Dynamic Response of Reactor Plant to Load Changes. Section I. First Performance. Core I, Seed 1. Test Results DL-S-251 (T-612390) (open access)

Dynamic Response of Reactor Plant to Load Changes. Section I. First Performance. Core I, Seed 1. Test Results DL-S-251 (T-612390)

The purpose of the test was to determine the responses of the plant when subjected to load transients exceeding the design magnitudes, and to determine the maximum load changes, positive or negative, that the plant can sustain. The reactor plant responded satisfactorily to all load transients. The only limits exceed were the pressurizer high and low level alarm points. The magnitude of the transients and the time required for the plant to return to equilibrium was dependent upon the size of the the load change. The pressurizer spray was effective in reducing reactor coolant pressure positive surges; however, this resulted in larger negative surges than when the spray valve was closed.
Date: November 6, 1959
Creator: Gentry, George
System: The UNT Digital Library