3 Matching Results

Results open in a new window/tab.

Mid-Year Summary Report October 1, 1960-March 31, 1961 Army Pwr Support and Development Program (open access)

Mid-Year Summary Report October 1, 1960-March 31, 1961 Army Pwr Support and Development Program

Abstract: A cyclic stress analysis of the SM-1 primary system was carried out. Problems encountered in the fabrication of PM-2A Core II and SM-lA Core II are described, and the results of an examination of damaged SM-lA Core I stationary fuel elements reported. A preliminary study of the radiation damage to SM-1 reactor vessel was made and the possibility of annealing the vessel discussed. Performance analyses are presented for five cores: SM-1 Core, SM-1 Core 1 rearranged and spiked, SM-1 Core II with special components, PM-2A Core 1, and SM- 1A Core 1. Preliminary critical experiments were made with SM-2 elements in a SM- 1 core configuration and nuclear and thermal analyses of the use of SM-2 elements in SM-1, SM-1A, and PM-2A completed. A throttling steam calorimeter was selected for measuring moisture carry-over on the PM-2A steam generator. Test procedures for evaluating the shielding of the SM-1, SM-lA, and PM-2A plants are summarized. Radiochemical and chemical analyses of SM-1 coolant and crud are summarized, and methods of activity control discussed. Preliminary results of studies of the properties of reactor pressure vessels under irradiation and no irradiation conditions are summarized briefly.
Date: June 2, 1961
Creator: Hoover, H. L.
System: The UNT Digital Library
Investigation of Local Boiling of SM-1 (open access)

Investigation of Local Boiling of SM-1

Abstract; SM-1 Reactor Core I Rearranged and Spiked, and Core II with Special Components were analyzed under various off-design conditions to induce nucleate boiling. The steady state code, STDY-3, written for the thermal analysis of pressurized water cores, was employed for the analysis. The code performs a complete steady state parallel channel thermal analysis for both nominal and hot channels. Thermal characteristics of individual elements were investigated while changing the parameters of primary pressure or inlet temperature to introduce the phenomenon of nucleate boiling in the the core. Reduction of system pressures to 1000, 800, and 600 psia and increasing core inlet temperatures to 465 and 500 degree F were studied as the means to induce boiling in the core. This analysis indicates that SM-1 Core I Rearranged and Spiked can be safely operated at the reduced pressure of 910 psia without introducing extensive boiling in the core. SM-1 Core II with Special Components can be operated at 800 psia or at an inlet temperature of 500 degree F at 1200 psia.
Date: June 20, 1961
Creator: Bradley, P. L.
System: The UNT Digital Library
Extended SM-2 Critical Experiments : CE-2 (open access)

Extended SM-2 Critical Experiments : CE-2

Abstract: This technical report contains a description and results of a second series of critical experiments performed on the SM-2 core mock-up, as additional to the first series of experiments reported in APAE No. 54. The SM-2 core mock-up contains 36.4 kg U-235 and and estimated 67.9 gm B-10. The equivalent diameter and the active height are about 22 in.; the metal-to-water volume ration is 0.344. Data is presented on activation, reactivity, and stuck rod measurements. All measurements were conducted on the open seven control rod array employing 38 stationary fuel elements. Activation measurements consisted of neutron flux measurements using uranium fission foils for relative power distribution studies, the effect of flux suppressors on reducing power peaks, blocked coolant channel measurements, and gamma ray dose distribution. Reactivity measurements were performed to determine the effect f flow divider, flux suppressors and stimulated high temperature and pressure operation; b-10 loading in the SM-2 core; and core material coefficients. For the later, the worth in cents per gm or cents per cc was determined at simulated temperature of 510 degree F for B-10, U-235, stainless steel, and void. Stuck rod measurements were made to obtain an indication of the criticality margin in the …
Date: June 30, 1961
Creator: McCool, W. J.; Robinson, R. A.; Weiss, S. H.; Raby, T. M.; Schrader, E. W. & Walthousen, L. D.
System: The UNT Digital Library