41,047 Matching Results

Results open in a new window/tab.

1/12-Scale mixing interface visualization and buoyant particle release tests in support of Tank 241-SY-101 hydrogen mitigation (open access)

1/12-Scale mixing interface visualization and buoyant particle release tests in support of Tank 241-SY-101 hydrogen mitigation

In support of tank waste safety programs, visualization tests were performed in the 1/12-scale tank facility, using a low-viscosity simulant. The primary objective of the tests was to obtain video records of the transient jet-sludge interaction. The intent is that these videos will provide useful qualitative data for comparison with model predictions. Two tests were initially planned: mixing interface visualization (MIV) and buoyant particle release (BPR). Completion of the buoyant particle release test was set aside in order to complete additional MIV tests. Rheological measurements were made on simulant samples before testing, and the simulant was found to exhibit thixotropic behavior. Shear vane measurements were also made on an in-situ analog of the 1/12-scale tank simulant. Simulant shear strength has been observed to be time dependent. The primary objective of obtaining video records of jet-sludge interaction was satisfied, and the records yielded jet location information which may be of use in completing model comparisons. The modeling effort is not part of this task, but this report also discusses test specific instrumentation, visualization techniques, and shear vane instrumentation which would enable improved characterization of jet-sludge interaction and simulant characteristics.
Date: October 1, 1993
Creator: Eschbach, E. J. & Enderlin, C. W.
Object Type: Report
System: The UNT Digital Library
1/12-scale physical modeling experiments in support of tank 241-SY- 101 hydrogen mitigation (open access)

1/12-scale physical modeling experiments in support of tank 241-SY- 101 hydrogen mitigation

Hanford tank 241-SY-101 is a 75-ft-dia double-shell tank that contains approximately 1.1 M gal of radioactive fuel reprocessing waste. Core samples have shown that the tank contents are separated into two main layers, a article laden supernatant liquid at the top of the tank and a more dense slurry on the bottom. Two additional layers may be present, one being a potentially thick sludge lying beneath the slurry at the bottom of the tank and the other being the crust that has formed on the surface of the supernatant liquid. The supernatant is more commonly referred to as the convective layer and the slurry as the non-convective layer. Accumulation of gas (partly hydrogen) in the non-convective layer is suspected to be the key mechanism behind the gas burp phenomena, and several mitigation schemes are being developed to encourage a more uniform gas release rate (Benegas 1992). To support the full-scale hydraulic mitigation test, scaled experiments were performed to satisfy two objectives: 1. provide an experimental database for numerical- model validation; 2. establish operating parameter values required to mobilize the settled solids and maintain the solids in suspension.
Date: January 1, 1993
Creator: Fort, J. A.; Bamberger, J. A.; Bates, J. M.; Enderlin, C. W. & Elmore, M. R.
Object Type: Report
System: The UNT Digital Library
1/12-scale physical modeling experiments in support of tank 241-SY- 101 hydrogen mitigation. Final report (open access)

1/12-scale physical modeling experiments in support of tank 241-SY- 101 hydrogen mitigation. Final report

Hanford tank 241-SY-101 is a 75-ft-dia double-shell tank that contains approximately 1.1 M gal of radioactive fuel reprocessing waste. Core samples have shown that the tank contents are separated into two main layers, a article laden supernatant liquid at the top of the tank and a more dense slurry on the bottom. Two additional layers may be present, one being a potentially thick sludge lying beneath the slurry at the bottom of the tank and the other being the crust that has formed on the surface of the supernatant liquid. The supernatant is more commonly referred to as the convective layer and the slurry as the non-convective layer. Accumulation of gas (partly hydrogen) in the non-convective layer is suspected to be the key mechanism behind the gas burp phenomena, and several mitigation schemes are being developed to encourage a more uniform gas release rate (Benegas 1992). To support the full-scale hydraulic mitigation test, scaled experiments were performed to satisfy two objectives: 1. provide an experimental database for numerical- model validation; 2. establish operating parameter values required to mobilize the settled solids and maintain the solids in suspension.
Date: January 1993
Creator: Fort, J. A.; Bamberger, J. A.; Bates, J. M.; Enderlin, C. W. & Elmore, M. R.
Object Type: Report
System: The UNT Digital Library
1: Redox chemistry of bimetallic fulvalene complexes; 2: Oligocyclopentadienyl complexes (open access)

1: Redox chemistry of bimetallic fulvalene complexes; 2: Oligocyclopentadienyl complexes

The electrochemistry of the heterobimetallic complexes (fulvalene)WFe(CO){sub 5} (30) and (fulvalene)WRu(CO){sub 5} (31) has been investigated. Compound 30 is reduced in two one-electron processes, and this behavior was exploited synthetically to prepare a tetranuclear dimer by selective metal reduction. Complex 31 displayed a distinction between the metals upon reoxidation of the dianion, allowing the formation of a dimer by selective metal anion oxidation. The redox behavior of 30 led to an investigation of the use of electrocatalysis to effect metal-specific ligand substitution. It was found that reduction of 30 with a catalytic amount of CpFe(C{sub 6}Me{sub 6}) (97) in the presence of excess P(OMe){sub 3} or PMe{sub 3} led to the formation of the zwitterions (fulvalene)[W(CO){sub 3}{sup {minus}}][Fe(CO)PR{sub 3}{sup +}] (107, R = P(OMe){sub 3}; 108, R = PMe{sub 3}). Compound 31 also displayed unique behavior with different reducing agents, as the monosubstituted zwitterion (fulvalene)[W(CO){sub 3}{sup {minus}}][Ru(CO){sub 2}(PMe{sub 3}){sup +}] was obtained when 97 was used while the disubstituted complex (fulvalene) [W(CO){sub 3}{sup {minus}}] [Ru(CO)(PMe{sub 3}){sub 2}{sup +}] was produced when Cp*Fe(C{sub 6}Me{sub 6}) was the catalyst. Potential synthetic routes to quatercyclopentadienyl complexes were also explored. Various attempts to couple heterobimetallic fulvalene compounds proved to be unsuccessful. 138 refs.
Date: November 1, 1993
Creator: Brown, D. S.
Object Type: Thesis or Dissertation
System: The UNT Digital Library
A 2--4 nm Linac Coherent Light Source (LCLS) using the SLAC linac (open access)

A 2--4 nm Linac Coherent Light Source (LCLS) using the SLAC linac

We describe the use of the SLAC linac to drive a unique, powerful. short wavelength Linac Coherent Light Source (LCLS). Operating as an FEL, lasing would be achieved in a single pass of a high peak current electron beam through a long undulator by self-amplified spontaneous emission (SASE). The main components are a high-brightness rf photocathode electron gun; pulse compressors; about 1/5 of the SLAC linac; and a long undulator with a FODO quadrupole focussing system. Using electrons below 8 GeV, the system would operate at wavelengths down to about 3 nm, producing {ge}10 GW peak power in sub-ps pulses. At a 120 Hz rate the average power is {approx} 1 W.
Date: May 1, 1993
Creator: Winick, H.; Bane, K. & Boyce, R.
Object Type: Article
System: The UNT Digital Library
A 2-Megawatt load for testing high voltage dc power supplies (open access)

A 2-Megawatt load for testing high voltage dc power supplies

A high power water-cooled resistive load, capable of dissipating 2 Megawatts at 95 kilovolts is being designed and built. The load utilizes wirewound resistor elements suspended inside insulating tubing contained within a pressure vessel which is supplied a continuous flow of deionized water for coolant. A sub-system of the load is composed of non-inductive resistor elements in an oil tank. Power tests conducted on various resistor types indicate that dissipation levels as high as 22 times the rated dissipation in air can be achieved when the resistors are placed in a turbulent water flow of at least 15 gallons per minute. Using this data, the load w.as designed using 100 resistor elements in a series arrangement A single-wall 316 stainless steel pressure vessel with flanged torispherical heads is built to contain the resistor assembly and deionized water. The resistors are suspended within G-11 tubing which span the cylindrical length of the vessel. These tubes are supported by G-10 baffles which also increase convection from the tubes by promoting turbulence within the surrounding water.
Date: June 1, 1993
Creator: Horan, D.; Kustom, R.; Ferguson, M. & Primdahl, K.
Object Type: Article
System: The UNT Digital Library
[3 copies of LGPC agenda, January 12, 1993] (open access)

[3 copies of LGPC agenda, January 12, 1993]

Agenda for a meeting of the Lesbian/Gay Political Coalition on January 12, 1993 (three copies).
Date: January 12, 1993
Creator: Lesbian/Gay Political Coalition of Dallas
Object Type: Text
System: The UNT Digital Library
3-D Computations and Measurements of Accelerator Magnets for the APS (open access)

3-D Computations and Measurements of Accelerator Magnets for the APS

The Advanced Photon Source (APS), now under construction at Argonne National Laboratory (ANL), requires dipole, quadrupole, sextupole, and corrector magnets for each of its circular accelerator systems. Three-dimensional (3-D) field computations are needed to eliminate unwanted multipole fields from the ends of long quadrupole and dipole magnets and to guarantee that the flux levels in the poles of short magnets will not cause saturation. Measurements of the magnets show good agreement with the computations.
Date: 1993-11~
Creator: Turner, L. R.; Kim, S. H. & Kim, K.
Object Type: Article
System: The UNT Digital Library

4 in 1

Access: Use of this item is restricted to the UNT Community
Recording of Herbert Mitschke's 4 in 1. This piece uses traditional electro-acoustic technique to alter recording sounds and explore musical possibilities.
Date: 1993
Creator: Mitschke, Herbert A., 1954-
Object Type: Sound
System: The UNT Digital Library
4 MW upgrade to the DIII-D fast wave current drive system (open access)

4 MW upgrade to the DIII-D fast wave current drive system

The DIII-D fast wave current drive (FWCD) system is being upgraded by an additional 4 MW in the 30 to 120 MHz frequency range. This capability adds to the existing 2 MW 30 to 60 MHz system. Two new ABB transmitters of the type that are in use on the ASDEX-Upgrade tokamak in Garching will be used to drive two new water-cooled four-strap antennas to be installed in DIII-D in early 1994. The transmission and tuning system for each antenna will be similar to that now in use for the first 2 MW system on DIII-D, but with some significant improvements. One improvement consists of adding a decoupler element to counter the mutual coupling between the antenna straps which results in large imbalances in the power to a strap for the usual current drive intrastrap phasing of 90{degrees}. Another improvement is to utilize pressurized, ceramic-insulated transmission lines. The intrastrap phasing will again be controlled in pairs, with a pair of straps coupled in a resonant loop configuration, locking their phase difference at either 0 or 180{degrees}, depending upon the length of line installed. These resonant loops will incorporate a phase shifter so that they will be able to be tuned …
Date: October 1, 1993
Creator: deGrassie, J. S.; Pinsker, R. I. & Cary, W. P.
Object Type: Report
System: The UNT Digital Library
7-GeV Advanced Photon Source Beamline Initiative. Conceptual Design Report (open access)

7-GeV Advanced Photon Source Beamline Initiative. Conceptual Design Report

The DOE is building a new generation 6-7 GeV Synchrotron Radiation Source known as the Advanced Photon Source (APS) at Argonne National Laboratory. This facility, to be completed in FY 1996, can provide 70 x-ray sources of unprecedented brightness to meet the research needs of virtually all scientific disciplines and numerous technologies. The technological research capability of the APS in the areas of energy, communications and health will enable a new partnership between the DOE and US industry. Current funding for the APS will complete the current phase of construction so that scientists can begin their applications in FY 1996. Comprehensive utilization of the unique properties of APS beams will enable cutting-edge research not currently possible. It is now appropriate to plan to construct additional radiation sources and beamline standard components to meet the excess demands of the APS users. In this APS Beamline Initiative, 2.5-m-long insertion-device x-ray sources will be built on four straight sections of the APS storage ring, and an additional four bending-magnet sources will also be put in use. The front ends for these eight x-ray sources will be built to contain and safeguard access to these bright x-ray beams. In addition, funds will be provided …
Date: May 1993
Creator: Argonne National Laboratory
Object Type: Report
System: The UNT Digital Library
7-GeV advanced photon source beamline initiative: Conceptual design report (open access)

7-GeV advanced photon source beamline initiative: Conceptual design report

The DOE is building a new generation 6-7 GeV Synchrotron Radiation Source known as the Advanced Photon Source (APS) at Argonne National Laboratory. This facility, to be completed in FY 1996, can provide 70 x-ray sources of unprecedented brightness to meet the research needs of virtually all scientific disciplines and numerous technologies. The technological research capability of the APS in the areas of energy, communications and health will enable a new partnership between the DOE and US industry. Current funding for the APS will complete the current phase of construction so that scientists can begin their applications in FY 1996. Comprehensive utilization of the unique properties of APS beams will enable cutting-edge research not currently possible. It is now appropriate to plan to construct additional radiation sources and beamline standard components to meet the excess demands of the APS users. In this APS Beamline Initiative, 2.5-m-long insertion-device x-ray sources will be built on four straight sections of the APS storage ring, and an additional four bending-magnet sources will also be put in use. The front ends for these eight x-ray sources will be built to contain and safeguard access to these bright x-ray beams. In addition, funds will be provided …
Date: May 1, 1993
Creator: unknown
Object Type: Report
System: The UNT Digital Library
9-1-1 Caller, Volume 5, Number 1, January/February 1993 (open access)

9-1-1 Caller, Volume 5, Number 1, January/February 1993

Bimonthly newsletter of the Texas Advisory Commission on State Emergency Communications discussing news and activities of the organization as well as other information related to 9-1-1 services and other emergency communication within Texas.
Date: January 1993
Creator: Texas. Advisory Commission on State Emergency Communications.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
9-1-1 Caller, Volume 5, Number 2, March/April 1993 (open access)

9-1-1 Caller, Volume 5, Number 2, March/April 1993

Bimonthly newsletter of the Texas Advisory Commission on State Emergency Communications discussing news and activities of the organization as well as other information related to 9-1-1 services and other emergency communication within Texas.
Date: March 1993
Creator: Texas. Advisory Commission on State Emergency Communications.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
9-1-1 Caller, Volume 5, Number 3, May/June 1993 (open access)

9-1-1 Caller, Volume 5, Number 3, May/June 1993

Bimonthly newsletter of the Texas Advisory Commission on State Emergency Communications discussing news and activities of the organization as well as other information related to 9-1-1 services and other emergency communication within Texas.
Date: May 1993
Creator: Texas. Advisory Commission on State Emergency Communications.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
9-1-1 Caller, Volume 5, Number 4, July/August 1993 (open access)

9-1-1 Caller, Volume 5, Number 4, July/August 1993

Bimonthly newsletter of the Texas Advisory Commission on State Emergency Communications discussing news and activities of the organization as well as other information related to 9-1-1 services and other emergency communication within Texas.
Date: July 1993
Creator: Texas. Advisory Commission on State Emergency Communications.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
10-GW COâ‚‚ laser system at the Brookhaven Accelerator Test Facility (open access)

10-GW COâ‚‚ laser system at the Brookhaven Accelerator Test Facility

Design and performance of a high peak-power CO{sub 2} laser system to produce subnanosecond IR pulses for electron acceleration experiment are presented. We discuss theoretical aspects of the picosecond laser pulse propagation in a molecular amplifier and a design approach towards compact Terawatt CO{sub 2} laser systems.
Date: December 31, 1993
Creator: Pogorelsky, I.; Fischer, J. & Fisher, A. S.
Object Type: Article
System: The UNT Digital Library
A 12-channel VMEbus-based pulse-height analysis module (open access)

A 12-channel VMEbus-based pulse-height analysis module

The author describes a 12-channel VMEbus-based pulse-height analysis board that was designed for use in a high-rate, multidetector, gamma-ray imaging system. This module was designed to minimize dead-time losses and to allow all key parameters to be software controlled. Gamma-ray detectors are connected directly to this module, eliminating the need for additional electronics.
Date: December 1, 1993
Creator: Arnone, G. J.
Object Type: Article
System: The UNT Digital Library
``24/36/48`` Cathode Strip Chamber layout for SSC GEM Detector muon subsystem (open access)

``24/36/48`` Cathode Strip Chamber layout for SSC GEM Detector muon subsystem

The ``48/48/48`` {phi}-segmentation design for the Cathode Strip Chambers in the GEM Detector produces a number of coverage ``gaps`` in {phi} and {theta}. A revised ``24/36/48`` {phi}-segmentation layout provides increased geometric coverage and a significant reduction in the number of chambers in the detector. This will increase physics performance while reducing the labor costs associated with building and installing chambers in the GEM Detector. This paper documents the physical layout of the proposed change to the baseline chamber arrangement.
Date: December 15, 1993
Creator: Belser, F. C.; Clements, J. W. & Horvath, J. A.
Object Type: Report
System: The UNT Digital Library
The 50 MeV Beam Test Facility at LBL (open access)

The 50 MeV Beam Test Facility at LBL

A new beam line, expected to be built by September 1993, will transport the 50 MeV electron beam from the ALS LINAC into an experimental area to support various R&D activities in the Center for Beam Physics at LBL. A variety of experiments are planned involving the interaction of such a relativistic electron beam with plasmas (plasma focusing), laser beams (generation of femtosecond X-ray pulses) and electromagnetic cavities (Crab cavities etc....). The beam line is designed using the measured emittance and Twiss parameters of the ALS linac. It accommodates the different requirements of the various experiments on the electron beam properties (charge, energy, pulse length) and on the handling of the beam before and after the interaction point. Special attention has also been given to incorporate diagnostics for measuring the beam properties (such as the electron energy, bunch length and charge) needed in the interpretation of the experiments.
Date: May 1, 1993
Creator: Leemans, W.; Behrsing, G.; Kim, K. J.; Krupnick, J.; Matuk, C.; Selph, F. et al.
Object Type: Article
System: The UNT Digital Library
A 50-MeV mm-wave electron linear accelerator system for production of tunable short wavelength synchrotron radiation (open access)

A 50-MeV mm-wave electron linear accelerator system for production of tunable short wavelength synchrotron radiation

The Advanced Photon Source (APS) at Argonne in collaboration with the University of Illinois at Chicago and the University of Wisconsin at Madison is developing a new millimeter wavelength, 50-MeV electron linear accelerator system for production of coherent tunable wavelength synchrotron radiation. Modern micromachining techniques based on deep etch x-ray lithography, LIGA (Lithografie, Galvanoformung, Abformung), capable of producing high-aspect ratio structures are being considered for the fabrication of the accelerating components.
Date: December 31, 1993
Creator: Nassiri, A.; Kustom, R. L.; Mills, F. E.; Kang, Y. W.; Matthews, P. J.; Grudzien, D. et al.
Object Type: Article
System: The UNT Digital Library

93-4/94-1

Black background with linear patterns created by many small dots of paint. Many small, multi-hued circles float across the surface and dotted lines follow the background linear zigzag pattern.
Date: 1993/1994
Creator: Falsetta, Vincent
Object Type: Artwork
System: The UNT Digital Library
100 Area Columbia River sediment sampling (open access)

100 Area Columbia River sediment sampling

Forty-four sediment samples were collected from 28 locations in the Hanford Reach of the Columbia River to assess the presence of metals and man-made radionuclides in the near shore and shoreline settings of the Hanford Site. Three locations were sampled upriver of the Hanford Site plutonium production reactors. Twenty-two locations were sampled near the reactors. Three locations were sampled downstream of the reactors near the Hanford Townsite. Sediment was collected from depths of 0 to 6 in. and between 12 to 24 in. below the surface. Samples containing concentrations of metals exceeding the 95 % upper threshold limit values (DOE-RL 1993b) are considered contaminated. Contamination by arsenic, chromium, copper, lead, and zinc was found. Man-made radionuclides occur in all samples except four collected opposite the Hanford Townsite. Man-made radionuclide concentrations were generally less than 1 pCi/g.
Date: September 8, 1993
Creator: Weiss, S. G.
Object Type: Report
System: The UNT Digital Library
100 Area Excavation Treatability Test Plan (open access)

100 Area Excavation Treatability Test Plan

This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Development and screening of remedial alternatives for the 100 Area, using existing data, have been completed and are documented in the 100 Area Feasibility Study, Phases 1 and 2 (DOE-RL 1992a). Based on the results of the FS, the Treatability Study Program Plan (DOE-RL 1992b) identifies and prioritizes treatability studies for the 100 Area. The data from the treatability study program support future focused FS, interim remedial measures (IRM) selection, operable unit final remedy selection, remedial design, and remedial actions. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992b). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications.
Date: May 1, 1993
Creator: unknown
Object Type: Report
System: The UNT Digital Library