1 Matching Results

Results open in a new window/tab.

Finding of No Significant Impact, Proposed Remediation of the Maybell Uranium Mill Processing Site, Maybell, Colorado (open access)

Finding of No Significant Impact, Proposed Remediation of the Maybell Uranium Mill Processing Site, Maybell, Colorado

The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-0347) on the proposed surface remediation of the Maybell uranium mill processing site in Moffat County, Colorado. The mill site contains radioactively contaminated materials from processing uranium ore that would be stabilized in place at the existing tailings pile location. Based on the analysis in the EA, DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, Public Law 91-190 (42 U.S.C. {section}4321 et seq.), as amended. Therefore, preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).
Date: December 31, 1995
Creator: unknown
System: The UNT Digital Library