Events of importance for week ending May 4, 1949 (open access)

Events of importance for week ending May 4, 1949

This report details events of importance reported by the Hanford Operations Office for the week ending May 4, 1949.
Date: May 6, 1949
Creator: Schlemmer, F. C.
System: The UNT Digital Library
Material balance flowsheet Redox Production plant (open access)

Material balance flowsheet Redox Production plant

The attached material balance flowsheet for the proposed Redox Production plant is based on the two chemical flowsheets submitted by R.B. Richards of the Technical Division in HW 13,320 (INDC-3130) and HW 13,452 (INDC 3176). Production rates for the plant have been assumed as 2.5 short tone U per day (including a maximum of 0.75 short tons of U from stored Bi PO{sub 4} waste) and 19 kg. Pu per month (633 gms/day) as established by the Redox Committee. The flowsheets for preparation of solvent extraction feed from Bi PO{sub 4} waste, as well as the waste treatment systems will be covered in a future document.
Date: June 6, 1949
Creator: Tomlinson, R.E.
System: The UNT Digital Library
P Division monthly report, September 1949 (open access)

P Division monthly report, September 1949

This progress report discusses the activities of the P Division for the month of September, 1949. The B and F piles operated at 275 megawatts (MW) and the D pile at 305 MW throughout the month except for cutages listed under Area Activities. A total of 60.22 tons of metal, at an average concentration of 396 megawatt days/ton (MWD/ton) was discharged from the piles during the month. The 105-H Building was accepted from the Construction Division on September 28 with certain exceptions noted under the Operating Experience section of this report. At month end P Division operating personnel are making preparations for activation of the H pile. On September 28 the operation of the 300 Area oxide burning process was reduced from a two shift to a one shift five day operation. This change in schedule was possible as a result of working off the backlog of uranium oxide. The shipment of 200 tons of canned slugs to Building 105-DR for storage was completed on September 9 and the shipment of 250 tons of canned slugs to Building 105-H for the initial loading charge was completed on September 26.
Date: October 6, 1949
Creator: Lee, Edward P.
System: The UNT Digital Library