Interim Report of Nuclear Analysis Performed on SM-2 Core and Vessel : September 1, 1958 to December 31, 1959. (open access)

Interim Report of Nuclear Analysis Performed on SM-2 Core and Vessel : September 1, 1958 to December 31, 1959.

Abstract: This technical report contains a description of the nuclear analysis performed upon the SM-2 core and vessel for the period September 1, 1958 to December 31, 1959. Calculations are given for core reactivity, power distributions, lifetime, reactor control, kinetics, radiation problems, fuel and poison burn-ups, and the nuclear effects of poisons, temperature, and geometry. Wherever possible, experimental data is included in order to test the validity of the analytical models. The SM-2 nuclear analysis was performed by Alco Products, in. under Tasks 1, 8, and 10 of Contract No. AT(30-2)-326 for the Atomic Energy Commission.
Date: May 27, 1960
Creator: Bobe, P. E.; Birken, S. H.; Byrne, B. J.; Clancy, E. F. & Fried, B. E.
System: The UNT Digital Library
Scale "Up or Down" Analysis for Prototype Test (open access)

Scale "Up or Down" Analysis for Prototype Test

Introduction: In conjunction with the final design and development of a 70 MW sodium intermediate heat exchanger and a sodium steam generator, an analysis is required which can be used as a basis for a determination to scale up or scale down the designs. Included in this analysis are those considerations leading to the recommendation of the best prototype test unit and to some of the limits imposed on scaling up or down when considering future applications of designs other than those actually tested. In addition, these considerations include aspects required to accurately predict the performance, operation, mechanical reliability, and feasibility of fabrication of the 70 MW design.
Date: May 1, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Hazards Summary Report for the Army Package Power Reactor : SM-1, Task XVII (open access)

Hazards Summary Report for the Army Package Power Reactor : SM-1, Task XVII

Preface. This technical report is an updated and revised version of the original SM-1 (APPR-1) Hazards Summary Report. The original report was issued July 1955, almost two years before construction of the SM-1 plant was completed. During that time interval there were numerous design changes. Consequently, the original report does not accurately describe the plant as built. This revision is written after the SM-1 has been operated 3 years. It describes the as-build plant and includes plant modifications and experience obtained during the first 3 years of SM-1 operation.
Date: May 1960
Creator: Rosen, S. S.
System: The UNT Digital Library
The ML-1 Design Report (open access)

The ML-1 Design Report

From abstract: "This report describes the design of the mobile nuclear power plant which is to be the prototype of a mobile, low-powered nuclear power plant intended to furnish electrical power in remote locations."
Date: May 16, 1960
Creator: Linenberger, G. A.
System: The UNT Digital Library
Liquid Metal Fuel Reactor Experiment: Operation and Testing of a Nonnuclear Liquid-Metal System (open access)

Liquid Metal Fuel Reactor Experiment: Operation and Testing of a Nonnuclear Liquid-Metal System

Extensive experimental program undertaken to provide data on the operation and testing of a bismuth-to-bismuth dual-loop system.
Date: May 1960
Creator: unknown
System: The UNT Digital Library
Effect of Superheat and Moisture Separation on the SM-2 Design (open access)

Effect of Superheat and Moisture Separation on the SM-2 Design

From abstract: "The study evaluates the utilization of superheat and moisture separation techniques in the SM-2 design to improve the steam plant reliability and thermal efficiency. Ease of packaging, steam plant transient response, and capital costs are also considered. The reference design used for comparison is the steam cycle employing saturated steam at 600 psia described in APAE No. 40, Volume II."
Date: May 27, 1960
Creator: Phelps, E. F.
System: The UNT Digital Library