States

Preliminary petrographic study of rock from Nevada Test Site - Basalt Mesa (open access)

Preliminary petrographic study of rock from Nevada Test Site - Basalt Mesa

Discussing photographs of rocks from Basalt Mesa
Date: May 6, 1960
Creator: Anderson, E. E.
System: The UNT Digital Library
SM-2 Final Design Progress Review Report: December 16, 1959 to March 1, 1960 (open access)

SM-2 Final Design Progress Review Report: December 16, 1959 to March 1, 1960

From introduction: "The contract covers final design of the SM-2 Nuclear Power (PWR) Steam Electric Station, described in the preliminary design report, APAE 40, Volumes I and II."
Date: April 6, 1960
Creator: Knighton, G. W.
System: The UNT Digital Library