Serial/Series Title
Country
4 Matching Results
Results open in a new window/tab.
Results:
1 - 4 of
4
ABWR: PL-2 Design Report
From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Date:
October 15, 1960
Creator:
Combustion Engineering, inc. Nuclear Division.
System:
The UNT Digital Library
An Evaluation of Fossil Superheat for Nuclear Power Plants
From introduction: This report sets forth the results of a study of the evaluation of fossil fuel superheat in nuclear power plants.
Date:
October 1960
Creator:
unknown
System:
The UNT Digital Library
A Feasibility Study for the Use of an Extended Pm¹⁴⁷ Source for Analytical Fluorescence Spectroscopy: Final Report
From summary: The design of a spectrometer with the requisite improvement in crystals facilitates X-ray tube fluorescence.
Date:
October 31, 1960
Creator:
Brech, Frederick
System:
The UNT Digital Library
Health and Safety Laboratory Fallout Program Quarterly Summary Report: June 1, 1960 - September 1, 1960
Report that summarizes multiple laboratories' reports on global fallout deposition. Reports include data on Strontium-90 deposition recorded by the Health and Safety Laboratory, data from other laboratories, related interpretive reports, and recent publications related to fallout.
Date:
October 1, 1960
Creator:
Hardy, Edward P., Jr.; Rivera, Joseph & Frankel, Robert
System:
The UNT Digital Library