Gas-Cooled Reactor Project Quarterly Progress Report: September 1960 (open access)

Gas-Cooled Reactor Project Quarterly Progress Report: September 1960

Report documenting ongoing research and developments at the Oak Ridge National Laboratory's Gas-Cooled Reactor Project.
Date: November 11, 1960
Creator: Oak Ridge National Laboratory
System: The UNT Digital Library
Steam-Cooled Power Reactor Evaluation: Mixed Spectrum Superheater (open access)

Steam-Cooled Power Reactor Evaluation: Mixed Spectrum Superheater

From introduction: "This report provides the preliminary design for the nuclear portion of a 300 MWe Mixed Spectrum Superheater to be in operation by 1967.
Date: November 1960
Creator: U.S. Atomic Energy Commission
System: The UNT Digital Library
Plutonium Recycle Test Reactor Final Safeguard Analysis: Supplement 2, Consequences of a Primary Coolant Leak (open access)

Plutonium Recycle Test Reactor Final Safeguard Analysis: Supplement 2, Consequences of a Primary Coolant Leak

Review of previous work is presented in addition to the results of recent studies concerning loss of primary coolant when the system is cold and pressurized and the problem of supplying adequate cooling following the injection of light water.
Date: November 15, 1960
Creator: Wittenbrock, N. G. & Muraoka, J.
System: The UNT Digital Library
SM-1 Research and Development Program: Long-lived Induced Activity Buildup During SM-1 Core I Lifetime. Task XVIII, Phase I (open access)

SM-1 Research and Development Program: Long-lived Induced Activity Buildup During SM-1 Core I Lifetime. Task XVIII, Phase I

Abstract: The results of activity buildup studies in the SM-1 performed during Core I lifetime (June 3, 1957 to April 28, 1960) are reported. Data are presented on the extent, nature, and mechanism of the buildup of long-lived gamma emitting nuclides in the reactor primary system. Radiation levels after reactor shutdown are presented, as well as mathematical equations used to account for the observed activity levels. The data have shown that Co60 is the major contributor to radiation levels in the SM-1. Co60 activity arises from the cobalt in Haynes 25 alloy flux suppressors, and the cobalt impurity in stainless steel. After 35 months operation at an average power level of 55%, deposited Co60 activity accounted for approximately 83% of the total radiation level (mr/hr) contributed by the long-lived gamma emitting nuclides. The contribution of the primary coolant activity to the total radiation level is insignificant when compared to the contribution of the activity deposited on the walls of the system. The radiation level on the super-heater side of the steam generator was about 1400 mr/hr after 35 months of reactor operation. The percentages of Co60 activity in the coolant and in the deposits were not the same. This indicates …
Date: November 30, 1960
Creator: Bergmann, C. A.; Bergen, C.; Cox, J. F.; Chupak, J. & Grant, L. G.