3 Matching Results

Results open in a new window/tab.

North Central Corridor LRT Extension: Draft Environmental Impact Statement - appendix D: Draft Preliminary Engineering Plan and Profile Drawings (open access)

North Central Corridor LRT Extension: Draft Environmental Impact Statement - appendix D: Draft Preliminary Engineering Plan and Profile Drawings

Appendix D to the Draft Environmental Statement for the North Central Corridor light rail transit (LRT) extension. It contains maps and drawing drawing made during the preliminary engineering process.
Date: October 1996
Creator: Dallas Area Rapid Transit
Object Type: Report
System: The Portal to Texas History

Right of Way and Track Map Houston & Texas Central R.R. Operated by the T. And N.O.R.R.CO. Main Line

Rail corridor right of way and track map from station 15655+28 to station 15866+48 between McKinney and Collin County, Texas. Highlights estimated sale area. Schedules are included on map. Scale 1'':400'.
Date: May 15, 1996
Creator: unknown
Object Type: Map
System: The Portal to Texas History
Locally Preferred Alternative Report: Northeast Corridor Major Investment Study (open access)

Locally Preferred Alternative Report: Northeast Corridor Major Investment Study

This study was conducted to determine the most cost-effective transportation investment for the Northwest Corridor. It outlines existing transportation problems and summarizes the alternative designs considered to address these problems. It documents the selection of the locally preferred alternative (LPA) design. The report is intended to inform the preliminary engineering and environmental assessment stage of development.
Date: March 28, 1996
Creator: BRW Inc.
Object Type: Report
System: The Portal to Texas History