[beta][sup +] decay and cosmic-ray half-lives of [sup 143]Pm and [sup 144]Pm (open access)

[beta][sup +] decay and cosmic-ray half-lives of [sup 143]Pm and [sup 144]Pm

The positron decay partial half-lives of [sup 143]Pm and [sup 144]Pm are needed to assess the viability of elemental Pm as a cosmic-ray clock. We have conducted experiments to measure the [beta][sup +] branches of these isotopes; we find [beta][sup +] branches of these isotopes; we find [beta][sup +] branches of <5.7 [times]10[sup [minus]8] for [sup 143]Pm and <8[times]10[sup [minus] 7] for [sup 144]Pm. Through these branches are a factor of 20 lower than the previous experimental limits, the resulting partial half-lives are still too uncertain to permit any firm conclusions.
Date: April 12, 1993
Creator: Hindi, M.M. (Tennessee Technological Univ., Cookeville, TN (United States). Dept. of Physics); da Cruz, M.T.F.; Larimer, R.M.; Lesko, K.T.; Norman, E.B. (Lawrence Berkeley Lab., CA (United States)); Sur, B. (Lawrence Berkeley Lab., CA (United States) Queen's Univ., Kingston, ON (Canada). Dept. of Physics) et al.
Object Type: Article
System: The UNT Digital Library
Thomson scattering diagnostic analyses to determine the energetic particle distributions in TFTR (open access)

Thomson scattering diagnostic analyses to determine the energetic particle distributions in TFTR

The research completed and in progress for the first period of this grant is reviewed. Specific scattering scenarios for TFTR and JET and ITER were studied. The Lodestar scattering code, SKATR, was upgraded to include anisotropic energetic ion distributions and an analytic diffraction formulation was completed. Research continues on JET studies and upgrading the code for JET and ITER relevant conditions.
Date: February 12, 1993
Creator: Aamodt, R. E.; Cheung, P. & Russell, D. A.
Object Type: Report
System: The UNT Digital Library
Fissile solubility and monosodium titanate loading tests (open access)

Fissile solubility and monosodium titanate loading tests

The solubilities of plutonium and uranium have been determined for alkaline salt solutions having compositions which bound those which will be processed in the In-Tank Precipitation (ITP) process. Loadings of plutonium and uranium onto monosodium titanate (MST) have been determined at temperatures bounding those expected to occur during ITP and using a salt solution which was determined to have the maximum solubility for uranium and plutonium. Fissile loadings increase with decreasing amounts of MST in contact with the salt solutions saturated in plutonium and uranium. At MST concentrations bounding those which are planned for the ITP process, expressions for the maximum loadings (wt %) are determined to be 0.29 - 0.20x[MST] for plutonium and 1.8 - 0.29x[MST] for uranium, where [MST] is the concentration of MST in grams/liter. These expressions are valid over the range of MST concentrations from 0.05 to 0.51 g/L and temperatures of 17[degrees]--74[degrees]C. These loadings are below the individual infinitely safe limits for plutonium and uranium. Additional confirmatory experiments are planned to verify the effects of temperature and multiple contacts of the MST with fresh salt solution on the fissile loadings.
Date: February 12, 1993
Creator: Hobbs, D. T. & Fleischman, S. D.
Object Type: Report
System: The UNT Digital Library
The PACSAT Communications Experiment (PCE) (open access)

The PACSAT Communications Experiment (PCE)

While VITA (Volunteers in Technical Assistance) is the recognized world leader in low earth orbiting (LEO) satellite technology (below 1 GHz), its involvement in communications technologies is to facilitate renewable energy technology transfer to developing countries. A communications payload was incorporated into the UoSat 2 satellite (Surrey Univ., UK), launched in 1984; a prototype satellite (PCE) was also launched Jan 1990. US DOE awarded a second grant to VITA to design and test the prototype ground stations (command and field), install field ground stations in several developing country sites, pursue the operational licensing process, and transfer the evaluation results to the design of an operating system. This report covers the principal tasks of this grant.
Date: February 12, 1993
Creator: unknown
Object Type: Report
System: The UNT Digital Library
A novel process for methanol synthesis (open access)

A novel process for methanol synthesis

A bench-scale reactor is being used to conduct studies of the conversion of synthesis gas to methanol (MeOH) in the liquid phase by a novel process. In previous reports, we provided evidence for a two step reaction in series, the carbonylation reaction mainly takng place close and the hydrogenolysis reaction taking place on the surface of the copper chromate. The interaction between the two catalyst enhances the rate of MeOH formation. In the last quarter, we showed that under present operating conditions, the methyl formate (MeOH) concentration is not in equilibrium and hence both the carboxylation and the hydrogenolysis reactions influence the rate of MEOH formation. The activities of other alkali and alkaline earth compounds as catalysts, the effect of water and the controlling reaction in the concurrent synthesis is described in this report.
Date: February 12, 1993
Creator: Tierney, J.W. & Wender, I.
Object Type: Report
System: The UNT Digital Library
Engineering Development of Advanced Physical Fine Coal Cleaning Technologies: Froth Flotation (open access)

Engineering Development of Advanced Physical Fine Coal Cleaning Technologies: Froth Flotation

The Department of Energy (DOE) awarded a contract entitled Engineering Development of Advanced Physical Fine Coal Cleaning Technology - Froth Flotation'', to ICF Kaiser Engineers with the following team members, Ohio Coal Development Office, Babcock and Wilcox, Consolidation Coal Company, Eimco Process Equipment Company, Illinois State Geological Survey, Virginia Polytechnic Institute and State University, Process Technology, Inc. This document a quarterly report prepared in accordance with the project reporting requirements covering the period from July 1, 1992 to September 30, 1992. This report provides a summary of the technical work undertaken during this period, highlighting the major results. A brief description of the work done prior to this quarter is provided in this report under the task headings.
Date: February 12, 1993
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Engineering Development of Advanced Physical Fine Coal Cleaning Technologies: Froth Flotation (open access)

Engineering Development of Advanced Physical Fine Coal Cleaning Technologies: Froth Flotation

Work completed produced the criteria for additional engineering analysis, computation and detailed experimental benchscale testing for areas of uncertainty. The engineering analysis, computation, bench-scale testing and component development was formulated to produce necessary design information to define a commercially operating system. In order to produce the required information by means of bench-scale testing and component development, a uniform coal sample was procured. After agreement with DOE, a selected sample of coal from those previously listed was secured. The test plan was developed in two parts. The first part listed procedures for engineering and computational analyses of those deficiencies previously identified that could be solved without bench scale testing. Likewise, the second part prepared procedures for bench-scale testing and component development for those deficiencies previously identified in Task 3.
Date: February 12, 1993
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Thermodynamics of computation and information distance (open access)

Thermodynamics of computation and information distance

Applying the tools of algorithmic information theory, we compare several candidates for an asymptotically machine-independent. absolute measure of the informational or cognitive'' distance between discrete objects x and y. The maximum of the conditional Kolmogorov complexities max[l brace]K(y[vert bar]z) K(m[vert bar]y)[r brace], is shown to be optimal, in the sense of being minimal within an additive constant among semicomputable, symmetric, positive semidefinite functions of z and y satisfying a reasonable normalization condition and obeying the triangle intequality. The optimal metric, in turn, differs by at most an additive logarithmic term from the size of the smallest program for a universal reversible computer to transform x into y. This program functions in a 'catalytic'' capacity, being retained in the computer before, during, and after the computation. Similarly, the sum of the conditional complexities. K(y[vert bar]x) + K(x[vert bar]y), is shown to be equal within a logarithmic term to the minimal amount Of information flowing out and in during a reversible computation in which the program is not retained. Finally. using the physical theory of reversible computation, it is shown that the simple difference K(x) - K(y) is an appropriate (ie universal, antisymmetric, and transitive) measure of the amount of thermodynamic work …
Date: March 12, 1993
Creator: Bennett, C.H.; Gacs, P.; Li, M.; Vitanyi, P.M.B. & Zurek, W.H.
Object Type: Article
System: The UNT Digital Library
ACE program/UNIX user manual (open access)

ACE program/UNIX user manual

This report the following: How to use the ace program ; Introduction to the ace program; Online command; Define a macro file; Macro commands; Counters and MCA; Counters usage; Counters database; Feedback Counter Database; MCA functions and macro command; X window Interclient Communication; and How to get around in UNIX
Date: January 12, 1993
Creator: Feng-Berman, S.K.
Object Type: Report
System: The UNT Digital Library
Structural stability of 1100[degree]C heated Pd/k during absorption cycling in protium. [Palladium supported on kieselguhr] (open access)

Structural stability of 1100[degree]C heated Pd/k during absorption cycling in protium. [Palladium supported on kieselguhr]

Pd/k is a hydride forming packing material which is used in the Thermal Cycling Absorption Process (TCAP). Palladium is supported on kieselguhr to create a packing material which will provide adequate void space to prevent excessive pressure drops and flow restrictions. The use of unsupported palladium would result in blockage of columns and clogging of filters due to the small particle size of unsupported palladium hydride powder. During pilot scale demonstrations, it was noted that the Pd/k packing material had degraded causing severe flow restrictions within the TCAP column. A solution to the problem involved the heating of Pd/k at 1,110[degree]C to strengthen the packing material, and render it more resistant to breakdown. The 1, 100[degree]C heated Pd/k has been shown to be more resistant to mechanical breakdown than the Pd/k prior to heat treatment. Two primary modes of Pd/k particle degradation have been identified: mechanical breakdown caused by particle fluidization and degradation caused by absorption/desorption cycling. Absorption/desorption cycling causes the palladium particles within the packing to expanded and contract upon formation and decomposition of the hydride, respectively. This expansion and contraction causes large localized stresses within the packing material, which if these stresses can not be accommodated within the …
Date: March 12, 1993
Creator: Fisher, I. A.
Object Type: Report
System: The UNT Digital Library
RF impedance measurement calibration (open access)

RF impedance measurement calibration

The intent of this note is not to explain all of the available calibration methods in detail. Instead, we will focus on the calibration methods of interest for RF impedance coupling measurements and attempt to explain: (1). The standards and measurements necessary for the various calibration techniques. (2). The advantages and disadvantages of each technique. (3). The mathematical manipulations that need to be applied to the measured standards and devices. (4). An outline of the steps needed for writing a calibration routine that operated from a remote computer. For further details of the various techniques presented in this note, the reader should consult the references.
Date: February 12, 1993
Creator: Matthews, P. J. & Song, J. J.
Object Type: Report
System: The UNT Digital Library
The Theory of Hadronic Systems. Annual Progress Report April 12, 1993 (open access)

The Theory of Hadronic Systems. Annual Progress Report April 12, 1993

This report briefly discusses progress on the following topics: isospin breaking in the pion-nucleon system; direct capture of pions into deeply bound atomic states; knock out of secondary components in the nucleus; study of the radii of neutron distributions in nuclei; the hadronic double scattering operator; transparency in pion production; asymmetry in pion scattering and charge exchange from polarized nuclei; the mechanism of pion absorption in nuclei; the neutron-proton charge-exchange reaction; modification of the fundamental structure of nucleons in nuclei; and antiproton annihilation in nuclei.
Date: April 12, 1993
Creator: Gibbs, William R.
Object Type: Report
System: The UNT Digital Library
Development of a system of innovative insulated building blocks under energy related inventions grant. Quarterly rogress report, ThermaLock Products, Inc., July 1, 1993--September 30, 1993 (open access)

Development of a system of innovative insulated building blocks under energy related inventions grant. Quarterly rogress report, ThermaLock Products, Inc., July 1, 1993--September 30, 1993

This brief report describes results pertaining to the development of insulated blocks. Areas covered include fabrication, noise and earthquake test design, and the development of a stuffing machine.
Date: October 12, 1993
Creator: unknown
Object Type: Report
System: The UNT Digital Library
M2 priority screening system for near-term activities: Project documentation. Final report December 11, 1992--May 31, 1994 (open access)

M2 priority screening system for near-term activities: Project documentation. Final report December 11, 1992--May 31, 1994

From May through August, 1993, the M-2 Group within M Division at LANL conducted with the support of the LANL Integration and Coordination Office (ICO) and Applied Decision Analysis, Inc. (ADA), whose purpose was to develop a system for setting priorities among activities. This phase of the project concentrated on prioritizing near-tenn activities (i.e., activities that must be conducted in the next six months) necessary for setting up this new group. Potential future project phases will concentrate on developing a tool for setting priorities and developing annual budgets for the group`s operations. The priority screening system designed to address the near-term problem was developed, applied in a series of meeting with the group managers, and used as an aid in the assignment of tasks to group members. The model was intended and used as a practical tool for documenting and explaining decisions about near-term priorities, and not as a substitute for M-2 management judgment and decision-making processes.
Date: August 12, 1993
Creator: unknown
Object Type: Report
System: The UNT Digital Library