RCRA unit in the 324 Building. This closure plan, managed under TPA Milestone M-20-55, addresses the identified building areas targeted by the Tri-Party Agreement and provides commitments to achieve the highest degree of compliance practicable, given the special technical difficulties of managing mixed waste that contains high-activity radioactive materials, and the physical limitations of working remotely in the areas within the subject …
Date: March 25, 1998
Creator: Barnett, J. M.
Object Type: Report
System: The UNT Digital Library
324 Building special-case waste assessment in support of the 324 Building closure (TPA milestone M-89-05) (open access)

324 Building special-case waste assessment in support of the 324 Building closure (TPA milestone M-89-05)

Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05 requires US Department of Energy, Richland Operations Office to complete a 324 Building Special Case Waste Assessment in Support of the 324 Building Closure. This document has been prepared with the intent of meeting this regulatory commitment. Alternatives for the Special Case Wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel.
Date: May 12, 1998
Creator: Hobart, R.L.
Object Type: Report
System: The UNT Digital Library
324 Facility B-cell quality process plan (open access)

324 Facility B-cell quality process plan

Quality Process Plan for the Restart of Cell Hot-Work. Addition of Table 4.
Date: October 27, 1998
Creator: Carlson, J. L.
Object Type: Report
System: The UNT Digital Library
324 Facility B-cell quality process plan (open access)

324 Facility B-cell quality process plan

Quality Process Plan for the Restart of Cell Hot-Work. Addition of Table 5B.
Date: November 24, 1998
Creator: RIDDELLE, J.G.
Object Type: Report
System: The UNT Digital Library
324 Facility B-cell quality process plan (open access)

324 Facility B-cell quality process plan

Quality Process Plan for the Restart of Cell Hot-Work. Addition of Table 5a.
Date: October 27, 1998
Creator: RIDDELLE, J.G.
Object Type: Report
System: The UNT Digital Library
324 Facility B-Cell quality process plan (open access)

324 Facility B-Cell quality process plan

This report documents the quality process plan for the restart of a hot cell in the B Plant, originally a bismuth phosphate processing facility, but later converted to a waste fractionation plant. B-Cell is currently being cleaned out and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/1999. This report describes the major activities that remain for completion of the TPA milestone.
Date: March 12, 1998
Creator: Carlson, J. L.
Object Type: Report
System: The UNT Digital Library
324 Facility B-cell quality process plan (open access)

324 Facility B-cell quality process plan

B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. These include: Size Reduce Tank 119 and Miscellaneous Equipment; Load and Ship Low-Level Waste; Remove and Size Reduce the 1B Rack; Collect Dispersible Material from Cell Floor; Remove and Size Reduce the 2A Rack; Size Reduce the 1A Rack; Load and Ship Mixed Waste to PUREX Tunnels; and Move Spent Fuel to A-Cell;
Date: July 29, 1998
Creator: Carlson, J.L.
Object Type: Report
System: The UNT Digital Library
324 Facility B-Cell quality process plan (open access)

324 Facility B-Cell quality process plan

B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. These include: Size Reduce Tank 119 and Miscellaneous Equipment; Load and Ship Low-Level Waste; Remove and Size Reduce the 1B Rack; Collect Dispersible Material from Cell Floor; Remove and Size Reduce the 2A Rack; Size Reduce the 1A Rack; Load and Ship Mixed Waste to PUREX Tunnels; and Move Spent Fuel to A-Cell;
Date: April 29, 1998
Creator: Carlson, J.L.
Object Type: Report
System: The UNT Digital Library
324 Facility B-cell quality process plan (open access)

324 Facility B-cell quality process plan

Quality Process Plan for the Restart of Cell Hot-Work. Addition of Table 6a.
Date: November 24, 1998
Creator: RIDDELLE, J.G.
Object Type: Report
System: The UNT Digital Library
324 Facility B-Cell quality process plan (open access)

324 Facility B-Cell quality process plan

B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. This includes: (1) Size Reduce Tank 119 and Miscellaneous Equipment. This activity is the restart of hotwork in B-Cell to size reduce the remainder of Tank 119 and other miscellaneous pieces of equipment into sizes that can be loaded into a grout container. This activity also includes the process of preparing the containers for shipment from the cell. The specific activities and procedures used are detailed in a table. (2) Load and Ship Low-Level Waste. This activity covers the process of taking a grouted LLW container from B-Cell and loading it into the cask in the REC airlock and Cask Handling Area (CHA) for shipment to the LLBG. The detailed activities and procedures for this part of cell cleanout are included in second table.
Date: June 10, 1998
Creator: Carlson, J.L.
Object Type: Report
System: The UNT Digital Library
324 Facility special-case waste assessment in support of 324 closure (TPA milestone M-89-05) (open access)

324 Facility special-case waste assessment in support of 324 closure (TPA milestone M-89-05)

Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05, requires US Department of Energy, Richland Operations Office to complete a 324 Facility Special-Case Waste Assessment in Support of 324 Closure. This document, HNF-1270, has been prepared with the intent of meeting this regulatory commitment. Alternatives for the special-case wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel.
Date: June 25, 1998
Creator: Hobart, R. L.
Object Type: Report
System: The UNT Digital Library
327 Building fire hazards analysis implementation plan (open access)

327 Building fire hazards analysis implementation plan

In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7.
Date: September 16, 1998
Creator: Eggen, C.D.
Object Type: Report
System: The UNT Digital Library
327 Building liquid waste handling options modification project plan (open access)

327 Building liquid waste handling options modification project plan

This report evaluates the modification options for handling radiological liquid waste (RLW) generated during decontamination and cleanout of the 327 Building. The overall objective of the 327 Facility Stabilization Project is to establish a passively safe and environmentally secure configuration of the 327 Facility. The issue of handling of RLW from the 327 Facility (assuming the 34O Facility is not available to accept the RLW) has been conceptually examined in at least two earlier engineering studies (Parsons 1997a and Hobart l997). Each study identified a similar preferred alternative that included modifying the 327 Facility RLWS handling systems to provide a truck load-out station, either within the confines of the facility or exterior to the facility. The alternatives also maximized the use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes. An issue discussed in each study involved the anticipated volume of the RLW stream. Estimates ranged between 113,550 and 387,500 liters in the earlier studies. During the development of the 324/327 Building Stabilization/Deactivation Project Management Plan, the lower estimate of approximately 113,550 liters was confirmed and has been adopted as the baseline for the 327 Facility RLW stream. The goal of this engineering study …
Date: March 28, 1998
Creator: Ham, J.E.
Object Type: Report
System: The UNT Digital Library
327 legacy waste processing plan (open access)

327 legacy waste processing plan

The B and W Hanford Company`s (BWHC) 327 Facility [Postirradiation Testing Laboratory (PTL)] houses 10 hot cells in which a variety of postirradiation examinations have been performed since its construction in the mid 1950s. Over the years, the waste that was generated in these cells has been collected in one gallon buckets. These buckets are essentially one gallon cylindrical cans made of thin wall stainless steel with welded bottoms and slip fit lids. They contain assorted compactable waste (i.e., Wipe-Alls, Q-tips, towels, etc.) as well as non-compactable waste (i.e., small tools, pieces of metal tubing, etc.). There is a FY-98 BWHC Performance Agreement (PA) milestone in place to package 200 of these buckets in drums and ship them from the 327 facility to the Central Waste Complex (CWC) by September 30, 1998.
Date: May 5, 1998
Creator: Henderson, J. F.
Object Type: Report
System: The UNT Digital Library
327 SNF fuel return to K-Basin quality process plan (open access)

327 SNF fuel return to K-Basin quality process plan

The B and W Hanford Company`s (BWHC) 327 Facility, in the 300 Area of the Hanford Site, contains Spent Nuclear Fuel (SNF) single fuel element canisters (SFEC) and fuel remnant canisters (FRC) which are to be returned to K-Basin. Seven shipments of up to six fuel canisters will be loaded into the CNS 1-13G Cask and transported to 105-KE.
Date: September 22, 1998
Creator: Ham, J. E.
Object Type: Report
System: The UNT Digital Library
327 to 324 Pin tube shipment quality management process plan (open access)

327 to 324 Pin tube shipment quality management process plan

The B and W Hanford Company's (BWHC) 327 Facility, in the 300 Area of the Hanford Site, is preparing to ship five Pin Tubes to the 324 Facility for storage and eventual disposition. The Pin Tubes consist of legacy fuel pin pieces and drillings. They will be over-packed in new Pin Tubes and transported to 324 in three shipments. Once received at 324, two of the shipments will be combined for storage as a fissionable material batch, and the other shipment will be added to an existing batch.
Date: November 5, 1998
Creator: HAM, J.E.
Object Type: Report
System: The UNT Digital Library
340 Facility emergency preparedness hazards assessment (open access)

340 Facility emergency preparedness hazards assessment

This document establishes the technical basis in support of Emergency Planning activities for the 340 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone, is demonstrated.
Date: November 25, 1998
Creator: CAMPBELL, L.R.
Object Type: Report
System: The UNT Digital Library
340 waste handling complex: Deactivation project management plan (open access)

340 waste handling complex: Deactivation project management plan

This document provides an overview of the strategy for deactivating the 340 Waste Handling Complex within Hanford`s 300 Area. The plan covers the period from the pending September 30, 1998 cessation of voluntary radioactive liquid waste (RLW) transfers to the 340 Complex, until such time that those portions of the 340 Complex that remain active beyond September 30, 1998, specifically, the Retention Process Sewer (RPS), can also be shut down and deactivated. Specific activities are detailed and divided into two phases. Phase 1 ends in 2001 after the core RLW systems have been deactivated. Phase 2 covers the subsequent interim surveillance of deactivated and stand-by components during the period of continued RPS operation, through the final transfer of the entire 340 Complex to the Environmental Restoration Contractor. One of several possible scenarios was postulated and developed as a budget and schedule planning case.
Date: June 25, 1998
Creator: Stordeur, R.T.
Object Type: Report
System: The UNT Digital Library
500 MW Demonstration of Advanced Wall-Fired Combustion Techniques for the Reduction of Nitrogen Oxide (NOx) Emissions from Coal-Fired Boilers (open access)

500 MW Demonstration of Advanced Wall-Fired Combustion Techniques for the Reduction of Nitrogen Oxide (NOx) Emissions from Coal-Fired Boilers

This report presents the results of a US Department of Energy Clean Coal Technology project demonstrating advanced wall-fired combustion techniques for the reduction of nitrogen oxide emissions from coal-fired boilers.
Date: September 1998
Creator: unknown
Object Type: Report
System: The UNT Digital Library