9 Matching Results

Results open in a new window/tab.

Enlargement in Central Europe (open access)

Enlargement in Central Europe

In December 1994, NATO members will begin the process of debating possible criteria for new members from Central Europe. Alliance relations with Russia will be a central factor determining the outcome of the debate.
Date: November 10, 1994
Creator: Gallis, Paul E.
System: The UNT Digital Library
Functional design criteria for Project W-252, Phase II Liquid Effluent Treatment and Disposal: Revision 1 (open access)

Functional design criteria for Project W-252, Phase II Liquid Effluent Treatment and Disposal: Revision 1

This document provides the functional design criteria required for the Phase 2 Liquid Effluent Treatment and Disposal Project, Project W-252. Project W-252 shall provide new facilities and existing facility modifications required to implement Best Available Technology/All Known, Available, and Reasonable Methods of Prevention, Control, and Treatment (BAT/AKART) for the 200 East Phase II Liquid Effluent Streams. The project will also provide a 200 East Area Phase II Effluent Collection System (PTECS) for connection to a disposal system for relevant effluent streams to which BAT/AKART has been applied. Liquid wastestreams generated in the 200 East Area are currently discharged to the soil column. Included in these wastestreams are cooling water, steam condensate, raw water, and sanitary wastewaters. It is the policy of the DOE that the use of soil columns to treat and retain radionuclides and nonradioactive contaminants be discontinued at the earliest practical time in favor of wastewater treatment and waste minimization. In 1989, the DOE entered into an interagency agreement with Ecology and EPA. This agreement is referred to as the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Project W-252 is one of the projects required to achieve the milestones set forth in the Tri-Party Agreement. One …
Date: November 10, 1994
Creator: Hatch, C. E.
System: The UNT Digital Library
Radioisotope thermoelectric generator transportation system subsystem 143 software development plan (open access)

Radioisotope thermoelectric generator transportation system subsystem 143 software development plan

None
Date: November 10, 1994
Creator: King, D. A.
System: The UNT Digital Library
Radioisotope thermoelectric generator transportation system subsystem 143 software development plan (open access)

Radioisotope thermoelectric generator transportation system subsystem 143 software development plan

This plan describes the activities to be performed and the controls to be applied to the process of specifying, developing, and qualifying the data acquisition software for the Radioisotope Thermoelectric Generator (RTG) Transportation System Subsystem 143 Instrumentation and Data Acquisition System (IDAS). This plan will serve as a software quality assurance plan, a verification and validation (V and V) plan, and a configuration management plan.
Date: November 10, 1994
Creator: King, D.A.
System: The UNT Digital Library
Multi-Function Waste Tank Facility thermal hydraulic analysis for Title II design (open access)

Multi-Function Waste Tank Facility thermal hydraulic analysis for Title II design

The purpose of this work was to provide the thermal hydraulic analysis for the Multi-Function Waste Tank Facility (MWTF) Title II design. Temperature distributions throughout the tank structure were calculated for subsequent use in the structural analysis and in the safety evaluation. Calculated temperatures of critical areas were compared to design allowables. Expected operating parameters were calculated for use in the ventilation system design and in the environmental impact documentation. The design requirements were obtained from the MWTF Functional Design Criteria (FDC). The most restrictive temperature limit given in the FDC is the 200 limit for the haunch and dome steel and concrete. The temperature limit for the rest of the primary and secondary tanks and concrete base mat and supporting pad is 250 F. Also, the waste should not be allowed to boil. The tank geometry was taken from ICF Kaiser Engineers Hanford drawing ES-W236A-Z1, Revision 1, included here in Appendix B. Heat removal rates by evaporation from the waste surface were obtained from experimental data. It is concluded that the MWTF tank cooling system will meet the design temperature limits for the design heat load of 700,000 Btu/h, even if cooling flow is lost to the annulus region, …
Date: November 10, 1994
Creator: Cramer, E. R.
System: The UNT Digital Library
Analysis report for 241-BY-104 Auger samples (open access)

Analysis report for 241-BY-104 Auger samples

This report describes the analysis of the surface crust samples taken from single-shell tank (SST) BY-104, suspected of containing ferrocyanide wastes. This sampling and analysis will assist in ascertaining whether there is any hazard due to combustion (burning) or explosion of these solid wastes. These characteristics are important to future efforts to characterize the salt and sludge in this type of waste tank. This report will outline the methodology and detail the results of analyses performed during the characterization of this material. All analyses were performed by Westinghouse Hanford Company at the 222-S laboratory unless stated otherwise.
Date: November 10, 1994
Creator: Beck, M. A.
System: The UNT Digital Library
Design basis and requirements for 241-SY modular exhauster mechanical installation (open access)

Design basis and requirements for 241-SY modular exhauster mechanical installation

A new ventilation system is being installed to serve as the K-1 primary exhauster. The existing K-1 primary exhauster will then become the backup. This ventilation system services waste tanks 241-SY-101, 102 and 103. The nominal flow rate through the ventilation system is 1,000 cfm. The new ventilation system will contain a moisture eliminator, a heater, a prefilter, two stages of HEPA filtration, an exhaust fan, a stack and stack sampling system. The purpose of this document is to serve as the design and functional requirements for the mechanical installation of the new 241-SY modular exhauster. The mechanical installation will include modifying the existing ductwork (i.e., installing a ``T`` to connect the new exhauster to the existing system), modifying the existing condensate drain lines to accommodate the new lines associated with the new exhauster, a maintenance platform near the stack of the new exhauster, guy wires and guy wire footings to support the stack of the new exhauster, as well as other miscellaneous tasks associated with the mechanical installation design effort.
Date: November 10, 1994
Creator: Kriskovich, J. R.
System: The UNT Digital Library
Functions and requirements for K Basin SNF characterization shipping (open access)

Functions and requirements for K Basin SNF characterization shipping

This document details the plan for the shipping of fuel samples from the K Basins to the 300 Area for characterization. The fuel characterization project will evaluate the Hanford defense production fuel (N-Reactor and Single Pass Reactor) to support interim storage, transportation and final disposition. A limited number of fuel samples will be transported to a laboratory for analysis. It is currently estimated that 20 shipments of fuel per year for approximately 3 years (could be as long as 5 years) will be transported to the laboratory for analysis. Based on the NRC certificate of compliance each shipment is limited to 500 equivalent grams of {sup 235}U. In practical terms this will limit shipments to three outer elements or two assemblies of any type of N-Reactor or SPR fuel. Case by case determination of broken fuel will be made based on the type of fuel and maximum potential fissile content.
Date: November 10, 1994
Creator: Bergmann, D. W.
System: The UNT Digital Library
Japan-U.S. Automotive Framework Talks (open access)

Japan-U.S. Automotive Framework Talks

The U.S.-Japan framework talks were initiated in July 1993. The automotive negotiations between Japan and the United States focused on sales of U.S. vehicles in Japan; sales of U.S.-made original equipment parts in Japan and to Japanese transplants in the United States; and deregulation of the market for replacement parts in Japan. An unresolved dispute over shock absorbers and other replacement parts resulted in the United States launching a formal investigation of Japanese market barriers to imported car parts under Section 301 on Oct. 1, 1994.
Date: November 10, 1994
Creator: Bass, Gwenell L.
System: The UNT Digital Library