45-Day safety screen results for single shell tank 241-AP-106, liquid grab samples, riser 1, 30{degrees} and 150{degrees} in conjunction with evaporator campaign 95-1 (open access)

45-Day safety screen results for single shell tank 241-AP-106, liquid grab samples, riser 1, 30{degrees} and 150{degrees} in conjunction with evaporator campaign 95-1

This is the 45-Day report for the fiscal year 1995 safety screening characterization of three liquid grab samples from single shell tank 241-AP-106. The required analyses are differential scanning calorimetry (DSC), thermal gravimetric analysis (TGA) and appearance (APPR). No analytes exceeded the notification limits, therefore, secondary analyses (RSST, cyanide, and hot persulfate-total organic carbon) were not required. Summary data tables 2, 3 and 4 present the appearance, DSC and TGA data, respectively. Total alpha analyses are not included in this report, because it is not required for liquid grab samples.
Date: December 14, 1994
Creator: Miller, G. L.
System: The UNT Digital Library
Characterization of TNAZ (open access)

Characterization of TNAZ

The explosive TNAZ has recently become available in pilot-plant quantities. We have found its small-scale safety properties similar to those of other nitramines. Detonation calorimetry showed TNAZ to have 96% the energy of HMX and 150% of TNT. The shock sensitivity of neat TNAZ is greater than LX-14. A retonation wave was observed when the material was shocked at 2.0 GPa. The initiation behavior of neat TNAZ cannot be classified as either homogeneous or heterogeneous. Six plastic bonded TNAZ-based explosives have been developed for the Army.
Date: December 14, 1994
Creator: Simpson, R. L.; Garza, R. G.; Foltz, M. F.; Ornellas, D. L. & Utriew, P. A.
System: The UNT Digital Library
Design criteria document, Fire Protection Task, K Basin Essential Systems Recovery, Project W-405 (open access)

Design criteria document, Fire Protection Task, K Basin Essential Systems Recovery, Project W-405

The K Basin were constructed in the early 1950`s with a 20 year design life. The K Basins are currently in their third design life and are serving as a near term storage facility for irradiated N Reactor fuel until an interim fuel storage solution can be implemented. In April 1994, Project W-405, K Basin Essential Systems Recovery, was established to address (among other things) the immediate fire protection needs of the 100K Area. A Fire Barrier Evaluation was performed for the wall between the active and inactive areas of the 105KE and 105KW buildings. This evaluation concludes that the wall is capable of being upgraded to provide an equivalent level of fire resistance as a qualified barrier having a fire resistance rating of 2 hours. The Fire Protection Task is one of four separate Tasks included within the scope of Project W405, K Basin Essential systems Recovery. The other three Tasks are the Water Distribution System Task, the Electrical System Task, and the Maintenance Shop/Support Facility Task. The purpose of Project W-405`s Fire Protection Task is to correct Life Safety Code (NFPA 101) non-compliances and to provide fire protection features in Buildings 105KE, 105KW and 190KE that are essential …
Date: December 14, 1994
Creator: Johnson, B. H.
System: The UNT Digital Library
Design criteria document, Maintenance Shop/Support Facility, K-Basin Essential Systems Recovery, Project W-405 (open access)

Design criteria document, Maintenance Shop/Support Facility, K-Basin Essential Systems Recovery, Project W-405

During the next 10 years a substantial amount of work is scheduled in the K-Basin Area related to the storage and eventual removal of irradiated N-Reactor fuel. Currently, maintenance support activities are housed in existing structures that were constructed in the early 1950`s. These forty-year-old facilities and their supporting services are substandard, leading to inefficiencies. Because of numerous identified deficiencies and the planned increase in the numbers of K-Basin maintenance personnel, adequate maintenance support facilities that allow efficient operations are needed. The objective of this sub-project of Project W-405 is to provide a maintenance and storage facility which meets the K-Basin Maintenance Organization requirements as defined in Attachment 1. In Reference A, existing guidelines and requirements were used to allocate space for the maintenance activities and to provide a layout concept (See Attachment 2). The design solution includes modifying the existing 190 K-E building to provide space for shops, storage, and administration support functions. The primary reason for the modification is to simplify siting/permitting and make use of existing infrastructure. In addition, benefits relative to design loads will be realized by having the structure inside 190K-E. The new facility will meet the Maintenance Organization approved requirements in Attachment 1 relating …
Date: December 14, 1994
Creator: Strehlow, M. W. B.
System: The UNT Digital Library
Engineering task plan for Enraf Nonius densitometer assembly design (open access)

Engineering task plan for Enraf Nonius densitometer assembly design

A supporting assembly will be designed to accommodate the Enraf Nonius densitometer. The design will include a sight glass or calibration chamber, a rinse spool assembly, and a ball valve. The assembly will be based on the Enraf Nonius liquid level gauge assembly.
Date: December 14, 1994
Creator: Elfner, E. G.
System: The UNT Digital Library
Field demonstration of vapor phase TCE bioreactor. Final report (open access)

Field demonstration of vapor phase TCE bioreactor. Final report

The objective of this Cooperative Research and Development Agreement (CRADA), was to demonstrate the effectiveness of a vapor-phase bioreactor system for the destruction of trichloroethylene (TCE) from contaminated groundwater. A field demonstration was per-formed using groundwater at the Oak Ridge K-25 Site contaminated with a complex mixture of organic chemicals. This site is managed and operated by Martin Marietta Energy Systems, Inc. for the Department of Energy (DOE). Analysis of the data generated during the test can be summarized in three major observations. First, TCE was degraded in the presence of all the organics found in the steam strip condensate. This was observed during treatment of both the steam strip condensate and condensate amended with TCE to increase its concentration relative to the other components. The conclusion that TCE was being biodegraded was supported by performing mass balance control experiments with the reactor and by tracking recalcitrant chemicals also present in the steam stripper condensate. Second, there appeared to be an initial lag period of up to 24 hours before onset of TCE degradation in the reactor. The source of this lag was not determined but could be related to either an acclimation of the microorganisms to other chemicals found …
Date: December 14, 1994
Creator: unknown
System: The UNT Digital Library
Fire hazards analysis for W-413, West Area Tank Farm Storage and Staging Facility (open access)

Fire hazards analysis for W-413, West Area Tank Farm Storage and Staging Facility

In accordance with DOE Order 5480.7A, a Fire Hazards Analysis must be performed for all new facilities. The purpose of the analysis is to comprehensively assess the risk from fire within individual fire areas in relation to proposed fire protection so as to ascertain whether the fire protection objectives of the Order are met. The Order acknowledges a graded approach commensurate with the hazards involved. Tank Farms Operations must sore/stage material and equipment such as pipes, fittings, conduit, instrumentation and others related items until work packages are ready to work. Consumable materials, such as nut, bolts and welding rod, are also requires to be stored for routine and emergency work. Connex boxes and open storage is currently used for much of the storage because of the limited space at and 272WA. Safety issues based on poor housekeeping and material deteriorating due to weather damage has resulted from this inadequate storage space. It has been determined that a storage building in close proximity to the Tank Farm work force would be cost effective. This facility is classified as a safety class 4 building.
Date: December 14, 1994
Creator: Huckfeldt, R. A. & Lott, D. T.
System: The UNT Digital Library
HC-21C off-gas test procedure (open access)

HC-21C off-gas test procedure

The goal of this test plan is to determine the cause and location of water formation in the sludge stabilization off-gas system. The results should help determine what design improvements or processing steps will be implemented to prevent this phenomena from occurring in the future. This test procedure will include a series of tests to determine where and why liquid is condensing in the HC-21C furnace off-gas system. The tests will take a sequential, graded approach and may be concluded one the results have satisfactorily resolved the problem.
Date: December 14, 1994
Creator: Cunningham, L. T.
System: The UNT Digital Library
Tank 241-BX-104 tank characterization plan (open access)

Tank 241-BX-104 tank characterization plan

This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-BX-104.
Date: December 14, 1994
Creator: Carpenter, B. C.
System: The UNT Digital Library
Vault Safety and Inventory System users manual, PRIME 2350. Revision 1 (open access)

Vault Safety and Inventory System users manual, PRIME 2350. Revision 1

This revision is issued to request review of the attached document: VSIS User Manual, PRIME 2350, which provides user information for the operation of the VSIS (Vault Safety and Inventory System). It describes operational aspects of Prime 2350 minicomputer and vault data acquisition equipment. It also describes the User`s Main Menu and menu functions, including REPORTS. Also, system procedures for the Prime 2350 minicomputer are covered.
Date: December 14, 1994
Creator: Downey, N. J.
System: The UNT Digital Library
W-025, Acceptance Test Report (open access)

W-025, Acceptance Test Report

This Acceptance Test Report (ATR) has been prepared to establish field testing procedures to demonstrate that the Electrical/Instrumentation systems function as intended by the design.
Date: December 14, 1994
Creator: Roscha, V.
System: The UNT Digital Library
Analysis of BY-106 pump pit cover plate (open access)

Analysis of BY-106 pump pit cover plate

A new cover for the pump pit of Tank 241-BY-106 has been designed to allow the rotary core exhauster to be hooked up without requiring pit entry, riser modification, or equipment removal. The new pit cover is necessary to allow installation of two risers for reducing exposure, contamination, and waste. Computer analysis indicates that the safety margin of the pit cover plate with two risers is adequate. The computer stress model and input files are attached. The pit cover plate is a replacement for an existing plate; therefore seismic and wind loads were considered for the plate only.
Date: November 14, 1994
Creator: Coverdell, B. L.
System: The UNT Digital Library
Analytical Tools to Predict Distribution Outage Restoration Load. Final Project Report. (open access)

Analytical Tools to Predict Distribution Outage Restoration Load. Final Project Report.

The main activity of this project has been twofold: (1) development of a computer model to predict CLPU(Cold Load Pickup) and (2) development of a field measurement and analysis method to obtain the input parameters of the CLPU model. The field measurement and analysis method is called the Step-Voltage-Test (STEPV). The Kootenai Electric Cooperative Appleway 51 feeder in Coeur d`Alene was selected for analysis in this project and STEPV tests were performed in winters of 92 and 93. The STEPV data was analyzed (method and results presented within this report) to obtain the Appleway 51 feeder parameters for prediction by the CLPU model. One only CLPU record was obtained in winter 1994. Unfortunately, the actual CLPU was not dramatic (short outage and moderate temperature) and did not display cyclic restoration current. A predicted Appleway 51 feeder CLPU was generated using the parameters obtained via the STEPV measurement/analysis/algorithm method at the same ambient temperature and outage duration as the measured actual CLPU. The predicted CLPU corresponds reasonably well with the single actual CLPU data obtained in winter 1994 on the Appleway 51 feeder.
Date: November 14, 1994
Creator: Law, John
System: The UNT Digital Library
As-built design criteria: B-234 cathodic protection, C.P. wire to pipe connections (open access)

As-built design criteria: B-234 cathodic protection, C.P. wire to pipe connections

This document presents the as-built conditions (cathodic protection wire connections to miscellaneous underground piping) that do not otherwise exist on the current {open_quotes}Released for Construction{close_quotes} design drawings. A note will be added to each applicable drawing, referencing this support document.
Date: November 14, 1994
Creator: Brezler, T. A.
System: The UNT Digital Library
Configuration management program plan for Hanford site systems engineering (open access)

Configuration management program plan for Hanford site systems engineering

This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
Date: November 14, 1994
Creator: Hoffman, A. G.
System: The UNT Digital Library
Laboratory directed research and development on disposal of plutonium recovered from weapons. FY1994 final report (open access)

Laboratory directed research and development on disposal of plutonium recovered from weapons. FY1994 final report

This research project was conceived as a multi-year plan to study the use of mixed plutonium oxide-uranium oxide (MOX) fuel in existing nuclear reactors. Four areas of investigation were originally proposed: (1) study reactor physics including evaluation of control rod worth and power distribution during normal operation and transients; (2) evaluate accidents focusing upon the reduced control rod worth and reduced physical properties of PuO{sub 2}; (3) assess the safeguards required during fabrication and use of plutonium bearing fuel assemblies; and (4) study public acceptance issues associated with using material recovered from weapons to fuel a nuclear reactor. First year accomplishments are described. Appendices contain 2 reports entitled: development and validation of advanced computational capability for MOX fueled ALWR assembly designs; and long-term criticality safety concerns associated with weapons plutonium disposition.
Date: November 14, 1994
Creator: Pitts, J. H. & Choi, J. S.
System: The UNT Digital Library
Linear non-modal phenomena in numerical analysis and applied mathematics. First annual performance report, February 15, 1994--November 15, 1994 (open access)

Linear non-modal phenomena in numerical analysis and applied mathematics. First annual performance report, February 15, 1994--November 15, 1994

This report contains information on the following topics: pseudospectra of an operator of Hille and Phillips; Schwarz- Christoffel toolbox user`s guide; a matlab toolbox for Schwarz- Christoffel mapping; spectra and pseudospectra for pipe poiseuille flow; faster SVD for matrices with small m/n; calculation of pseudospectra by the Arnoldi iteration; and mostly linear model of transition to turbulence.
Date: November 14, 1994
Creator: Trefethen, L. N.
System: The UNT Digital Library
Manufacturing tailored property ceramic composites (open access)

Manufacturing tailored property ceramic composites

Composite materials are desirable for many advanced engineering applications where the properties of a single phase material cannot meet all of the service requirements; however, existing process technology has limited the development and commercialization of composites. Lack of reproducible sintering to high density is one of the major obstacles to commercializing ceramic composites. Final-stage, non-reactive liquid phase sintering (NLPS) theory provides metrics for sinterability that can be used as guidelines to design and manufacture dense ceramic-filled-glass (CFG) composites. Additionally, within the constraints defined by the NLPS theory, sum-property models can be used to predict CFG composite properties, and to design composites with properties tailored to specific applications. By integrating composite process models with composite property models, processable, application-tailored CFG composites for microelectronics packaging have been designed and fabricated.
Date: November 14, 1994
Creator: Ewsuk, K. G. & Harrison, L. W.
System: The UNT Digital Library
Models of natural fracture connectivity -- Implications for reservoir permeability. Final report (open access)

Models of natural fracture connectivity -- Implications for reservoir permeability. Final report

Fluid flow through fracture networks in a rock mass depends strongly on the nature of connections between fracture segments and between individual fractures. Therefore the objective of this research project is to develop three dimensional models for natural fracture connectivity using an integrated field, laboratory, and theoretical methodology. The geometric models the authors have developed are based on detailed field mapping and observations from outcrops of both massive and layered sedimentary rocks, typical of producing oil and gas reservoirs, or of aquifers. Furthermore, the have used computer simulations and laboratory experiments to investigate the physical mechanisms responsible for fracture connectivity (or lack thereof) as single and multiple sets of fractures evolve. The computer models are based on fracture mechanics principles and the laboratory experiments utilize layered composite materials analogous to sedimentary sequences. By identifying the physical mechanisms of connectivity they can relate the degree of connectivity to the geometry, state of stress, and material properties of the reservoir rocks and, in turn, be in a position to evaluate the influence of these factors on fracture permeability.
Date: November 14, 1994
Creator: Pollard, D. D. & Aydin, A.
System: The UNT Digital Library
The Multi-Function Waste Tank Facility (MWTF) surplus equipment report (open access)

The Multi-Function Waste Tank Facility (MWTF) surplus equipment report

None
Date: November 14, 1994
Creator: Cruz, V. J. & Epperson, E. M.
System: The UNT Digital Library
Oak Ridge defense conversion -- Translating technology into economic growth (open access)

Oak Ridge defense conversion -- Translating technology into economic growth

In 1992 there were over 6,000 employees involved in defense related activities at the Y-12 Plant. By late 1994 the plant had undergone a dramatic change in operations including a reduction of the work force to less than 4,000 employees. That this major downsizing was accomplished without a layoff is a tribute to the combined efforts of the Y-12 employees, union leadership, the DOE, Martin Marietta and local and state governments. The keys to the success are: (1) the end of the Cold War and the potential impact was recognized early and a plan of action was developed and implemented, the plan was based on a total reorientation of the historical role and mode of operation of the plant; (2) everyone who had an interest in the outcome was invited to join in the planning; (3) the plan was developed and implemented as if no barriers to success existed; (4) opening about one-third of the classified portion of the Y-12 Plant as the initial activity was critical to the success of the plan. The historical opening of the gates was a major factor in convincing employees and a skeptical public that change could and would occur. As the debate on …
Date: November 14, 1994
Creator: Johnson, D.H.
System: The UNT Digital Library
Prototype nickel component demonstration. Final report (open access)

Prototype nickel component demonstration. Final report

We have been developing a process to produce high-purity nickel structures from nickel carbonyl using chemical vapor deposition (CVD). The prototype demonstration effort had been separated into a number of independent tasks to allow Los Alamos National Laboratory (LANL) the greatest flexibility in tailoring the project to their needs. LANL selected three of the proposed tasks to be performed--Task 1- system modification and demonstration, Task 2-stainless steel mandrel trials, and Task 4-manufacturing study. Task 1 focused on converting the CVD system from a hot-wall to a cold-wall configuration and demonstrating the improved efficiency of the reactor type by depositing a 0.01-inch-thick nickel coating on a cylindrical substrate. Since stainless steel substrates were preferred because of their low {alpha}-emitter levels, Task 2 evaluated mandrel configurations which would allow removal of the nickel tube from the substrate. The manufacturing study was performed to develop strategies and system designs for manufacturing large quantities of the components needed for the Sudbury Nuetrino Observatory (SNO) program. Each of these tasks was successfully completed. During these efforts, BIRL successfully produced short lengths of 2-inch-diameter tubing and 6-inch-wide foil with levels of {alpha}-radiation emitting contaminants lower than either conventional nickel alloys or electroplated materials. We have produced …
Date: November 14, 1994
Creator: Boss, D.E.
System: The UNT Digital Library
Slug bucket lifting yoke analysis (open access)

Slug bucket lifting yoke analysis

There are baskets of fuel in the storage pools in the Purex facility (202-A). These baskets (called slug buckets) need to be removed from Purex and taken to the K-Basins. The current slug bucket lifting yoke is of sufficient age to be in question structurally. Therefore new yokes need to be fabricated. Prior to fabricating new yokes, the slug bucket lifting yoke DWG needs to be updated for fabrication. However, the design needs to be refined so that the yoke will be easier to fabricate. These calculations are prepared to demonstrate the adequacy of the new design. The objective of these calculations is to select appropriately sized structural members and weld sizes to serve as components in the slug bucket lifting yoke.
Date: November 14, 1994
Creator: McElfresh, A. J.
System: The UNT Digital Library
Tank 241-C-111 headspace gas and vapor sample results - August 1993 samples (open access)

Tank 241-C-111 headspace gas and vapor sample results - August 1993 samples

Tank 241-C-111 is on the ferrocyanide Watch List. Gas and vapor samples were collected to assure safe conditions before planned intrusive work was performed. Sample analyses showed that hydrogen is about ten times higher in the tank headspace than in ambient air. Nitrous oxide is about sixty times higher than ambient levels. The hydrogen cyanide concentration was below 0.04 ppbv, and the average NO{sub x} concentration was 8.6 ppmv.
Date: November 14, 1994
Creator: Huckaby, J. L.
System: The UNT Digital Library