ABWR: PL-2 Design Report (open access)

ABWR: PL-2 Design Report

From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Date: October 15, 1960
Creator: Combustion Engineering, inc. Nuclear Division.
System: The UNT Digital Library
Argonne National Laboratory Idaho Division Summary Report: July-September, 1960 (open access)

Argonne National Laboratory Idaho Division Summary Report: July-September, 1960

Report issued by the Argonne National Laboratory covering a summary report of the work conducted by the Idaho Division. Experimental work and progress made on reactors are presented. This report includes tables, illustrations, and photographs.
Date: 1960
Creator: Argonne National Laboratory. Idaho Division.
System: The UNT Digital Library
Study of Remote Military Power Applications: Report 5, NORAD (open access)

Study of Remote Military Power Applications: Report 5, NORAD

From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Creator: unknown
System: The UNT Digital Library
Study of Remote Military Power Applications: Report 7, Super Sage Rocky Mountains Area (open access)

Study of Remote Military Power Applications: Report 7, Super Sage Rocky Mountains Area

From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Creator: unknown