High Flux Isotope Reactor Quarterly Report: April-June 1976 (open access)

High Flux Isotope Reactor Quarterly Report: April-June 1976

Despite four end-of-cycle shutdowns during the reporting period, the reactor operated 95.6 percent of the time. This increased the on-stream time for the year to 95.3 percent. A test of the reactor bay in-leakage determined that an exhaust flow rate of 3,050 cfm is required to maintain a vacuum of 0.1 in. of water in this area.
Date: November 1, 1976
Creator: McCord, R. V. & Corbett, B. L.
System: The UNT Digital Library