Numerical analysis of thermal-hydrological conditions in thesingle heater test at Yucca Mountain (open access)

Numerical analysis of thermal-hydrological conditions in thesingle heater test at Yucca Mountain

The Single Heater Test (SHT) is one of two in-situ thermal tests included in the site characterization program for the potential underground nuclear waste repository at Yucca Mountain. The heating phase of the SHT started in August 1996, and was completed in May 1997 after 9 months of heating. The coupled processes in the unsaturated fractured rock mass around the heater were monitored by numerous sensors for thermal, hydrological, mechanical and chemical data. In addition to passive monitoring, active testing of the rock mass moisture content was performed using geophysical methods and air injection testing. The extensive data set available from this test gives a unique opportunity to improve the understanding of the thermal-hydrological situation in the natural setting of the repository rocks. The present paper focuses on the 3-D numerical simulation of the thermal-hydrological processes in the SHT using TOUGH2. In the comparative analysis, they are particularly interested in the accuracy of different fracture-matrix-interaction concepts such as the Effective Continuum (ECM), the Dual Continuum (DKM), and the Multiple Interacting Continua (MINC) method.
Date: August 8, 1998
Creator: Birkholzer, Jens T. & Tsang, Yvonne W.
System: The UNT Digital Library
LAB3 Cosmic Ray Test Stand Analysis of Steel Stack Supports (open access)

LAB3 Cosmic Ray Test Stand Analysis of Steel Stack Supports

A cosmic ray test stand is being constructed at Lab 3. The stand consists of two stacks of steel plates one resting on top of the other. The top stack is composed of 6 plates of steel making an overall stack size of 34.5-inch x 40-inch x 99-inch. The bottom stack also has 6 layers of plate making an overall size of approximately 49.5-inch x 82-inch x 99-inch. The bottom stack is supported with three support legs. See drawing 3823.000ME-900428 for the individual plate orientation. The minimum support leg size and necessary welds between plates are determined.
Date: May 8, 1998
Creator: Cease, H.
System: The UNT Digital Library
Tank waste remediation system systems engineering management plan (open access)

Tank waste remediation system systems engineering management plan

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.
Date: January 8, 1998
Creator: Peck, L. G.
System: The UNT Digital Library
Tank waste remediation system configuration management plan (open access)

Tank waste remediation system configuration management plan

The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of …
Date: January 8, 1998
Creator: Vann, J. M.
System: The UNT Digital Library
105-K Basin material design basis feed description for spent nuclear fuel project facilities (open access)

105-K Basin material design basis feed description for spent nuclear fuel project facilities

Revisions 0 and 0A of this document provided estimated chemical and radionuclide inventories of spent nuclear fuel and sludge currently stored within the Hanford Site`s 105-K Basins. This Revision (Rev. 1) incorporates the following changes into Revision 0A: (1) updates the tables to reflect: improved cross section data, a decision to use accountability data as the basis for total Pu, a corrected methodology for selection of the heat generation basis fee, and a revised decay date; (2) adds section 3.3.3.1 to expand the description of the approach used to calculate the inventory values and explain why that approach yields conservative results; (3) changes the pre-irradiation braze beryllium value.
Date: January 8, 1998
Creator: Praga, A. N.
System: The UNT Digital Library
Computer software configuration description, 241-AY and 241-AZ tank farm MICON automation system (open access)

Computer software configuration description, 241-AY and 241-AZ tank farm MICON automation system

This document describes the configuration process, choices and conventions used during the configuration activities, and issues involved in making changes to the configuration. Includes the master listings of the Tag definitions, which should be revised to authorize any changes. Revision 2 incorporates minor changes to ensure the document setpoints accurately reflect limits (including exhaust stack flow of 800 scfm) established in OSD-T-151-00019. The MICON DCS software controls and monitors the instrumentation and equipment associated with plant systems and processes.
Date: January 8, 1998
Creator: Winkelman, W. D.
System: The UNT Digital Library
LAB 3 Cleanroom Fan and Filters Analysis for the Supports (open access)

LAB 3 Cleanroom Fan and Filters Analysis for the Supports

A 1400 lb blower fan and a 2700 lb filter box are to be supported at Lab 3. The support structure is a framework that suspends from the building wall to the cleanroom and to a washroom. The framework is made of welded 4-inch x 8-inch x 1/4-inch rectangular A36 steel tube. Welds are to be standard prequalified welds as by AISC. The main support frame is approximately 7-feet off the floor and welded onto the top of 10 columns. A deflection and stress study was performed on the planned structure. A scaled plan view is given in drawing 3823.113-MD-358764. The heaviest loaded beams were labeled with a letter designation and were studied for beam deflections and stresses. The 4-inch x 8-inch rectangular tube was also used for the substructure for the fan and filter mounts and to support a temporary floor grating during maintenance.
Date: May 8, 1998
Creator: Cease, H.
System: The UNT Digital Library
The Effects of Site Characterization Activities on the Abundance of Ravens (Corvus corax) in the Yucca Mountain Area (open access)

The Effects of Site Characterization Activities on the Abundance of Ravens (Corvus corax) in the Yucca Mountain Area

In response to the Nuclear Waste Policy Act of 1982 and the Nuclear Waste Policy Amendments Act of 1987, the U.S. Department of Energy (DOE) developed and is implementing the Yucca Mountain Site Characterization Project. Raven abundance was measured from August 1991 through August 1995 along treatment and control routes to evaluate whether site characterization activities resulted in increased raven abundance at Yucca Mountain. This study fulfills the requirement set forth in the incidental take provisions of the Biological Opinion that DOE monitor the abundance of ravens at Yucca Mountain. Ravens were more abundant at Yucca Mountain than in the control area, and raven abundance in both areas increased over time. However, the magnitude of differences between Yucca Mountain and control surveys did not change over time, indicating that the increase in raven abundance observed during this study was not related to site characterization activities. Increases over time on both Yucca Mountain and control routes are consistent with increases in raven abundance in the Mojave Desert reported by the annual Breeding Bird Survey of the US. Fish and Wildlife Service. Evidence from the Desert Tortoise Monitoring Program at Yucca Mountain suggests that ravens are not a significant predator of small …
Date: May 8, 1998
Creator: Lederle, P.E.
System: The UNT Digital Library
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2 (open access)

Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.
Date: October 8, 1998
Creator: GRYGIEL, M.L.
System: The UNT Digital Library
ICF quarterly report October-December 1998 volume 8, number 1 (open access)

ICF quarterly report October-December 1998 volume 8, number 1

This issue of the ICF Quarterly Report focuses on the final section of the 192-arm, 1.8-MJ National Ignition Facility (NIF). We describe both technological advances necessary for optimal utilization of the delivered energy and the hohlraum physics resulting from extremely high energy densities. Two articles belong to the first category. The conversion of infrared light to ultraviolet occurs at the tripler in the NIF's Final Optics Assembly. It is then necessary to separate any unconverted (first- and second-harmonic) light from the tripled-frequency light passed to the target. Large-Aperture Color-Separation Gratings for Diverting Unconverted Light Away from the NIF Target describes the design and fabrication of novel diffraction gratings that fulfill this function. In both direct- and indirect-drive ICF, the symmetry of the capsule as it compresses is crucial. The NIF will have 48 clusters of four beams incident on targets. Optimization of Beam Angles for the National Ignition Facility (p. 15) presents the rationale used to assign beam angles for cylindrical indirect drive while still allowing direct-drive and tetrahedral indirect-drive experiments to be performed.
Date: September 8, 1998
Creator: Feit, M
System: The UNT Digital Library
Basin Analysis of the Mississippi Interior Salt Basin and Petroleum System Modeling of the Jurassic Smackover Formation, Eastern Gulf Coastal Plain (open access)

Basin Analysis of the Mississippi Interior Salt Basin and Petroleum System Modeling of the Jurassic Smackover Formation, Eastern Gulf Coastal Plain

The objective is to provide a comprehensive geologic analysis of the Mississippi Interior Salt Basin.
Date: April 8, 1998
Creator: Mancini, Ernest A.
System: The UNT Digital Library
National Ignition Facility start-up/operations engineering and special equipment construction health and safety plan (open access)

National Ignition Facility start-up/operations engineering and special equipment construction health and safety plan

This document sets forth the responsibilities, interfaces, guidelines, rules, policy, and regulations for all workers involved in the S/O and SE construction, installation, and acceptance testing. This document is enforced from the first day that S/O and SE workers set foot on the NIF construction site until the end of the Project at Critical Decision 4. This document is applicable only to site activities, which are defined as those that occur within the perimeter of the fenced-off NIF construction zone and the Target Chamber Assembly Area (Helipad). The associated Special Equipment laydown and construction support areas listed in Appendix B are not under this plan; their safety provisions are discussed in the Appendix. Prototype and other support activities, such as the Amplifier Laboratory and Frame Assembly Unit assembly area, are not included in this plan. After completion of the Operational Readiness Review, the Facility Safety Procedure, Operational Safety Requirements, and Operational Safety Procedures are the governing safety documents for the operating facility. The S/O and SE project elements are required to implement measures that create a universal awareness of and promote safe job practices at the site. This includes all Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory, Sandia …
Date: May 8, 1998
Creator: Huddleston, P. C.
System: The UNT Digital Library
Logistic Regression Applied to Seismic Discrimination (open access)

Logistic Regression Applied to Seismic Discrimination

The usefulness of logistic discrimination was examined in an effort to learn how it performs in a regional seismic setting. Logistic discrimination provides an easily understood method, works with user-defined models and few assumptions about the population distributions, and handles both continuous and discrete data. Seismic event measurements from a data set compiled by Los Alamos National Laboratory (LANL) of Chinese events recorded at station WMQ were used in this demonstration study. PNNL applied logistic regression techniques to the data. All possible combinations of the Lg and Pg measurements were tried, and a best-fit logistic model was created. The best combination of Lg and Pg frequencies for predicting the source of a seismic event (earthquake or explosion) used Lg{sub 3.0-6.0} and Pg{sub 3.0-6.0} as the predictor variables. A cross-validation test was run, which showed that this model was able to correctly predict 99.7% earthquakes and 98.0% explosions for this given data set. Two other models were identified that used Pg and Lg measurements from the 1.5 to 3.0 Hz frequency range. Although these other models did a good job of correctly predicting the earthquakes, they were not as effective at predicting the explosions. Two possible biases were discovered which affect …
Date: October 8, 1998
Creator: Amindan, BG & Hagedorn, DN
System: The UNT Digital Library
Energy and power characteristics of Li-ion cells (open access)

Energy and power characteristics of Li-ion cells

At Sandia National Laboratories the authors are evaluating the energy and power characteristics of commercially available Li-ion cells. Cells of several different sizes (20 Ah, 1.1 Ah, 0.750 Ah and {approximately}0.5 Ah) and geometries (cylindrical and prismatic) from several manufacturers were studied. The cells were pulsed discharged at increasing currents (50 mA to 1,000 mA) over a range of temperatures (+35 C to {minus}40 C) and at different states of charge (4.1 V, open circuit voltage (OCV), fully charged, 3.6 V OCV partially discharged and 3.1 V OCV nearly discharged) and the voltage drop was recorded. The voltage drop was small at ambient and near ambient temperatures indicating that the total cell internal impedance was small under these conditions. However, at {minus} 40 C the voltage drop was significant due to an increase in the cell internal impedance. At a given temperature, the voltage drop increases with decreasing state-of-charge (SOC) or OCV. The cell impedance and other electrochemical properties as a function of temperature and SOC were also measured. The Ragone data indicate that the specific power and specific energy of Li-ion cells of different sizes are comparable and therefore scaling up to {approximately}20 Ah does not affect either the …
Date: June 8, 1998
Creator: Nagasubramanian, G.; Jungst, R. G.; Ingersoll, D.; Doughty, D. H.; Radzykewycz, D. & Hill, C.
System: The UNT Digital Library
Corrective Action Decision Document for Corrective Action Unit 340: Pesticide Release sites, Nevada Test Site, Nevada (open access)

Corrective Action Decision Document for Corrective Action Unit 340: Pesticide Release sites, Nevada Test Site, Nevada

This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.
Date: December 8, 1998
Creator: United States. Department of Energy. Nevada Operations Office.
System: The UNT Digital Library
Tank waste remediation system technical baseline summary description (open access)

Tank waste remediation system technical baseline summary description

This document is one of the tools used to develop and control the mission work as depicted in the included figure. This Technical Baseline Summary Description document is the top-level tool for management of the Technical Baseline for waste storage operations.
Date: January 8, 1998
Creator: Raymond, R.E.
System: The UNT Digital Library
Tank waste remediation system retrieval and disposal mission waste feed delivery plan (open access)

Tank waste remediation system retrieval and disposal mission waste feed delivery plan

This document is a plan presenting the objectives, organization, and management and technical approaches for the Waste Feed Delivery (WFD) Program. This WFD Plan focuses on the Tank Waste Remediation System (TWRS) Project`s Waste Retrieval and Disposal Mission.
Date: January 8, 1998
Creator: Potter, R.D.
System: The UNT Digital Library
Project W-314 specific test and evaluation plan 241-AN-B valve pit (open access)

Project W-314 specific test and evaluation plan 241-AN-B valve pit

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).
Date: April 8, 1998
Creator: Hays, W.H.
System: The UNT Digital Library
Tank waste remediation system retrieval and disposal mission infrastructure plan (open access)

Tank waste remediation system retrieval and disposal mission infrastructure plan

This system plan presents the objectives, organization, and management and technical approaches for the Infrastructure Program. This Infrastructure Plan focuses on the Tank Waste Remediation System (TWRS) Project`s Retrieval and Disposal Mission.
Date: January 8, 1998
Creator: Root, R.W.
System: The UNT Digital Library
Electric power research institute environmental control technology center report to the steering committee (open access)

Electric power research institute environmental control technology center report to the steering committee

Operations and maintenance continued this month at the Electric Power Research Institute`s (EPRI`s) Environmental Control Technology Center (ECTC). Testing for the month involved the Dry Sorbent Injection (DST) test block with the Carbon Injection System. The 1.0 MW Cold- Side Selective Catalytic Reduction (SCR) unit, the 0.4 MW Mini- Pilot Wet Scrubber, and the 4.0 MW Pilot Wet Scrubber remained idle this month in a cold-standby mode and were inspected regularly. These units remain available for testing as future project work is identified.
Date: August 8, 1998
Creator: unknown
System: The UNT Digital Library
Early-time measurements of laser-plasma conditions in OMEGA-upgrade ICF targets. Final report, April 1, 1998--January 31, 1999 (open access)

Early-time measurements of laser-plasma conditions in OMEGA-upgrade ICF targets. Final report, April 1, 1998--January 31, 1999

All of the experimental results from OMEGA shots described here are from CY-1998 experiments under an (extended) FY-98 grant. This research involves fielding at LLE their two flat-field euv spectrographs in the 30--250 {angstrom} range, mainly utilizing on one o them a gated stripline microchannel plate as a time-resolved detector, with photographic recording. The experimental layout for the 1998 experiments is shown. During the week beginning May 3, 1998, the authors obtained 24 data shots over 4 days, and fielded both the time-gated extreme ultraviolet (euv) spectrograph mounted external to the target chamber, as well as their newly-constructed TIM-mounted euv spectrograph mounted closer to the target with time-integrated photographic recording on a trial basis. They also had available the LLE/LLNL streak x-ray spectrograph and x-ray imaging cameras. In this series, the first two shots appeared from the x-ray streak spectra to be normal in the sense that the spectral line emissions from the two coatings sequenced beginning with magnesium followed by aluminum as the coatings were vaporized. Unfortunately, on the following shots in this campaign it became increasingly apparent that conditions had changed radically, and later analyses showed that x-ray spectra lines from the deep aluminum undercoating appeared initially along …
Date: February 8, 1998
Creator: Griem, H. R. & Elton, R. C.
System: The UNT Digital Library
Tank waste remediation system retrieval and disposal mission authorization basis amendment task plan (open access)

Tank waste remediation system retrieval and disposal mission authorization basis amendment task plan

This task plan is a documented agreement between Nuclear Safety and Licensing and the Process Development group within the Waste Feed Delivery organization. The purpose of this task plan is to identify the scope of work, tasks and deliverables, responsibilities, manpower, and schedules associated with an authorization basis amendment as a result of the Waste Feed Waste Delivery Program, Project W-211, and Project W-TBD.
Date: January 8, 1998
Creator: Goetz, T.G.
System: The UNT Digital Library
Speech coding (open access)

Speech coding

Speech is the predominant means of communication between human beings and since the invention of the telephone by Alexander Graham Bell in 1876, speech services have remained to be the core service in almost all telecommunication systems. Original analog methods of telephony had the disadvantage of speech signal getting corrupted by noise, cross-talk and distortion Long haul transmissions which use repeaters to compensate for the loss in signal strength on transmission links also increase the associated noise and distortion. On the other hand digital transmission is relatively immune to noise, cross-talk and distortion primarily because of the capability to faithfully regenerate digital signal at each repeater purely based on a binary decision. Hence end-to-end performance of the digital link essentially becomes independent of the length and operating frequency bands of the link Hence from a transmission point of view digital transmission has been the preferred approach due to its higher immunity to noise. The need to carry digital speech became extremely important from a service provision point of view as well. Modem requirements have introduced the need for robust, flexible and secure services that can carry a multitude of signal types (such as voice, data and video) without a fundamental …
Date: May 8, 1998
Creator: Ravishankar, C., Hughes Network Systems, Germantown, MD
System: The UNT Digital Library
Development of Syringe/Bottle Hybrids for Sampling Slurries (open access)

Development of Syringe/Bottle Hybrids for Sampling Slurries

A convenient and effective sample bottle system based on simple modifications of disposable plastic syringes and bottles has been devised and tested for slurry samples. Syringe/ bottle hybrids (hereafter referred to as syringe bottles) have the convenience of regular flat-bottom bottles with screw cap closures. In addition, the syringe imparts a sliding and adjustable bottom to the bottle that forces the entire contents from the bottle. The system was designed especially to collect samples for high temperature work-ups of DWPF slurry samples. The syringe bottles together with fixed-bottom sample vial inserts would provide the DWPF with convenient and reliable methods for dealing with slurry samples.
Date: January 8, 1998
Creator: Coleman, C.J.
System: The UNT Digital Library