Serial/Series Title
1 Matching Results
Results open in a new window/tab.
Results:
1 - 1 of
1
Termination Report for Development Test IP-306-K Spline Coilers at K Reactor
A reliable spline disposal system is necessary for full utilization of the Poison Spline Control System. The spline choppers were not reliable enough so a spline coiler was developed and designed to replace the choppers. A Development Test, IP-306-X (HW-63820), was issued authorizing on-pile testing of the spline coiler at X area. This report closes the Development Test and discusses the use of spline coilers.
Date:
June 24, 1960
Creator:
McCarthy, P. B.
System:
The UNT Digital Library