Fabrication of Uranium Wire (open access)

Fabrication of Uranium Wire

From abstract: "The present report describes experimental work performed to establish a procedure for the production of uranium metal wire. In all cases, the size of the initial rod was 1/2 inch diameter. Three materials were used: hot extruded tuballoy rod, high purity cast tuballoy rod, and cast U-235 rod."
Date: October 25, 1949
Creator: Anderson, R. E.; Taub, J. M. & Doll, D. T.
System: The UNT Digital Library
Direct Current Electromagnetic Pumps (open access)

Direct Current Electromagnetic Pumps

Abstract: "A number of direct current conduction type electromagnetic pumps for liquid metals were constructed. Pumping capacities of over 400 gpm and efficiencies of over 50 percent were obtained. NaK alloy at temperatures up to 400 C was used in the test. The large currents required were obtained from rectifiers or from a homopolar generator constructed for the purpose."
Date: October 25, 1949
Creator: Barnes, A. H.; Smith, F. A. & Whitham, G. K.
System: The UNT Digital Library
Progress Report on Carnotite Studies; Carbonate Processes: September 1949 (open access)

Progress Report on Carnotite Studies; Carbonate Processes: September 1949

This is a progress report on the carbonate process, compiled by the chemical development department of the Carbide and Carbon Chemicals Corporation's Y-12 plant, covering the month of September, 1949. In the previous month, the problem of immediate interest to the Monticello operation were listed. Projects that were left incomplete during that time were continued during this month, as well as a brief investigation of the process in which raw ore is leached with sodium carbonate, the sands and slime separated, the sands leached with acid, and the slimes roasted in a pellitized form.
Date: October 6, 1949
Creator: Brown, K. B. & Coleman, C. F.
System: The UNT Digital Library
Preparation of Ductile Zirconium: Progress Report for September 1949 (open access)

Preparation of Ductile Zirconium: Progress Report for September 1949

Abstract: A report was submitted describing the apparatus which is proposed for further dissociation experiments and approval for necessary construction was requested. While awaiting approval, detailed designs were completed and some experimental work necessary for this design was carried out. The casting equipment was modified in accordance with experimental work for casting of zirconium. The apparatus was tested and it was found possible to form and withdraw and ingot of zirconium.
Date: October 10, 1949
Creator: DiPietro, W. O.; Findlay, G. R. & Stauffer, R. A.
System: The UNT Digital Library
Purification of Graphite : (Supplementary Document to HW-12780) (open access)

Purification of Graphite : (Supplementary Document to HW-12780)

Report discussing experiments and developments in purification of graphite starting from March, 1949.
Date: October 4, 1949
Creator: Garbrecht, M.
System: The UNT Digital Library
Survey of the Present Status of Isotope Separation Methods (open access)

Survey of the Present Status of Isotope Separation Methods

The problem of the separation or enrichment of isotopes is as old as the knowledge of the existence of isotopes of stable elements. The article focuses on the mass-dependent property of atoms continuing to be investigated in laboratories to test its usefulness for new solutions to this problem.
Date: October 14, 1949
Creator: Groth, W. (Wilhelm)
System: The UNT Digital Library
Materials Testing Reactor Project : Reactor Building, Design Report No. 26 (open access)

Materials Testing Reactor Project : Reactor Building, Design Report No. 26

The following report discusses the building design and development of the reactor building, Building 1105, for Argonne National Laboratory, that is meant to house the reactor.
Date: October 10, 1949
Creator: Guzik, R. F. & Link, L. E.
System: The UNT Digital Library
Materials Testing Reactor Project : Reactor Building Wing, Design Report No. 27 (open access)

Materials Testing Reactor Project : Reactor Building Wing, Design Report No. 27

The following report describes the design and construction of the reactor building wing, designed to attach to the reactor building for the Argonne National Laboratory.
Date: October 12, 1949
Creator: Guzik, R. F. & Link, L. E.
System: The UNT Digital Library
The Preparation of Aluminium Nitrate from Hydrated Aluminum Oxides (open access)

The Preparation of Aluminium Nitrate from Hydrated Aluminum Oxides

This report discusses methods of producing aluminum nitrate for the Redox process. Large amounts of aluminum nitrate are consumed during the Redox process, so this report explores preparation of this material through the dissolution of hydrated aluminum oxide in nitric acid.
Date: October 5, 1949
Creator: Harmon, M. K.
System: The UNT Digital Library
The Determination of Free Nitric Acid in Solutions Containing Uranyl Nitrate, Aluminum Nitrtae and Sodium Dichromate (open access)

The Determination of Free Nitric Acid in Solutions Containing Uranyl Nitrate, Aluminum Nitrtae and Sodium Dichromate

The following report describes the developmental process of the determination of free nitric acid in solutions containing uranyl nitrate, aluminum nitrate and sodium dichromate.
Date: October 21, 1949
Creator: Moore, Robert Lee & Schmidt, H. R.
System: The UNT Digital Library
Summary of the Research Progress Meeting of September 1, 1949 (open access)

Summary of the Research Progress Meeting of September 1, 1949

The absolute excitation functions for the production of fission by charged particle bombardment in several substances were investigated at both high and low energies. The low energy work was done at the 60-inch Crocker cyclotron with alpha particles and deuterons, while the high energy work was done at the 184-inch cyclotron with alpha particles, deuterons, and protons.
Date: October 13, 1949
Creator: Wakerling, R. K. (Raymond Kornelious), 1914-
System: The UNT Digital Library