Serial/Series Title
2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Extrusion of Uranium Tubes
Technical report. From Abstract : "Several hundred long, thin-walled uranium tubes were extruded to close dimensional tolerance by a potentially low cost fabrication process in commercial facilities. The principal process steps were; forging uranium ingots, machining the forged ingots into billets, and extruding the billets into tubes. Some 750 tubes (maximum dimensions: 3.5 inches in diameter and 15 feet long) were fabricated by this process. Dimensional control was excellent in that 88% of the tubes were within +/- 0.010 inch of average dimensions over their entire length."
Date:
July 1961
Creator:
Fisher, R. E.
System:
The UNT Digital Library
Precipitation of Neptunium Peroxide
Technical report. From Abstract : "Optimum conditions were determined for the precipitation of neptunium (IV) peroxide from nitric acid solutions. The results indicate that the precipitation could be applied successfully on a plant scale. ... Two crystalline modifications of the peroxide were prepared; these two crystalline structures were similar to structures previously reported for plutonium peroxide."
Date:
July 1961
Creator:
Burney, Glenn A. & Dukes, Ernest K.
System:
The UNT Digital Library