3 Matching Results

Results open in a new window/tab.

Economic Impact Study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State Fiscal Year 1994. Revision 1 (open access)

Economic Impact Study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State Fiscal Year 1994. Revision 1

The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.
Date: December 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison Umtra Project Site, Gunnison, Colorado. Revision 1 (open access)

Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison Umtra Project Site, Gunnison, Colorado. Revision 1

The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).
Date: December 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Preparedness to Counsel HIV-Positive Clients: a Survey of Practitioners (open access)

Preparedness to Counsel HIV-Positive Clients: a Survey of Practitioners

This purpose of this study was to investigate and examine the attitudes of therapists who treat HIV-positive (HIV+) clients. Specifically, therapists' perceptions of their own preparedness in dealing with specific issues and emotions of HIV+ clients were examined. Also, therapists' evaluation of their own efficacy of specific therapeutic approaches with HIV+ clients was examined. These therapists' perceptions and evaluations of all their clients in general were compared to their HIV+ clients. Comparisons were also made within the two groups.
Date: December 1994
Creator: Rowe, Christina J. (Christina Jo)
Object Type: Thesis or Dissertation
System: The UNT Digital Library