PM-1 Nuclear Power Plant Program: 3rd Quarterly Progress Report, September 1, 1959-November 30, 1959 (open access)

PM-1 Nuclear Power Plant Program: 3rd Quarterly Progress Report, September 1, 1959-November 30, 1959

From abstract: The principal efforts are the furthering of the final design and preparation of specifications for some long-lead components. The entire power plant has been divided, for final design purposes, into 37 subsystems. The status of work on each subsystem at the close of the period is reported.
Date: March 1960
Creator: Martin Company. Nuclear Division.
System: The UNT Digital Library
Strontium 90 Power Project: Final Summary Report (open access)

Strontium 90 Power Project: Final Summary Report

From summary: The primary purpose of this project is to determine the feasibility of converting reactor waste Strontium-90 into a safe and useful source of electrical energy. Secondary purpose is physical and environmental testing of the power conversion device or thermoelectric couples. This required actual fabrication of a 100-thermal-watt strontium titanate fuel element
Date: March 1960