Fast Flux Test Facility. Design and Development Quality Assurance Requirements for the FFTF (open access)

Fast Flux Test Facility. Design and Development Quality Assurance Requirements for the FFTF

The document is presented to provide general management requirements for Pacific Northwest Laboratory (PNL) and contractor design and development quality assurance programs to assure the required quality level of the various items required for the FFTF. The document is applicable as imposed by the contract to FFTF contractors and subcontractors. The document is also applicable to PNL design and development activities related to the FFTF.
Date: October 23, 1968
Creator: Albert, W. G.
System: The UNT Digital Library
Locating tube blockage that X-ray cannot detect (open access)

Locating tube blockage that X-ray cannot detect

None
Date: September 23, 1968
Creator: Hendron, J.A.
System: The UNT Digital Library
Plutonium-238: Program analysis (open access)

Plutonium-238: Program analysis

The program is designed to use the Richland reactors to increase the national production of Pu-238 in as efficient and economical a manner as practicable while giving attention to any short-term market requirements for Pu-238.
Date: September 23, 1968
Creator: Geier, R. G.
System: The UNT Digital Library
Status of irradiations performed by testing and irradiation services for BNW as of September 15, 1968 (open access)

Status of irradiations performed by testing and irradiation services for BNW as of September 15, 1968

This report itemizes the irradiations performed by Testing and Irradiation Services for Battelle-Northwest. It lists the material being irradiated, awaiting disposition and material shipped during the report period.
Date: September 23, 1968
Creator: Barker, L. V.
System: The UNT Digital Library
WFDD-TS-3005 permeability studies. Final report (open access)

WFDD-TS-3005 permeability studies. Final report

None
Date: September 23, 1968
Creator: Anderson, R.E.
System: The UNT Digital Library
Shippingport Atomic Power Station Quarterly Operating Report: First Quarter 1968 (open access)

Shippingport Atomic Power Station Quarterly Operating Report: First Quarter 1968

None
Date: August 23, 1968
Creator: unknown
System: The UNT Digital Library
Personnel exposure reduction (open access)

Personnel exposure reduction

Process Physics Unit has investigated in our sphere of responsibility the changes in reactor operating methods which would result in lower personnel radiation exposure. Reduced spline usage is the only innovation I can suggest for reducing personnel radiation accumulation.
Date: July 23, 1968
Creator: Hamric, J. P.
System: The UNT Digital Library
Colorado River and Tributaries Texas Covering Mouth of Colorado River (open access)

Colorado River and Tributaries Texas Covering Mouth of Colorado River

Report of the U.S. Army Engineers describing the geography of Colorado River and Tributaries Texas covering mouth of colorado River including the likelihood of floods and benefits of flood control
Date: August 4, 1936
Creator: United States. Department of the Army. Office, Chief of Engineers.
System: The Portal to Texas History
Metal tube bore inserts (open access)

Metal tube bore inserts

None
Date: April 23, 1968
Creator: Kochka, E.L.
System: The UNT Digital Library
Thermophysical properties of unirradiated SNAP fuels (open access)

Thermophysical properties of unirradiated SNAP fuels

None
Date: February 23, 1968
Creator: Young, W. A.; Weeks, C. C.; Nakata, M. M. & Smith, C. A.
System: The UNT Digital Library
Long range O2 R&D program (open access)

Long range O2 R&D program

As requested in the referenced letter, we have reviewed our research and development programs with respect to our ability to meet desirable program objectives at annual funding levels of 4.5, 5.5, and 6.5 million dollars. Program objectives which we propose for Hanford include the following: (1) Continuation of safe and efficient plant operation and provision for long reactor life. (2) Development completed to permit reactors to comply with Federal and State regulations on confinement and discharges to the river by FY-1974-1975 when non-national defense needs will predominate. (3) Development completed to permit separations plants to approach Federal and State regulations on discharges to the environment by FY-1972, with substantial improvement being realized incrementally before that time. (4) Tritium production at a rate of 25 kg per year starting in FY-1972. (5) Modernization, higher production efficiency, automation, and fuel standardization to permit significant unit cost reduction by FY-1975 for possible preproduction of plutonium for fast breeders. (6) Achievement of 5600 MW in N Reactor by FY-1973 to further reduce unit cost and to provide for at least 15 years of dual-purpose operation at the higher level. (7) Demonstration of technology for large-scale economic production of Pu-238 of medical grade quality by …
Date: January 23, 1968
Creator: Paul, R. S.
System: The UNT Digital Library