Evaluation of near field rock treatment during constructions (LADSfeature #22) (open access)

Evaluation of near field rock treatment during constructions (LADSfeature #22)

The purpose of this report is to evaluate the effect of near-field rock treatment by injection of reactive material (calcite) above the drift for the purpose of decreasing postclosure drift seepage. The method used for the calculation was a coupled reaction-transport numerical model for gas-water-rock interaction. This includes the mass conservation of heat, liquid and gas for thermohydrological calculations, of aqueous and gaseous species for advective and diffusive transport, and the kinetics of mineral-water reactions.
Date: November 24, 1998
Creator: Sonnenthal, Eric & Spycher, Nicolas
Object Type: Report
System: The UNT Digital Library
Hanford business structure for HANDI 2000 business management system (open access)

Hanford business structure for HANDI 2000 business management system

The Hanford Business Structure integrates the project`s technical, schedule, and cost baselines; implements the use of a standard code of accounts; and streamlines performance reporting and cost collection. Technical requirements drive the technical functions and come from the RDD 100 database. The functions will be identified in the P3 scheduling system and also in the PeopleSoft system. Projects will break their work down from the technical requirements in the P3 schedules. When the level at which they want to track cost via the code of accounts is reached, a Project ID will be generated in the PeopleSoft system. P3 may carry more detailed schedules below the Project ID level. The standard code of accounts will identify discrete work activities done across the site and various projects. They will include direct and overhead type work scopes. Activities in P3 will roll up to this standard code of accounts. The field that will be used to record this in PeopleSoft is ``Activity``. In Passport it is a user-defined field. It will have to be added to other feeder systems. Project ID and code of accounts are required fields on all cost records.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Labor costing for HANDI 2000 business management system (open access)

Labor costing for HANDI 2000 business management system

Costing labor in the Financial Data System has traditionally been done using standard rates based on type of employee by organization. This methodology will change with the implementation of the PeopleSoft financial system. Labor in the new environment will be cost against actual dollars and marked up with an employee adder, to cover absences and fringe benefits.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Savings plan payment process for HANDI 2000 business management system (open access)

Savings plan payment process for HANDI 2000 business management system

The sitewide savings system week feeds Putnam detailed employee information. Once Putnam validates the feed, Treasure executes and electronic funds transfer to Putnam.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Hanford Site waste minimization and pollution prevention awareness program plan (open access)

Hanford Site waste minimization and pollution prevention awareness program plan

This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site`s pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office`s (RL`s) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program.
Date: September 24, 1998
Creator: Place, B. G.
Object Type: Report
System: The UNT Digital Library
Fixed assets accounting for HANDI 2000 business management system (open access)

Fixed assets accounting for HANDI 2000 business management system

All fixed assets used by the Project Hanford Management Contract are normally acquired or built using capital funding. Replacement Property Record Units (PRUS) may be expense funded and tracked and capitalized upon installation. A specific Department of Energy capitalization policy is followed.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Inventory processes for HANDI 2000 business management system (open access)

Inventory processes for HANDI 2000 business management system

Inventory records are maintained in the following inventory systems: HIP, (Spare Parts), WIM, (General Supplies): Convenient Storage, Shop Stock, Essential Materials, Special Tools, ESP (Excess Inventory). Requisitions for replenishment of inventory items are initiated in the respective inventory system and then forwarded to the purchasing system.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Invoice/disc as for HANDI 2000 business management system (open access)

Invoice/disc as for HANDI 2000 business management system

Fluor Daniel Hanford provides a hard copy invoice to DOE-RL summarizing the cost incurred, all cost accruals, and cost accrual reversals, and transfers. A disc invoice file is also submitted to RL which is backup to the hard copy. The file format is consistent with guidance provided by RL Financial Management Division. Cost, accrual and reversal amount will be reported by the codes identified in the Distribution of Obligations Report issued by the Contracting Officer.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
DOE Hanford request for services for HANDI 2000 business management system (open access)

DOE Hanford request for services for HANDI 2000 business management system

This work includes services provided by PHMC which are defined by DOE-RL with support from FDH Accounting. Services include: Site wide information system support; Site infrastructure including occupancy; Utilities; Fleet services; Printing and reproduction services; Training; Supplies and material, etc.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
TWRS phase 1 infrastructure project (W-519) characterization (open access)

TWRS phase 1 infrastructure project (W-519) characterization

In order to treat the mixed radioactive and hazardous waste stored in 177 underground tanks, the Tank Waste Remediation System (TWRS) program is developing a `demonstration` site for treatment and immobilization of these wastes by a private contractor. Project W-519 is providing the infrastructure support to this site by developing the designs and emplacing required pipelines, roads, electrical, etc. In support of the TWRS Phase 1 Infrastructure Project (W-519) Characterization, Numatec Hanford Corporation (NHC) contracted with Waste Management Federal Services, Inc., Northwest Operations (WMNW) to investigate a number of locations in and just outside the 200 East Area eastern fenceline boundary. These areas consisted of known or suspected waste lines or waste sites that could potentially impact the construction and emplacement of the proposed facility improvements, including waterlines and roads. These sites were all located subsurface and sugaring would be required to obtain sample material from the desired depth. The soils would then be sampled and submitted to the laboratory for analysis of radioactivity.
Date: September 24, 1998
Creator: Mitchell, C. J.
Object Type: Report
System: The UNT Digital Library
Passport-PeopleSoft integration for HANDI 2000 business management system (open access)

Passport-PeopleSoft integration for HANDI 2000 business management system

The integration between the PeopleSoft applications and Passport modules are accomplished with an off the shelf package developed by lNDUS. The product was updated to the PeopleSoft Release 7.O. The Integration product interacts with data from multiple products within Passport and PeopleSoft. For 10/l/98 the Integration will interlace between the following: (1) PassPort Accounts Payable, Contract Management, Inventory Management, Purchasing; and (2) PeopleSoft General Ledger, Project Costing, Human Resources, Payroll. The current supply systems and financial systems interact with each other via multiple custom interfaces. Data integrity and Y2K issues were some of the driving factors in replacement of these systems. The new systems allow FDH the opportunity to change the current business processes to go to a best business practice that the commercial off the shelf software was adopted.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
GL chart of accounts maintenance for HANDI 2000 business management system (open access)

GL chart of accounts maintenance for HANDI 2000 business management system

The chart of accounts is reviewed and compared to DOE annually. The Accounting Group identifies and processes necessary changes at this time. Sub-accounts are added on a monthly basis to track new funding sources.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Work performed by Enterprise Companies (Enco) for (PHMC) for HANDI 2000 business management system (open access)

Work performed by Enterprise Companies (Enco) for (PHMC) for HANDI 2000 business management system

Enterprise Companies are affiliated for the Prime and Major Subcontractors on site at Hanford. Business with them is handled and recorded in a manner very similar to working with independent vendors. In the to-be environment, all procurement of services from Enco`s will be processed in the Passport Procurement System.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Fit gap analysis for HANDI 2000 business management system (open access)

Fit gap analysis for HANDI 2000 business management system

The purpose of the Fit Gap Analysis sessions was to identify any significant functional gaps with PeopleSoft Financial as it relates to the business requirements of Fluor Daniel Hanford (FDH). To that end, a series of prototyping sessions were held with members of the core team and subject matter experts, where functionality and test cases were discussed. Test cases were developed for PeopleSoft Projects and General Ledger and run through the data processing model.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Unit billed services for HANDI 2000 business management system (open access)

Unit billed services for HANDI 2000 business management system

Unit billed services are those services provided internally by project to other projects, except for those services furnished by Lockheed Martin Services,Inc., an Enterprise Company. These services are billed when the actual work is performed, based on a published rate for the service. Examples of this would be crane and rigging, duplicating, or lab analysis. The providers of these services collect their costs in a pool. The pool is then liquidated by the billings.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
OTS cash disbursement process for HANDI 2000 business management system (open access)

OTS cash disbursement process for HANDI 2000 business management system

Payments by check are disbursed either through the payroll system or the Accounts Payable Master. Payments to persons with a valid employee number are processed through the payroll system. Payments to persons without valid employee number are processed through APM.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Travel expense reimbursement for HANDI 2000 business management system (open access)

Travel expense reimbursement for HANDI 2000 business management system

The Travel and Treasury departments use the Operations Travel System to process business travel expenses and cash receipts. OTS feeds the payment information to either the payroll or payables system. ITS then feeds the cost information to Financial Data System.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Funds control for HANDI 2000 business management system (open access)

Funds control for HANDI 2000 business management system

Per contract modification between the Department of Energy Richland Operations Office (DOE-RL) and FDH. FDH must capture, control and monitor costs based on control points dictate in the Management Contract.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Cash receipts process for HANDI 2000 business management system (open access)

Cash receipts process for HANDI 2000 business management system

All Fluor Daniel Hanford cash receipts are processed in the Operations Travel System. There are five types of cash receipts. Depending on the type, the receipt may be processed by APM OTS, Site-Wide Savings, retirement Information System, or PeopleSoft Benefits System. Regardless of the source, all cash received is eventually forwarded to Treasure for deposit into the bank.
Date: August 24, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Expression of Autoactivated Stromelysin-1 in Mammary Glands of Transgenic Mice Leads to a Reactive Stroma During Early Development (open access)

Expression of Autoactivated Stromelysin-1 in Mammary Glands of Transgenic Mice Leads to a Reactive Stroma During Early Development

Extracellular matrix and extracellular matrix-degrading matrix metalloproteinases play a key role in interactions between the epithelium and the mesenchyme during mammary gland development and disease. In patients with breast cancer, the mammary mesenchyme undergoes a stromal reaction, the etiology of which is unknown. We previously showed that targeting of an autoactivating mutant of the matrix metalloproteinase stromelysin-1 to mammary epithelia of transgenic mice resulted in reduced mammary function during pregnancy and development of preneoplastic and neoplastic lesions. Here we examine the cascade of alterations before breast tumor formation in the mammary gland stroma once the expression of the stromelysin-1 transgene commences. Beginning in postpubertal virgin animals, low levels of transgene expression in mammary epithelia led to increased expression of endogenous stromelysin-1 in stromal fibroblasts and up-regulation of other matrix metalloproteinases, without basement membrane disruption. These changes were accompanied by the progressive development of a compensatory reactive stroma, characterized by increased collagen content and vascularization in glands from virgin mice. This remodeling of the gland affected epithelial-mesenchymal communication as indicated by inappropriate expression of tenascin-C starting by day 6 of pregnancy. This, together with increased transgene expression, led to basement membrane disruption starting by day 15 of pregnancy. We propose that …
Date: April 24, 1998
Creator: Thomasset, N.; Lochter, A.; Sympson, C.J.; Lund, L.R.; Williams, D.R.; Behrendtsen, O. et al.
Object Type: Article
System: The UNT Digital Library
Start-up plan for the first NIF laser bundle: transition from single beamlet prototype to 192-beamline laser facility (open access)

Start-up plan for the first NIF laser bundle: transition from single beamlet prototype to 192-beamline laser facility

The compact multi-pass laser design and the extensive use of optical component assemblies as line replaceable units (LRU) are essential to achieve the cost efficiency of the National Ignition Facility design. These design philosophies require a new approach to start-up operation of the NIF 192-beam-line high-energy laser compared to existing fusion laser facilities. The limited access to the beam-line optics and the limited on-line verification and maintenance capability require that extensive component verification and alignment take place in off-line facilities before the LRUÕs are installed in the laser structure. We are developing a detailed plan for the start-up of the NIF facility. This plan includes systematic off-line component and LRU verification tests, LRU installation and prealignment, and sub-system acceptance tests, followed by a well defined set of operational test procedures to verify integrated performance. During integrated performance testing laser performance parameters of individual beam lines will be verified using a precision diagnostic system located in the NIF switchyard. If additional on-line calibration or performance testing is required, the LRU based architecture can accommodate the insertion of specialized in-line diagnostic LRUs at locations that require such additional testing during start-up. Multiple beam focal spot characteristics on disk targets in the NIF …
Date: September 24, 1998
Creator: Lane, M A; Speck, D R; Tiszauer, D & Von Wonterghem, B
Object Type: Article
System: The UNT Digital Library
324 Facility B-cell quality process plan (open access)

324 Facility B-cell quality process plan

Quality Process Plan for the Restart of Cell Hot-Work. Addition of Table 5B.
Date: November 24, 1998
Creator: RIDDELLE, J.G.
Object Type: Report
System: The UNT Digital Library
The DOE2000 materials microcharacterization collaboratory. (open access)

The DOE2000 materials microcharacterization collaboratory.

The Materials Microcharacterization Collaborator (MMC) was created last year as a pilot project within the US Department of Energy's DOE2000 program [1]. The DOE2000 program has, as its main goals, to develop improved capabilities for solving DOE's complex scientific problems, to increase DOE's R and D productivity and efficiency, and to enhance the access of R and D partners to DOE resources. One of the strategies to meet these goals is the establishment of national collaboratories to provide access via the Internet to unique or expensive DOE research facilities and to expertise for remote collaboration, experimentation, production, software development, modeling, and measurement. In addition, collaboratories will benefit researchers by providing tools for video conferencing, shared data-viewing, and collaborative analysis. Cooperative pilots projects, jointly funded by DOE2000 and a scientific program area, are expected to lead to significant scientific achievements by developing new capabilities and increasing the efficiency of doing the work (e.g., by reducing travel, increasing communication, and promoting the sharing of data among formerly disparate research groups). The MMC project unites four DOE BES electron microscopy user centers located at ANL, LBNL, ORNL and the University of Illinois with the DOE EE center located at ORNL. Also included in …
Date: April 24, 1998
Creator: Voelkl, E.
Object Type: Article
System: The UNT Digital Library
Electromagnetic cold-test characterization of the quad-driven stripline kicker (open access)

Electromagnetic cold-test characterization of the quad-driven stripline kicker

The first kicker concept design for beam deflection was constructed to allow stripline plates to be driven; thus directing, or kicking, the electron beam into two subsequent beam lines. This quad-driven stripline kicker is an eight port electromagnetic network and consists of two actively driven plates and two terminated plates. Electromagnetic measurements performed on the bi-kicker [2] and quad-kicker were designed to determine: (1) the quality of the fabrication of the kicker, including component alignments; (2) quantification of the input feed transition regions from the input coax to the driven kicker plates; (3) identification of properties of the kicker itself without involving the effects of the electron beam; (4) coupling between a line current source and the plates of the kicker; and (5) the effects on the driven current to simulate an electron beam through the body of the kicker. Included in this are the angular variations inside the kicker to examine modal distributions. The goal of the simulated beam was to allow curved path and changing radius studies to be performed electromagnetically. The cold test results produced were then incorporated into beam models.
Date: August 24, 1998
Creator: Dunlap, J E & Nelson, S D
Object Type: Article
System: The UNT Digital Library